251E01001PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN,
17,242 SY
$27.00
$32.00
56%
251E01001PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN,
3,758 SY
$60.50
$62.60
27%
614E11000MAINTAINING TRAFFIC
1 LS
$70,222
$55,405
8%
624E10000MOBILIZATION
1 LS
$20,000
$95,338
2%
621E00100RPM
390 EACH
$40.00
$40.00
2%
642E00104EDGE LINE, 6", TYPE 1
15.46 MILE
$815
$874
2%
642E00300CENTER LINE, TYPE 1
7.73 MILE
$853
$1,501
1%
614E21100WORK ZONE CENTER LINE, CLASS I, 642 PAINT
4.76 MILE
$1,125
$1,441
1%
614E12461WORK ZONE MARKING SIGN, AS PER PLAN
35 EACH
$120
$110
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$3,300
$3,800
0%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$3,000
$2,920
0%
621E54000RAISED PAVEMENT MARKER REMOVED
390 EACH
$4.00
$6.93
0%
832E30000EROSION CONTROL
1,000 EACH
$1.00
$1.00
0%
Project details
Description
FAY-/MAD-SP FY22 Gen
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
17,242 SY
$27
$466k
56%
251E01001PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN,
3,758 SY
$60.5
$227k
27%
614E11000MAINTAINING TRAFFIC
1 LS
$70,222
$70k
8%
624E10000MOBILIZATION
1 LS
$20,000
$20k
2%
621E00100RPM
390 EACH
$40
$16k
2%
642E00104EDGE LINE, 6", TYPE 1
15.46 MILE
$815
$13k
2%
642E00300CENTER LINE, TYPE 1
7.73 MILE
$853
$7k
1%
614E21100WORK ZONE CENTER LINE, CLASS I, 642 PAINT
4.76 MILE
$1,125
$5k
1%
614E12461WORK ZONE MARKING SIGN, AS PER PLAN
35 EACH
$120
$4k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM