GUE-IR 70-08.80
GUE County · est $0.4M
Bid dateThursday, April 28—
GUE County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 53 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Buds INC | % of bid |
|---|---|---|---|---|
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 923 SY | $88.00 | $135 | 23% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 1,500 DLR | $28.00 | $28.00 | 12% |
| 203E20000 EMBANKMENT | 1,360 CY | $30.00 | $18.00 | 11% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (117 CY | $300 | $181 | 10% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 100 CY | $350 | $226 | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(T=3.25) | 1,492 SY | $10.00 | $12.00 | 4% |
| 304E20000 AGGREGATE BASE | 160 CY | $82.00 | $96.00 | 4% |
| 832E30000 EROSION CONTROL | 10,000 EACH |
| Item | Quantity | R1Shelly & Sands INC | R2Buds INC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,366 | $1,500 |
| 202E23000 PAVEMENT REMOVED | 268 SY | $9.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 225 FT | $3.50 | $3.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 50 FT | $2.00 | $4.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $350 | $350 |
| 203E10000 EXCAVATION | 353 CY | $5.75 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 1,015 SY | $4.00 | $2.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.00 |
| $1.00 |
| 3% |
| 632E26500 DETECTOR LOOP | 5 EACH | $2,000 | $2,650 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,500 | $5,500 | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 584 FT | $13.50 | $18.50 | 2% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 110 FT | $70.00 | $68.00 | 2% |
| 625E25402 CONDUIT, 2", 725.05 | 975 FT | $7.00 | $14.00 | 2% |
| 632E65300 LOOP DETECTOR LEAD-IN CABLE, 2 CONDUCTOR, NO. 14 A | 3,165 FT | $2.10 | $2.00 | 2% |
| 625E29000 TRENCH | 825 FT | $8.00 | $10.00 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,000 | $4,000 | 2% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $1,400 | $1,400 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $850 | $950 | 1% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 50 CY | $85.00 | $60.00 | 1% |
| 204E13000 EXCAVATION OF SUBGRADE | 50 CY | $25.00 | $20.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $224 | $50.00 |
| 204E50000 GEOTEXTILE FABRIC | 150 SY | $2.75 | $1.35 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 50 FT | $10.00 | $5.00 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $1,500 | $1,500 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 1 EACH | $15.00 | $15.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $225 | $325 |
| 659E10000 SEEDING AND MULCHING | 2,374 SY | $1.45 | $0.95 |
| 659E20000 COMMERCIAL FERTILIZER | 0.33 TON | $800 | $800 |
| 659E31000 LIME | 0.49 ACRE | $80.00 | $80.00 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 100 FT | $15.25 | $2.50 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $15.50 | $2.50 |
| 611E01500 6" CONDUIT, TYPE F | 123 FT | $20.00 | $25.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $291 | $200 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 585 FT | $2.50 | $4.00 |
| 407E20000 NON-TRACKING TACK COAT | 189 GAL | $3.25 | $4.00 |
| 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO | 325 SY | $12.00 | $23.00 |
| 621E00100 RPM | 37 EACH | $86.00 | $80.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 41 EACH | $12.00 | $5.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 42 FT | $15.00 | $15.00 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 33 FT | $50.00 | $50.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 29 FT | $35.00 | $35.00 |
| 630E08600 SIGN POST REFLECTOR(RED) | 1 EACH | $50.00 | $50.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $600 | $600 |
| 630E80100 SIGN, FLAT SHEET | 21 SF | $30.00 | $30.00 |
| 630E82000 SIGN BACKING ASSEMBLY | 1 EACH | $250 | $250 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $25.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $75.00 | $75.00 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 2 EACH | $500 | $500 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $25.00 | $15.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 4 EACH | $350 | $350 |
| 644E00104 EDGE LINE, 6" | 0.24 MILE | $5,300 | $5,300 |
| 644E00204 LANE LINE, 6" | 0.03 MILE | $3,900 | $3,900 |
| 644E00404 CHANNELIZING LINE, 12" | 389 FT | $2.10 | $2.10 |
| 644E00500 STOP LINE | 51 FT | $8.90 | $8.90 |
| 644E01300 LANE ARROW | 7 EACH | $140 | $140 |
| 644E01400 WORD ON PAVEMENT, 72" | 1 EACH | $140 | $140 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,100 | $1,200 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,300 | $1,400 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 825 FT | $1.25 | $1.30 |
| 632E27104 LOOP DETECTOR UNIT, 2 CHANNEL, DELAY AND EXTENSION | 5 EACH | $250 | $200 |
| 632E90500 SIGNALIZATION, MISC.:REMOVAL OF LOOP LEAD-IN CABLE | 2,200 FT | $1.00 | $1.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,000 | $8,000 |
| 616E10000 WATER | 7 MGAL | $40.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 923 SY | $88 | $81k | 19% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 1,500 DLR | $28 | $42k | 10% |
| 203E20000 EMBANKMENT | 1,360 CY | $30 | $41k | 10% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (117 CY | $300 | $35k | 8% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 100 CY | $350 | $35k | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(T=3.25) | 1,492 SY | $10 | $15k | 4% |
| 304E20000 AGGREGATE BASE | 160 CY | $82 | $13k | 3% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1 | $10k | 2% |
| 632E26500 DETECTOR LOOP | 5 EACH | $2,000 | $10k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |