ATH-US 33-14.40
ATH County · est $7.6M
Bid dateThursday, April 14—
ATH County · est $7.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 155 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Shelly & Sands INC | % of bid |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 10,622 CY | $160 | $170 | 24% |
| 304E20000 AGGREGATE BASE | 8,456 CY | $80.00 | $81.00 | 10% |
| 861E11100 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 2,266 CY | $230 | $225 | 7% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,998 CY | $250 | $240 | 7% |
| 202E23000 PAVEMENT REMOVED | 54,099 SY | $9.00 | $9.25 | 7% |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 5 EACH | $78,766 | $69,350 | 6% |
| 203E10000 EXCAVATION | 29,222 CY | $13.23 | $23.00 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 17,750 FT | $21.00 |
| Item | Quantity | R1Alan Stone CO INC | R2Shelly & Sands INC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $240,000 |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN, BRIDGE NO. ATH-50- | 1 LS | $75,000 | $140,000 |
| 202E30700 CONCRETE BARRIER REMOVED | 300 FT | $14.09 | $12.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 573 FT | $16.46 | $25.00 |
| 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN | 13,480 FT | $1.26 | $2.00 |
| 202E38000 GUARDRAIL REMOVED | 5,700 FT | $1.30 | $1.80 |
| 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN | 837.5 FT | $22.85 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $11.25 |
| 5% |
| 832E30000 EROSION CONTROL | 300,000 EACH | $1.00 | $1.00 | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $282,947 | $300,000 | 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 21,895 FT | $11.47 | $12.00 | 4% |
| 611E96600 CONDUIT, BORED OR JACKED, 36" | 210 FT | $923 | $550 | 3% |
| 452E13020 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P W | 1,240 SY | $125 | $90.00 | 2% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 5,269 SF | $29.25 | $23.50 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $150,000 | $200,000 | 2% |
| 625E10490 LIGHT POLE, CONVENTIONALDESIGN AT15B35 | 37 EACH | $3,783 | $3,114 | 2% |
| 625E24350 1-1/2" DUCT CABLE WITH FOUR NO. 4 AWG 2400 VOLT CA | 8,140 FT | $15.53 | $12.00 | 2% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 40 EACH | $2,767 | $1,411 | 2% |
| 625E29002 TRENCH, 24" DEEP | 7,942 FT | $13.56 | $8.85 | 2% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 11 EACH | $9,564 | $8,960 | 1% |
| $2.20 |
| 202E58100 CATCH BASIN REMOVED | 7 EACH | $314 | $150 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 20" | 263 FT | $24.36 | $18.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 24" | 102 FT | $38.41 | $35.00 |
| 203E10001 EXCAVATION, AS PER PLAN, (ROCK) | 2,005 CY | $17.10 | $38.00 |
| 203E20000 EMBANKMENT | 4,738 CY | $2.19 | $6.75 |
| 204E10000 SUBGRADE COMPACTION | 51,971 SY | $0.98 | $2.00 |
| 204E45000 PROOF ROLLING | 27 HOUR | $220 | $400 |
| 606E15050 GUARDRAIL, TYPE MGS | 3,337.5 FT | $23.63 | $21.20 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 137.5 FT | $25.32 | $22.60 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 37.5 FT | $33.75 | $28.80 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 15 EACH | $2,363 | $2,080 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $3,094 | $2,850 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 11 EACH | $1,407 | $1,395 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 10 EACH | $2,813 | $2,740 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $5,907 | $535 |
| 606E60002 IMPACT ATTENUATOR, TYPE 1 (UNIDIRECTIONAL) | 2 EACH | $4,501 | $5,850 |
| 622E10060 CONCRETE BARRIER, SINGLE SLOPE, TYPE B | 270 FT | $150 | $225 |
| 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 | 100 FT | $189 | $190 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 75 FT | $537 | $250 |
| 622E24840 CONCRETE BARRIER END SECTION, TYPE B | 1 EACH | $5,821 | $6,250 |
| 622E24850 CONCRETE BARRIER END SECTION, TYPE B1 | 1 EACH | $6,222 | $6,500 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 3 EACH | $5,831 | $5,100 |
| 622E25004 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $5,821 | $5,500 |
| 622E25006 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $7,140 | $6,000 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $5,821 | $5,500 |
| 601E11000 RIPRAP, TYPE D | 25 SY | $144 | $250 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 9 CY | $124 | $260 |
| 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN | 130 FT | $99.80 | $105 |
| 659E00300 TOPSOIL | 1,131 CY | $35.80 | $12.00 |
| 659E10000 SEEDING AND MULCHING | 65,362 SY | $0.98 | $0.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 300 SY | $4.71 | $0.75 |
| 659E15000 INTER-SEEDING | 300 SY | $0.14 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 9 TON | $563 | $250 |
| 659E31000 LIME | 14 ACRE | $792 | $25.00 |
| 659E35000 WATER | 353 MGAL | $0.01 | $0.01 |
| 670E00500 SLOPE EROSION PROTECTION | 9,519 SY | $2.21 | $1.25 |
| 670E00700 DITCH EROSION PROTECTION | 658 SY | $5.62 | $1.35 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,813 | $10,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $14,077 | $25,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,528 | $15,000 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1.3 CY | $2,333 | $2,100 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 2,352 FT | $12.20 | $12.50 |
| 605E13510 6" ROCK CUT UNDERDRAINS WITH GEOTEXTILE FABRIC | 400 FT | $18.40 | $25.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 970 FT | $28.13 | $35.00 |
| 611E04400 12" CONDUIT, TYPE B | 71 FT | $82.82 | $88.00 |
| 611E07400 18" CONDUIT, TYPE B | 322 FT | $117 | $130 |
| 611E07600 18" CONDUIT, TYPE C | 143 FT | $116 | $110 |
| 611E10400 24" CONDUIT, TYPE B | 229 FT | $113 | $200 |
| 611E10600 24" CONDUIT, TYPE C | 79 FT | $53.42 | $125 |
| 611E98150 CATCH BASIN, NO. 3 | 4 EACH | $2,631 | $4,250 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $2,272 | $3,400 |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $3,777 | $7,000 |
| 611E98370 CATCH BASIN, NO. 6 | 2 EACH | $2,068 | $3,200 |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $2,098 | $2,900 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $2,187 | $3,100 |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $3,059 | $4,000 |
| 611E99574 MANHOLE, NO. 3 | 5 EACH | $3,592 | $4,100 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 12 EACH | $266 | $400 |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 197 CY | $122 | $90.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 354 FT | $6.81 | $2.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 1,436 SY | $6.94 | $8.00 |
| 407E20000 NON-TRACKING TACK COAT | 7,884 GAL | $5.00 | $3.25 |
| 441E00100 ANTI-SEGREGATION EQUIPMENT | 4,262 CY | $5.00 | $11.50 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (160 CY | $350 | $400 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 618 FT | $60.00 | $60.00 |
| 609E24000 CURB, TYPE 4-A | 36 FT | $40.00 | $65.00 |
| 609E26000 CURB, TYPE 6 | 207 FT | $47.00 | $51.00 |
| 609E28000 CURB, TYPE 7 | 226 FT | $50.00 | $49.00 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 138 FT | $60.00 | $65.00 |
| 609E72100 CONCRETE MEDIAN | 30 CY | $610 | $450 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 17,118 FT | $1.50 | $1.25 |
| 618E40200 RUMBLE STRIPS, SHOULDER (CONCRETE) | 192 FT | $50.00 | $2.25 |
| 625E00450 CONNECTION, FUSED PULL APART | 80 EACH | $102 | $118 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 40 EACH | $102 | $115 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 105 EACH | $102 | $109 |
| 625E10490 LIGHT POLE, CONVENTIONALDESIGN AT15BB35 | 3 EACH | $4,743 | $3,929 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 8,656 FT | $4.12 | $3.08 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,365 FT | $2.08 | $5.10 |
| 625E25500 CONDUIT, 3", 725.04 | 27 FT | $43.48 | $40.10 |
| 625E25600 CONDUIT, 4", 725.04 | 35 FT | $60.98 | $56.40 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 1,069 FT | $66.63 | $55.50 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 6 EACH | $480 | $478 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 34 EACH | $480 | $478 |
| 625E30700 PULL BOX, 725.08, 18" | 27 EACH | $960 | $871 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $1,412 | $1,021 |
| 625E31510 PULL BOX REMOVED | 28 EACH | $169 | $110 |
| 625E32000 GROUND ROD | 51 EACH | $311 | $440 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $11,148 | $9,461 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 7,994 FT | $2.26 | $0.14 |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 41 EACH | $367 | $165 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 41 EACH | $226 | $171 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $452 | $220 |
| 625E75551 DISTRIBUTION CABLE REMOVED, AS PER PLAN | 13,181 FT | $0.56 | $0.88 |
