CLI-IR 71-12.13/13.99
CLI County · est $8.8M
Bid dateThursday, May 12—
CLI County · est $8.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 190 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Eagle Bridge CO | R3Complete General Construction Company | R4Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 20,570 SY | $60.00 | $57.00 | $54.00 | $57.20 | 18% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,829 CY | $253 | $253 | $253 | $254 | 14% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3,061 CY | $162 | $162 | $162 | $162 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $490,000 | $200,000 |
| Item | Quantity | R1Shelly & Sands INC | R2Eagle Bridge CO | R3Complete General Construction Company | R4Sunesis Construction CO |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,000 | $2,500 | $16,000 | $2,387 |
| 202E23000 PAVEMENT REMOVED | 3,984 SY | $16.00 | $22.00 | $15.00 | $23.17 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 483 FT | $6.00 | $10.00 | $15.00 | $16.95 |
| 202E38000 GUARDRAIL REMOVED | 1,625 FT | $2.00 | $1.80 | $7.00 | $7.00 |
| 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $400,000 |
| $281,297 |
| 7% |
| 511E33313 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 567 CY | $800 | $900 | $1,000 | $1,176 | 7% |
| 511E33313 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 567 CY | $800 | $900 | $1,000 | $1,177 | 7% |
| 511E33313 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 359 CY | $1,200 | $1,100 | $1,200 | $1,441 | 6% |
| 511E33313 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 356 CY | $1,100 | $1,100 | $1,100 | $1,455 | 6% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $300,000 | $250,000 | $400,000 | $256,231 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $400,000 | $400,000 | $198,450 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 121,399 LB | $1.40 | $1.55 | $1.46 | $1.69 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 121,399 LB | $1.40 | $1.55 | $1.46 | $1.69 | 2% |
| 203E10000 EXCAVATION | 9,531 CY | $15.00 | $11.00 | $12.00 | $25.93 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 94,486 LB | $1.50 | $1.55 | $1.46 | $1.70 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 94,310 LB | $1.50 | $1.55 | $1.46 | $1.70 | 2% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 361 SY | $350 | $330 | $350 | $418 | 2% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 361 SY | $350 | $330 | $350 | $410 | 2% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 361 SY | $350 | $335 | $355 | $410 | 2% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 361 SY | $350 | $335 | $355 | $410 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 9,060 FT | $13.00 | $18.25 | $16.00 | $19.08 | 2% |
| 300 FT |
| $2.20 |
| $2.20 |
| $10.50 |
| $10.50 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 5 EACH | $140 | $135 | $275 | $354 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 8 EACH | $100 | $95.00 | $255 | $336 |
| 202E42210 ANCHOR ASSEMBLY REMOVED, BARRIER DESIGN | 3 EACH | $248 | $235 | $305 | $398 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 16 EACH | $48.00 | $45.00 | $255 | $255 |
| 202E58100 CATCH BASIN REMOVED | 18 EACH | $148 | $250 | $375 | $353 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (12"/15") | 221 FT | $27.00 | $16.00 | $23.00 | $18.44 |
| 202E75000 FENCE REMOVED | 706 FT | $2.00 | $2.00 | $10.00 | $10.00 |
| 203E20000 EMBANKMENT | 4,018 CY | $5.00 | $13.00 | $13.00 | $8.12 |
| 204E10000 SUBGRADE COMPACTION | 8,184 SY | $4.00 | $3.50 | $1.75 | $2.57 |
| 204E45000 PROOF ROLLING | 4 HOUR | $220 | $200 | $325 | $374 |
| 606E15050 GUARDRAIL, TYPE MGS | 1,100 FT | $23.00 | $21.80 | $29.50 | $29.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E MASH 2016 | 8 EACH | $3,000 | $2,835 | $2,825 | $2,825 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 8 EACH | $2,700 | $2,620 | $2,565 | $2,565 |
| 607E15000 FENCE, TYPE 47 | 433 FT | $21.00 | $21.00 | $35.00 | $35.00 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $6,160 | $15,000 | $500 | $27,260 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $14,000 | $50,000 | $20,000 | $11,050 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 122 SY | $60.00 | $55.00 | $90.00 | $133 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 4 CY | $190 | $125 | $190 | $99.28 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $75.00 | $75.00 | $75.00 |
| 659E00300 TOPSOIL | 2,781 CY | $12.00 | $5.00 | $15.00 | $11.31 |
| 659E10000 SEEDING AND MULCHING | 12,584 SY | $1.00 | $1.50 | $1.50 | $1.86 |
| 659E14000 REPAIR SEEDING AND MULCHING | 629 SY | $0.50 | $3.75 | $3.75 | $0.90 |
| 659E15000 INTER-SEEDING | 629 SY | $0.10 | $3.75 | $3.75 | $0.70 |
| 659E20000 COMMERCIAL FERTILIZER | 3.38 TON | $1,500 | $1,000 | $1,000 | $700 |
| 659E31000 LIME | 5.17 ACRE | $200 | $10.00 | $10.00 | $10.00 |
| 659E35000 WATER | 68 MGAL | $1.00 | $1.00 | $1.00 | $5.00 |
