PRE-Geeding St Bridge Replacemnt
PRE County · est $0.3M
Bid dateThursday, April 28—
PRE County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 35 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Outdoor Enterprise LLC | R3Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|
| 611E96448 16' X 7' CONDUIT, TYPE A, 706.05 | 24 FT | $3,890 | $2,100 | $3,027 | 30% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $29,633 | $17,500 | $13,018 | 10% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 30 CY | $950 | $600 | $1,035 | 9% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $19,000 | $14,000 | $6,235 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $18,856 | $12,000 | $34,278 |
| Item | Quantity | R1Brumbaugh Construction INC | R2Outdoor Enterprise LLC | R3Sunesis Construction CO |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 60 CY | $24.00 | $120 | $49.48 |
| 204E10000 SUBGRADE COMPACTION | 143 SY | $2.00 | $2.00 | $11.25 |
| 204E45000 PROOF ROLLING | 1 HOUR | $250 | $150 | $393 |
| 606E15050 GUARDRAIL, TYPE MGS | 50 FT | $30.00 | $30.00 | $28.27 |
| 659E10000 SEEDING AND MULCHING | 596 SY | $3.25 | $10.00 | $5.62 |
| 659E14000 REPAIR SEEDING AND MULCHING |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E - NCHRP 350 OR MASH 20 | 4 EACH | $4,550 | $3,000 | $4,241 | 6% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 12 CY | $1,350 | $2,500 | $3,389 | 5% |
| 611E16600 36" CONDUIT, TYPE C | 80 FT | $170 | $280 | $265 | 4% |
| 301E46010 ASPHALT CONCRETE BASE, PG64-28-449 | 24 CY | $435 | $440 | $757 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,059 LB | $2.00 | $4.50 | $3.33 | 3% |
| 203E20000 EMBANKMENT | 259 CY | $29.00 | $60.00 | $39.39 | 2% |
| 606E15350 GUARDRAIL, TYPE MGS WITH SOCKETED POSTS | 50 FT | $135 | $240 | $104 | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 105 SY | $55.00 | $20.00 | $27.93 | 2% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $5,500 | $8,000 | $2,741 | 2% |
| 611E98540 CATCH BASIN, NO. 2-4 | 2 EACH | $2,750 | $4,800 | $3,447 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $12,000 | $7,573 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,500 | $2,000 | $7,998 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,000 | $2,000 | $3,382 | 1% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 3 CY | $1,300 | $1,800 | $2,368 | 1% |
| 659E00300 TOPSOIL | 66 CY | $54.00 | $100 | $59.63 | 1% |
| 30 SY |
| $3.00 |
| $10.00 |
| $3.78 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $1,500 | $900 | $1,815 |
| 659E31000 LIME | 0.12 ACRE | $150 | $900 | $189 |
| 659E35000 WATER | 3.2 MGAL | $5.00 | $50.00 | $1.40 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 607E35000 FENCE REMOVED AND REBUILT | 25 FT | $50.00 | $100 | $25.24 |
| 611E10600 24" CONDUIT, TYPE C-706.02 | 10 FT | $125 | $320 | $503 |
| 202E23000 PAVEMENT REMOVED | 138 SY | $10.00 | $26.00 | $24.66 |
| 304E20000 AGGREGATE BASE | 24 CY | $71.00 | $105 | $170 |
| 407E20000 NON-TRACKING TACK COAT | 16 GAL | $27.00 | $28.00 | $5.05 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 6 CY | $435 | $440 | $1,212 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (6 CY | $435 | $440 | $1,161 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 - BIDIRECTIONAL | 8 EACH | $12.00 | $17.00 | $11.11 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 96 FT | $14.00 | $25.00 | $13.13 |
| 630E80100 SIGN, FLAT SHEET | 42 SF | $17.00 | $30.00 | $16.16 |
| 202E23500 WEARING COURSE REMOVED | 52 SY | $7.50 | $20.00 | $44.89 |
| 202E38500 BRIDGE RAILING REMOVED | 53 FT | $10.00 | $140 | $4.04 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22-449 | 7 CY | $435 | $440 | $757 |
| 304E20000 AGGREGATE BASE | 7 CY | $77.00 | $105 | $242 |
| 407E20000 NON-TRACKING TACK COAT | 5 GAL | $27.00 | $28.00 | $5.05 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 2 CY | $435 | $440 | $1,212 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2 CY | $435 | $440 | $1,161 |
| 503E21100 UNCLASSIFIED EXCAVATION | 36 CY | $30.00 | $140 | $490 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 64 SY | $35.00 | $80.00 | $76.45 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 40 SF | $10.00 | $30.00 | $3.56 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 12 CY | $100 | $250 | $290 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 17 CY | $140 | $300 | $216 |
| 601E34400 ROCK CHANNEL PROTECTION, WITH GROUT - TYPE A | 4 CY | $415 | $950 | $469 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,750 | $4,400 | $0.01 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,500 | $30,000 | $7,559 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96448 16' X 7' CONDUIT, TYPE A, 706.05 | 24 FT | $3,890 | $93k | 27% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $29,633 | $30k | 8% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 30 CY | $950 | $29k | 8% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $19,000 | $19k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $18,856 | $19k | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E - NCHRP 350 OR MASH 20 | 4 EACH | $4,550 | $18k | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 12 CY | $1,350 | $16k | 5% |
| 611E16600 36" CONDUIT, TYPE C | 80 FT | $170 | $14k | 4% |
| 301E46010 ASPHALT CONCRETE BASE, PG64-28-449 | 24 CY | $435 | $10k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,059 LB | $2 | $8k | 2% |