WAR-Clear Crk Bikepath Connector
WAR County · est $3.6M
Bid dateThursday, April 28—
WAR County · est $3.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 94 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Barrett Paving Materials INC | R4John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|
| 513E10121 STRUCTURAL STEEL MEMBERS, LEVEL 6, AS PER PLAN | 1 LS | $1,000,000 | $890,600 | $890,000 | $921,390 | 35% |
| 203E10000 EXCAVATION | 15,137 CY | $12.50 | $18.00 | $13.00 | $10.00 | 7% |
| 832E30000 EROSION CONTROL | 170,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $155,000 | $255,000 | $235,000 |
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Barrett Paving Materials INC | R4John R Jurgensen Company |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $200 | $350 | $425 | $482 |
| 202E23000 PAVEMENT REMOVED | 1,019 SY | $6.50 | $7.00 | $10.00 | $17.54 |
| 202E30000 WALK REMOVED | 248 SF | $2.00 | $2.50 | $6.00 | $9.10 |
| 202E32000 CURB REMOVED | 394 FT | $9.00 | $3.50 | $7.00 | $10.34 |
| 202E35200 PIPE REMOVED, OVER 24" |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $154,836 |
| 5% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,380 FT | $110 | $75.00 | $75.00 | $64.00 | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (486 CY | $290 | $265 | $250 | $285 | 5% |
| 870E10001 PREFABRICATED MODULAR RETAINING WALL, AS PER PLAN | 1,658 SF | $78.00 | $106 | $100 | $112 | 5% |
| 607E98000 FENCE, MISC.: WOOD BIKEWAY RAILING | 2,492 FT | $50.00 | $47.00 | $65.00 | $65.00 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $110,000 | $136,000 | $136,000 | $250,259 | 4% |
| 304E20000 AGGREGATE BASE | 1,821 CY | $60.00 | $72.00 | $85.00 | $85.81 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 347 CY | $300 | $275 | $315 | $320 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $101,958 | $100,000 | $100,000 | $100,000 | 4% |
| 203E20000 EMBANKMENT | 9,044 CY | $7.75 | $12.00 | $13.00 | $9.00 | 2% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 99 CY | $550 | $400 | $400 | $606 | 2% |
| 659E00300 TOPSOIL | 3,173 CY | $15.00 | $15.00 | $35.00 | $3.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $40,000 | $34,000 | $75,500 | $35,974 | 1% |
| 601E34400 ROCK CHANNEL PROTECTION, WITH GROUT (TYPE C, WITH | 278 CY | $140 | $155 | $280 | $253 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $34,000 | $20,000 | $21,809 | 1% |
| 870E11000 WALL EXCAVATION | 530 CY | $50.00 | $40.00 | $95.00 | $168 | 1% |
| 659E10000 SEEDING AND MULCHING | 28,584 SY | $0.90 | $1.50 | $0.95 | $0.90 | 1% |
| 26 FT |
| $50.00 |
| $15.00 |
| $30.00 |
| $57.04 |
| 202E38000 GUARDRAIL REMOVED | 115 FT | $6.00 | $2.60 | $6.25 | $6.25 |
| 202E75000 FENCE REMOVED | 262 FT | $6.00 | $4.00 | $6.00 | $6.00 |
| 204E10000 SUBGRADE COMPACTION | 13,150 SY | $1.25 | $2.25 | $2.00 | $2.58 |
| 204E45000 PROOF ROLLING | 6 HOUR | $100 | $200 | $200 | $219 |
| 606E15050 GUARDRAIL, TYPE MGS | 25 FT | $30.00 | $62.50 | $29.00 | $29.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,900 | $3,920 | $2,800 | $2,800 |
| 607E23000 FENCE, TYPE CLT | 230 FT | $30.00 | $34.20 | $30.00 | $30.00 |
| 608E52000 CURB RAMP | 599 SF | $24.00 | $19.99 | $18.00 | $19.90 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 74 EACH | $200 | $200 | $75.00 | $725 |
| 690E50500 SPECIAL - CONCRETE PARKING BLOCK | 26 EACH | $175 | $250 | $195 | $365 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $20,000 | $47,500 | $45,000 | $56,000 |
| 601E11000 RIPRAP, TYPE D | 28 SY | $190 | $265 | $400 | $933 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 19.1 CY | $130 | $140 | $330 | $235 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $125 | $350 | $150 | $750 |