| 660E20000 SODDING REINFORCED | 85 SY | $26.00 | $34.00 | $34.00 | $35.00 |
| 670E00500 SLOPE EROSION PROTECTION | 12,456 SY | $2.50 | $2.25 | $2.25 | $1.68 |
| 670E00700 DITCH EROSION PROTECTION | 595 SY | $2.50 | $2.00 | $2.00 | $2.10 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $2,000 | $1,500 | $1,650 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $11,000 | $16,500 | $11,900 | $10,201 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,000 | $15,000 | $14,000 | $13,799 |
| 832E30000 EROSION CONTROL | 77,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 18 SY | $80.00 | $75.00 | $140 | $131 |
| 602E20000 CONCRETE MASONRY | 0.9 CY | $2,225 | $1,750 | $4,400 | $2,463 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 1,846 FT | $18.00 | $11.00 | $15.00 | $14.28 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 50 FT | $18.50 | $8.00 | $14.00 | $11.66 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,845 FT | $17.00 | $9.00 | $15.00 | $15.84 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 741 FT | $20.00 | $12.00 | $25.00 | $12.53 |
| 611E06100 15" CONDUIT, TYPE C | 376 FT | $75.00 | $53.00 | $115 | $71.11 |
| 611E07600 18" CONDUIT, TYPE C | 352 FT | $75.00 | $70.00 | $135 | $95.44 |
| 611E98230 CATCH BASIN, NO. 4 | 11 EACH | $6,800 | $4,500 | $4,400 | $6,279 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 10 EACH | $200 | $225 | $290 | $312 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (2") | 53,527 SY | $1.72 | $1.72 | $1.72 | $1.90 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2") | 8,200 SY | $5.00 | $5.00 | $5.00 | $5.55 |
| 254E01600 PATCHING PLANED SURFACE | 8,029 SY | $4.00 | $4.00 | $4.00 | $4.00 |
| 304E20000 AGGREGATE BASE | 1,364 CY | $70.00 | $72.00 | $67.00 | $75.50 |
| 407E10000 TACK COAT | 100 GAL | $3.00 | $3.00 | $3.00 | $3.00 |
| 407E20000 NON-TRACKING TACK COAT | 8,840 GAL | $5.00 | $5.00 | $5.00 | $5.00 |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 433 CY | $269 | $269 | $269 | $269 |
| 609E24510 CURB, TYPE 4-C | 72 FT | $160 | $50.00 | $60.00 | $30.00 |
| 617E10100 COMPACTED AGGREGATE | 350 CY | $70.00 | $85.00 | $155 | $102 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 5.4 MILE | $1,175 | $1,850 | $2,000 | $1,175 |
| 621E00100 RPM | 120 EACH | $66.00 | $66.25 | $66.25 | $66.25 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 120 EACH | $6.00 | $7.50 | $13.00 | $6.50 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 ONE-WAY | 12 EACH | $9.00 | $8.50 | $10.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 ONE-WAY | 24 EACH | $10.00 | $9.50 | $12.00 | $12.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $25.00 | $10.00 | $20.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $30.00 | $10.00 | $30.00 | $30.00 |
| 644E00104 EDGE LINE, 6" | 5.32 MILE | $4,070 | $4,070 | $4,070 | $4,070 |
| 644E00204 LANE LINE, 6" | 2.65 MILE | $2,250 | $2,230 | $2,230 | $2,230 |
| 645E00116 EDGE LINE, 6", TYPE A3 | 0.2 MILE | $50,100 | $50,105 | $50,105 | $50,105 |
| 645E00216 LANE LINE, 6", TYPE A3 | 0.11 MILE | $43,800 | $43,820 | $43,820 | $43,820 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $70.00 | $80.00 | $85.00 | $97.83 |
| 614E11630 INCREASED BARRIER DELINEATION | 800 FT | $0.50 | $1.75 | $3.00 | $3.00 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 808 FT | $24.00 | $24.00 | $79.25 | $105 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,200 | $2,200 | $2,200 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,250 | $2,250 | $2,250 | $2,250 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 8 EACH | $185 | $185 | $185 | $185 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 4,104 EACH | $14.00 | $25.00 | $14.00 | $16.38 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $400 | $275 | $280 | $356 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 ONE-WAY | 142 EACH | $7.00 | $7.00 | $15.00 | $15.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 ONE-WAY | 82 EACH | $7.00 | $7.00 | $15.00 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 224 EACH | $15.00 | $10.00 | $16.00 | $16.00 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6", AS PER PLAN | 0.67 MILE | $845 | $845 | $845 | $845 |
| 614E20366 WORK ZONE LANE LINE, CLASS I, 6", 648 | 6.11 MILE | $2,310 | $2,310 | $2,310 | $2,310 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 2.76 MILE | $2,065 | $2,065 | $2,065 | $2,065 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 9.76 MILE | $845 | $845 | $845 | $845 |
| 614E22336 WORK ZONE EDGE LINE, CLASS I, 6", 648 | 0.33 MILE | $3,010 | $3,010 | $3,010 | $3,010 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5.52 MILE | $2,255 | $2,255 | $2,255 | $2,255 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 27,040 FT | $0.60 | $0.60 | $0.60 | $0.60 |
| 616E10000 WATER | 102 MGAL | $50.00 | $11.00 | $60.00 | $13.36 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,240 FT | $25.00 | $24.00 | $24.50 | $25.21 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 72 SNMT | $550 | $700 | $750 | $797 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $100,000 | $77,500 | $150,000 | $61,180 |