| 621E00100 RPM | 468 EACH | $47.09 | $35.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 393 EACH | $9.65 | $9.50 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 6 EACH | $11.25 | $9.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 34 EACH | $9.56 | $9.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 449 FT | $14.07 | $13.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 110.5 FT | $28.13 | $38.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 43.7 FT | $36.00 | $50.00 |
| 630E08600 SIGN POST REFLECTOR | 13 EACH | $47.26 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 6 EACH | $394 | $525 |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 1 EACH | $56,261 | $46,400 |
| 630E75001 SIGN ATTACHMENT ASSEMBLY, AS PER PLAN | 13 EACH | $3,094 | $1,780 |
| 630E80100 SIGN, FLAT SHEET | 245 SF | $20.82 | $15.90 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 434 SF | $29.25 | $23.00 |
| 630E82000 SIGN BACKING ASSEMBLY | 10 EACH | $225 | $160 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 8 EACH | $1,125 | $575 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 33 EACH | $19.69 | $10.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 7 EACH | $141 | $180 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 34 EACH | $19.69 | $20.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 6 EACH | $394 | $165 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 35 EACH | $309 | $185 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 1 EACH | $1,688 | $1,170 |
| 630E89802 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 2 EACH | $3,376 | $1,960 |
| 631E97700 SIGN LIGHTING MISC.:REMOVAL OF SIGN LIGHTING | 4 EACH | $452 | $400 |
| 644E00104 EDGE LINE, 6" | 0.42 MILE | $8,368 | $6,000 |
| 644E00300 CENTER LINE | 0.13 MILE | $13,807 | $9,900 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 246 FT | $11.15 | $8.00 |
| 644E01520 DOTTED LINE, 12" | 154 FT | $2.79 | $2.00 |
| 644E20800 YIELD LINE ,24" | 30 FT | $19.53 | $14.00 |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 5.56 MILE | $6,806 | $4,880 |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 0.31 MILE | $4,881 | $3,500 |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 10,347 FT | $3.49 | $2.50 |
| 807E14430 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT | 2,150 FT | $2.09 | $1.50 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $4,602 | $3,300 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.37 | $1.70 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $79.91 | $70.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,194 | $2,200 |
| 614E12410 SPEED ZONE AHEAD SYMBOL SIGN | 6 EACH | $174 | $100 |
| 614E12490 RESUME LEGAL SPEED SIGN | 6 EACH | $146 | $100 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $360 | $180 |
| 614E12600 REPLACEMENT DRUM | 50 EACH | $113 | $90.00 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 16 EACH | $4.72 | $24.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1,UNIDIRECTIONAL | 719 EACH | $16.88 | $6.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 719 EACH | $18.01 | $18.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: SIGN AND SUPPORT | 8 EACH | $636 | $100 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 72 SNMT | $1,181 | $900 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.06 MILE | $6,549 | $14,000 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 14.74 MILE | $2,419 | $1,505 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 36 FT | $5.06 | $12.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $6,766 | $100,000 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 1,490 SY | $19.69 | $125 |
| 616E10000 WATER | 10 MGAL | $1.00 | $35.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 60 SNMT | $956 | $675 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $75,000 | $75,000 |
| 619E16020 FIELD OFFICE, TYPE C | 18 MNTH | $1,800 | $3,150 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $100,000 | $140,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 10,622 CY | $160 | $1.70M | 18% |
| 304E20000 AGGREGATE BASE | 8,456 CY | $80 | $676k | 7% |
| 861E11100 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 2,266 CY | $230 | $521k | 5% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,998 CY | $250 | $500k | 5% |
| 202E23000 PAVEMENT REMOVED | 54,099 SY | $9 | $487k | 5% |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 5 EACH | $78,766 | $394k | 4% |
| 203E10000 EXCAVATION | 29,222 CY | $13.23 | $387k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 17,750 FT | $21 | $373k | 4% |
| 832E30000 EROSION CONTROL | 300,000 EACH | $1 | $300k | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $282,947 | $283k | 3% |