| 659E20000 COMMERCIAL FERTILIZER | 3.9 TON | $700 | $1,250 | $1,400 | $1,400 |
| 659E31000 LIME | 5.9 ACRE | $5.00 | $5.00 | $50.00 | $50.00 |
| 659E35000 WATER | 155 MGAL | $5.00 | $20.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 20,116 SY | $1.25 | $2.25 | $1.50 | $1.50 |
| 670E00700 DITCH EROSION PROTECTION | 754 SY | $4.25 | $2.25 | $1.50 | $1.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,700 | $2,000 | $5,000 | $1,525 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,000 | $15,000 | $20,000 | $8,925 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $13,000 | $15,000 | $15,000 | $13,271 |
| 602E20000 CONCRETE MASONRY | 5.49 CY | $3,800 | $1,650 | $1,955 | $2,550 |
| 611E01800 8" CONDUIT, TYPE B | 100 FT | $8.00 | $9.00 | $20.00 | $61.97 |
| 611E02500 8" CONDUIT, TYPE E | 100 FT | $8.00 | $8.00 | $20.00 | $61.97 |
| 611E02600 8" CONDUIT, TYPE F | 100 FT | $8.00 | $7.00 | $20.00 | $61.97 |
| 611E04400 12" CONDUIT, TYPE B | 105 FT | $35.00 | $65.00 | $70.00 | $87.90 |
| 611E04600 12" CONDUIT, TYPE C | 163 FT | $35.00 | $50.00 | $70.00 | $94.50 |
| 611E04900 12" CONDUIT, TYPE D | 62 FT | $50.00 | $50.00 | $70.00 | $86.80 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 24 FT | $60.00 | $100 | $76.00 | $132 |
| 611E06400 15" CONDUIT, TYPE D | 29 FT | $63.00 | $85.00 | $76.00 | $141 |
| 611E07600 18" CONDUIT, TYPE C, 706.02 | 150 FT | $65.00 | $90.00 | $80.00 | $128 |
| 611E07900 18" CONDUIT, TYPE D | 26 FT | $70.00 | $90.00 | $80.00 | $132 |
| 611E09400 21" CONDUIT, TYPE D | 76 FT | $75.00 | $105 | $85.00 | $123 |
| 611E10900 24" CONDUIT, TYPE D | 50 FT | $100 | $75.00 | $85.00 | $137 |
| 611E10900 24" CONDUIT, TYPE D, 706.02, 707.01 ALUMINIZED, 70 | 72 FT | $130 | $82.00 | $85.00 | $163 |
| 611E22200 54" CONDUIT, TYPE A, 706.02, 707.02 ALUMINIZED, 70 | 88 FT | $260 | $300 | $260 | $585 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $2,200 | $3,800 | $4,550 | $3,309 |
| 611E98470 CATCH BASIN, NO. 2-2B | 4 EACH | $2,200 | $1,850 | $2,000 | $1,903 |
| 253E02000 PAVEMENT REPAIR | 5 CY | $500 | $250 | $385 | $1,429 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 75 CY | $300 | $250 | $190 | $330 |
| 407E20000 NON-TRACKING TACK COAT | 652 GAL | $6.00 | $1.00 | $3.50 | $5.00 |
| 408E10000 PRIME COAT | 4,009 GAL | $6.00 | $2.00 | $6.00 | $5.00 |
| 609E26000 CURB, TYPE 6 | 394 FT | $33.00 | $24.99 | $22.00 | $24.79 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 253 SY | $80.00 | $62.00 | $62.00 | $62.00 |
| 638E00700 6" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, MEC | 10 FT | $150 | $225 | $430 | $395 |
| 638E07480 6" GATE VALVE | 1 EACH | $1,200 | $2,000 | $2,700 | $2,700 |
| 638E10200 6" FIRE HYDRANT | 1 EACH | $6,000 | $5,500 | $8,800 | $5,649 |
| 638E10701 FIRE HYDRANT REMOVED AND DISPOSED OF, AS PER PLAN | 1 EACH | $300 | $650 | $2,625 | $1,490 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 11 EACH | $20.00 | $8.50 | $15.50 | $15.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 357 FT | $15.00 | $13.25 | $22.00 | $22.00 |
| 630E08600 SIGN POST REFLECTOR (RED) | 1 EACH | $50.00 | $45.00 | $43.00 | $43.00 |
| 630E80100 SIGN, FLAT SHEET | 65 SF | $20.00 | $18.50 | $24.00 | $24.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $75.00 | $65.00 | $45.00 | $45.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $15.00 | $15.00 | $30.00 | $30.00 |
| 644E00300 CENTER LINE | 0.3 MILE | $11,000 | $7,404 | $10,863 | $7,404 |
| 644E00500 STOP LINE | 29 FT | $20.00 | $11.89 | $20.00 | $11.89 |