| 202E22900 APPROACH SLAB REMOVED | 244 SY | $20.00 | $45.00 | $45.00 | $44.16 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50,000 | $70,000 | $40,000 | $109,687 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $35,000 | $40,000 | $40,000 | $58,352 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $40,000 | $25,000 | $30,131 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 405 FT | $34.00 | $55.00 | $50.00 | $50.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 360 FT | $18.00 | $5.00 | $10.00 | $22.05 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 660 FT | $43.00 | $60.00 | $60.00 | $62.79 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 600 FT | $23.00 | $6.00 | $10.00 | $21.17 |
| 507E71200 SPECIAL - PILE ENCASEMENT | 174 FT | $220 | $150 | $200 | $99.91 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 33 CY | $725 | $1,250 | $1,300 | $1,249 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 99 CY | $1,100 | $750 | $720 | $1,083 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 452 SY | $25.00 | $25.00 | $25.00 | $25.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 36 SY | $28.00 | $28.00 | $28.00 | $28.00 |
| 512E44400 TYPE B WATERPROOFING | 4 SY | $100 | $75.00 | $100 | $195 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 104 SF | $4.00 | $5.00 | $7.00 | $2.95 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 134 SF | $6.00 | $6.00 | $11.00 | $4.36 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 166 FT | $34.00 | $35.00 | $35.00 | $50.56 |
| 516E31010 2" DEEP JOINT SEALER | 124 FT | $20.00 | $17.00 | $20.00 | $20.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 98 CY | $100 | $100 | $78.00 | $115 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 166 FT | $4.00 | $10.00 | $9.00 | $3.56 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 93 FT | $8.00 | $12.00 | $19.00 | $14.83 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,000 | $4,000 | $6,000 | $4,861 |
| 526E90020 TYPE B INSTALLATION | 72 SY | $40.00 | $37.75 | $37.75 | $37.75 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 315 CY | $64.00 | $70.00 | $75.00 | $119 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $75,000 | $77,500 | $150,000 | $61,180 |
| 202E22900 APPROACH SLAB REMOVED | 244 SY | $20.00 | $45.00 | $45.00 | $44.16 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50,000 | $70,000 | $45,000 | $109,687 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $35,000 | $40,000 | $40,000 | $58,352 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $40,000 | $25,000 | $30,131 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 405 FT | $30.00 | $55.00 | $50.00 | $50.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 360 FT | $18.00 | $5.00 | $10.00 | $22.05 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 660 FT | $43.00 | $60.00 | $60.00 | $62.79 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 600 FT | $23.00 | $6.00 | $10.00 | $21.17 |
| 507E71200 SPECIAL - PILE ENCASEMENT | 174 FT | $220 | $150 | $200 | $99.91 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 33 CY | $725 | $1,250 | $1,300 | $1,249 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 99 CY | $1,000 | $750 | $720 | $1,083 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 451 SY | $25.00 | $25.00 | $25.00 | $25.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 36 SY | $28.00 | $28.00 | $28.00 | $28.00 |
| 512E44400 TYPE B WATERPROOFING | 4 SY | $100 | $75.00 | $100 | $195 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 104 SF | $5.00 | $5.00 | $7.00 | $2.95 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 134 SF | $6.00 | $6.00 | $11.00 | $4.36 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 166 FT | $34.00 | $35.00 | $35.00 | $50.56 |
| 516E31010 2" DEEP JOINT SEALER | 124 FT | $20.00 | $17.00 | $20.00 | $20.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 98 CY | $100 | $100 | $78.00 | $115 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 166 FT | $4.00 | $10.00 | $9.00 | $3.56 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 87 FT | $8.00 | $12.00 | $19.00 | $15.60 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,000 | $4,000 | $6,000 | $4,861 |
| 526E90020 TYPE B INSTALLATION | 72 SY | $40.00 | $37.75 | $37.75 | $37.75 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 315 CY | $65.00 | $70.00 | $75.00 | $119 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $75,000 | $67,500 | $140,000 | $52,825 |
