COL-SR 45-03.36
COL County · est $0.8M
Bid dateThursday, May 12—
COL County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.
| Item | Quantity | R1Bog Construction INC | R2Eclipse CO LLC | R3Marucci & Gaffney Excavating CO | R4Ohio-west Virginia Excavating CO | R5Rudzik Excavating INC | R6Mike Pusateri Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 638E20426 SPECIAL - 16" WATER MAIN POLYVINYL CHLORIDE PIPE A | 245 FT | $300 | $265 | $373 | $370 | $435 | $265 | 15% |
| 611E27000 78" CONDUIT, TYPE A, 707.02 (ALUMINIZED), 707.04, | 134 FT | $450 | $420 | $550 | $1,150 | $1,390 | $1,503 | 12% |
| 503E31100 ROCK EXCAVATION | 1,770 CY | $20.00 | $39.00 |
| Item | Quantity | R1Bog Construction INC | R2Eclipse CO LLC | R3Marucci & Gaffney Excavating CO | R4Ohio-west Virginia Excavating CO | R5Rudzik Excavating INC | R6Mike Pusateri Excavating INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $4,000 | $24,000 | $30,000 | $51,138 | $16,900 |
| 202E23000 PAVEMENT REMOVED | 533 SY | $17.00 | $25.00 | $9.00 | $21.00 | $8.00 | $14.00 |
| 202E38000 GUARDRAIL REMOVED | 995 FT | $3.00 | $2.00 | $7.00 | $9.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $44.00 |
| $65.00 |
| $25.00 |
| $65.00 |
| 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 104 CY | $335 | $298 | $269 | $220 | $338 | $301 | 7% |
| 832E30000 EROSION CONTROL | 31,827 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 7% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT 6' x 4' B | 62 FT | $400 | $180 | $100 | $350 | $392 | $276 | 5% |
| 203E20000 EMBANKMENT | 2,222 CY | $11.00 | $8.00 | $20.00 | $16.00 | $22.00 | $24.00 | 5% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 900 FT | $25.00 | $24.00 | $26.50 | $30.00 | $25.00 | $25.31 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $31,509 | $20,000 | $20,000 | $24,905 | $16,400 | 4% |
| 602E20000 CONCRETE MASONRY | 24.7 CY | $800 | $1,200 | $1,050 | $1,050 | $1,320 | $1,750 | 4% |
| 203E10000 EXCAVATION | 2,647 CY | $7.00 | $8.00 | $20.00 | $13.00 | $24.00 | $18.00 | 4% |
| 659E00300 TOPSOIL | 501 CY | $35.00 | $71.00 | $20.00 | $35.00 | $26.00 | $25.00 | 4% |
| 304E20000 AGGREGATE BASE | 171 CY | $101 | $80.00 | $68.00 | $90.00 | $77.00 | $79.00 | 4% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 188 CY | $79.00 | $117 | $100 | $60.00 | $115 | $130 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $14,500 | $4,699 | $10,000 | $5,500 | $5,000 | $5,012 | 3% |
| 659E10000 SEEDING AND MULCHING | 4,519 SY | $3.00 | $1.60 | $1.00 | $1.40 | $2.00 | $2.07 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 4 EACH | $2,825 | $2,915 | $2,200 | $2,500 | $3,060 | $3,114 | 2% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (26 CY | $398 | $370 | $334 | $260 | $340 | $375 | 2% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 19 CY | $538 | $525 | $474 | $315 | $561 | $531 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10,500 | $7,000 | $13,500 | $8,700 | $10,088 | 2% |
| $2.00 |
| $2.50 |
| 202E98000 REMOVAL MISC.: PILING REMOVED | 1 LS | $2,000 | $15,000 | $500 | $2,500 | $1,000 | $3,000 |
| 204E10000 SUBGRADE COMPACTION | 583 SY | $3.00 | $1.00 | $5.00 | $5.50 | $2.00 | $3.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $26.00 | $5.00 | $125 | $150 | $300 |
| 659E14000 REPAIR SEEDING AND MULCHING | 226 SY | $1.00 | $2.00 | $0.27 | $1.40 | $0.50 | $0.70 |
| 659E20000 COMMERCIAL FERTILIZER | 0.63 TON | $1,000 | $315 | $0.27 | $1,500 | $700 | $784 |
| 659E31000 LIME | 0.93 ACRE | $100 | $26.00 | $40.00 | $100 | $25.00 | $200 |
| 659E35000 WATER | 25 MGAL | $1.00 | $0.11 | $0.10 | $1.00 | $0.10 | $5.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $3,360 | $1,500 | $2,300 | $1,550 | $4,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,800 | $3,780 | $2,800 | $12,000 | $3,058 | $5,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,000 | $7,701 | $7,600 | $10,000 | $8,085 | $8,000 |
| 605E31100 AGGREGATE DRAINS | 112 FT | $20.00 | $15.00 | $15.00 | $25.00 | $25.50 | $12.00 |
| 611E04200 12" CONDUIT, TYPE A, 707.02 (ALUMINIZED), 707.04, | 95 FT | $45.00 | $80.00 | $80.00 | $27.00 | $99.00 | $30.00 |
| 407E10000 TACK COAT | 59 GAL | $5.00 | $3.00 | $2.50 | $10.00 | $4.00 | $2.80 |
| 408E10001 PRIME COAT, AS PER PLAN | 138 GAL | $11.00 | $10.00 | $9.00 | $10.00 | $15.00 | $10.00 |
| 638E20466 SPECIAL - 24" STEEL PIPE ENCASEMENT, OPEN CUT (BUC | 30 FT | $200 | $199 | $250 | $210 | $325 | $124 |
| 621E00100 RPM | 3 EACH | $1,100 | $1,136 | $925 | $1,000 | $1,020 | $947 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $100 | $18.00 | $5.00 | $45.00 | $50.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 18 EACH | $10.00 | $11.00 | $11.00 | $12.00 | $9.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.22 MILE | $25,000 | $27,678 | $15,929 | $45,000 | $17,525 | $17,840 |
| 646E10200 CENTER LINE | 0.03 MILE | $100,000 | $62,379 | $35,900 | $45,000 | $39,500 | $40,208 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $100 | $413 | $90.00 | $350 | $250 | $450 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.03 MILE | $1,000 | $59,089 | $24,450 | $30,000 | $27,000 | $27,834 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.22 MILE | $1,000 | $8,821 | $3,650 | $4,000 | $4,050 | $4,088 |
| 616E10000 WATER | 15 MGAL | $1.00 | $50.00 | $0.10 | $12.00 | $1.00 | $50.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $9,000 | $18,500 | $24,500 | $4,105 | $6,750 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $250 | $683 | $900 | $1,250 | $1,400 | $2,600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $6,000 | $9,000 | $12,000 | $6,000 | $9,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 638E20426 SPECIAL - 16" WATER MAIN POLYVINYL CHLORIDE PIPE A | 245 FT | $300 | $74k | 13% |
| 611E27000 78" CONDUIT, TYPE A, 707.02 (ALUMINIZED), 707.04, | 134 FT | $450 | $60k | 11% |
| 503E31100 ROCK EXCAVATION | 1,770 CY | $20 | $35k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 104 CY | $335 | $35k | 6% |
| 832E30000 EROSION CONTROL | 31,827 EACH | $1 | $32k | 6% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT 6' x 4' B | 62 FT | $400 | $25k | 4% |
| 203E20000 EMBANKMENT | 2,222 CY | $11 | $24k | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 900 FT | $25 | $23k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 602E20000 CONCRETE MASONRY | 24.7 CY | $800 | $20k | 4% |