| 644E00620 CROSSWALK LINE, 12" | 83 FT | $10.00 | $5.95 | $10.00 | $5.95 |
| 644E01300 LANE ARROW | 2 EACH | $300 | $112 | $300 | $112 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 49 FT | $50.00 | $17.74 | $45.00 | $17.74 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 2 EACH | $300 | $869 | $300 | $869 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 5 CY | $65.00 | $120 | $185 | $355 |
| 608E21200 TEMPORARY ASPHALT CONCRETE WALK | 250 SF | $12.00 | $14.00 | $7.00 | $16.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $400 | $400 | $280 | $1,358 |
| 616E10000 WATER | 20 MGAL | $5.00 | $20.00 | $25.00 | $215 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $1.00 | $52,000 | $67,363 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 210 SY | $30.00 | $27.00 | $40.00 | $25.50 |
| 870E11100 NATURAL SOIL | 26 CY | $70.00 | $40.00 | $275 | $129 |
| 870E12000 6" DRAINAGE PIPE, PERFORATED | 227 FT | $12.00 | $15.00 | $20.00 | $12.80 |
| 870E12100 6" DRAINAGE PIPE, NON-PERFORATED | 20 FT | $12.00 | $15.00 | $20.00 | $38.67 |
| 870E14000 ON-SITE ASSISTANCE | 2 DAY | $800 | $250 | $2,500 | $1,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 272 CY | $35.00 | $40.00 | $40.00 | $23.07 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $25,000 | $20,000 | $20,000 | $9,480 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,160 FT | $5.00 | $6.00 | $6.00 | $35.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 19,065 LB | $1.00 | $1.50 | $1.50 | $1.77 |
| 511E40510 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 28 CY | $850 | $800 | $800 | $1,022 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 19 CY | $1,300 | $1,200 | $1,200 | $1,379 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 96 SY | $30.00 | $27.00 | $27.00 | $25.50 |
| 513E95000 STRUCTURAL STEEL, MISC.: JOINT ARMOR, GALVANIZED | 26 FT | $350 | $300 | $300 | $107 |
| 516E46900 BEARING DEVICE, MISC.: ANCHOR BOLTS, GALVANIZED | 24 EACH | $300 | $350 | $350 | $103 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 25 CY | $70.00 | $115 | $115 | $166 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 56 FT | $12.00 | $15.00 | $15.00 | $7.67 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 115 FT | $12.00 | $15.00 | $15.00 | $15.23 |
| 523E20000 DYNAMIC LOAD TESTING | 4 EACH | $3,500 | $3,000 | $3,000 | $4,188 |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 54 SY | $350 | $325 | $325 | $645 |
| 526E90010 TYPE A INSTALLATION | 24 FT | $250 | $200 | $200 | $605 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 218 CY | $100 | $90.00 | $90.00 | $141 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 188 SY | $10.00 | $16.00 | $16.00 | $12.50 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,000 | $6,500 | $127,850 | $143,029 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10121 STRUCTURAL STEEL MEMBERS, LEVEL 6, AS PER PLAN | 1 LS | $1,000,000 | $1.00M | 29% |
| 203E10000 EXCAVATION | 15,137 CY | $12.5 | $189k | 6% |
| 832E30000 EROSION CONTROL | 170,000 EACH | $1 | $170k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $155,000 | $155k | 5% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,380 FT | $110 | $152k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (486 CY | $290 | $141k | 4% |
| 870E10001 PREFABRICATED MODULAR RETAINING WALL, AS PER PLAN | 1,658 SF | $78 | $129k | 4% |
| 607E98000 FENCE, MISC.: WOOD BIKEWAY RAILING | 2,492 FT | $50 | $125k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $110,000 | $110k | 3% |
| 304E20000 AGGREGATE BASE | 1,821 CY | $60 | $109k | 3% |