| 202E22900 APPROACH SLAB REMOVED | 244 SY | $20.00 | $45.00 | $45.00 | $44.16 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $42,000 | $50,000 | $35,000 | $31,321 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $35,000 | $45,000 | $46,000 | $63,852 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $35,000 | $25,000 | $30,131 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 315 FT | $33.00 | $55.00 | $50.00 | $50.20 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 270 FT | $28.00 | $5.00 | $10.00 | $22.05 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 540 FT | $44.00 | $60.00 | $60.00 | $62.92 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 480 FT | $28.00 | $6.00 | $10.00 | $21.08 |
| 507E71200 SPECIAL - PILE ENCASEMENT | 174 FT | $220 | $160 | $220 | $88.27 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 23 CY | $863 | $1,350 | $1,600 | $1,287 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 102 CY | $1,000 | $750 | $725 | $928 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 399 SY | $25.00 | $25.00 | $25.00 | $25.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 29 SY | $30.00 | $28.00 | $28.00 | $28.00 |
| 512E44400 TYPE B WATERPROOFING | 4 SY | $100 | $75.00 | $100 | $235 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 111 SF | $5.00 | $5.00 | $7.00 | $2.83 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 143 SF | $6.00 | $6.00 | $11.00 | $4.23 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 176 FT | $35.00 | $35.00 | $35.00 | $50.34 |
| 516E31010 2" DEEP JOINT SEALER | 133 FT | $20.00 | $17.00 | $20.00 | $20.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 102 CY | $100 | $100 | $75.00 | $113 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 173 FT | $4.00 | $10.00 | $12.00 | $3.50 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 76 FT | $8.00 | $12.00 | $18.00 | $14.89 |
| 526E90020 TYPE B INSTALLATION | 77 SY | $40.00 | $37.75 | $37.75 | $37.75 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 286 CY | $65.00 | $70.00 | $75.00 | $120 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $75,000 | $67,500 | $150,000 | $51,716 |
| 202E22900 APPROACH SLAB REMOVED | 244 SY | $20.00 | $45.00 | $45.00 | $44.16 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $40,000 | $50,000 | $45,000 | $31,321 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $35,000 | $45,000 | $46,000 | $63,663 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $15,000 | $35,000 | $25,000 | $30,131 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 280 FT | $33.00 | $55.00 | $50.00 | $50.50 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 240 FT | $25.00 | $5.00 | $10.00 | $22.05 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 540 FT | $42.00 | $60.00 | $60.00 | $62.92 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 480 FT | $28.00 | $6.00 | $10.00 | $21.50 |
| 507E71200 SPECIAL - PILE ENCASEMENT | 174 FT | $220 | $160 | $220 | $88.27 |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 23 CY | $865 | $1,350 | $1,700 | $1,287 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 97 CY | $1,150 | $750 | $725 | $956 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 403 SY | $25.00 | $25.00 | $25.00 | $25.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 29 SY | $30.00 | $28.00 | $28.00 | $28.00 |
| 512E44400 TYPE B WATERPROOFING | 4 SY | $100 | $75.00 | $100 | $235 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 111 SF | $5.00 | $5.00 | $7.00 | $2.83 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 144 SF | $6.00 | $6.00 | $11.00 | $4.22 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 176 FT | $34.00 | $35.00 | $35.00 | $50.34 |
| 516E31010 2" DEEP JOINT SEALER | 133 FT | $20.00 | $17.00 | $20.00 | $20.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 99 CY | $100 | $100 | $75.00 | $115 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 168 FT | $4.00 | $10.00 | $12.00 | $3.54 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 85 FT | $10.00 | $12.00 | $18.00 | $15.88 |
| 526E90020 TYPE B INSTALLATION | 77 SY | $40.00 | $37.75 | $37.75 | $37.75 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 277 CY | $65.00 | $70.00 | $75.00 | $119 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $67,000 | $115,000 | $55,000 | $49,147 |
| 619E16020 FIELD OFFICE, TYPE C | 10 MNTH | $3,000 | $2,750 | $4,000 | $1,610 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $80,000 | $45,000 | $20,000 | $27,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 20,570 SY | $60 | $1.23M | 12% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,829 CY | $253 | $969k | 9% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3,061 CY | $161.75 | $495k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $490,000 | $490k | 5% |
| 511E33313 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 567 CY | $800 | $454k | 4% |
| 511E33313 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 567 CY | $800 | $454k | 4% |
| 511E33313 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 359 CY | $1,200 | $431k | 4% |
| 511E33313 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 356 CY | $1,100 | $392k | 4% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $300,000 | $300k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 2% |