OTT-SR 53-11.79
OTT County · est $2.6M
Bid dateThursday, June 30—
OTT County · est $2.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1Erie Blacktop INC | R2Gerken Paving INC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 4,830 CY | $193 | $195 | $245 | 49% |
| 253E02000 PAVEMENT REPAIR | 2,368 CY | $162 | $180 | $200 | 20% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" | 98,338 SY | $1.13 | $2.10 | $1.53 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $78,500 | $84,000 | $148,827 | 4% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 2,162.5 FT | $35.25 | $33.60 | $33.76 | 4% |
| 601E34301 ROCK CHANNEL PROTECTION, TYPE D WITHOUT FILTER, AS | 275 CY | $170 | $178 | $178 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 |
| Item | Quantity | R1Erie Blacktop INC | R2Gerken Paving INC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 312.5 FT | $2.55 | $2.40 | $2.41 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 1,975 FT | $2.30 | $2.20 | $2.21 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $152 | $145 | $146 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 4 EACH | $99.75 | $95.00 | $95.45 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 22 STA | $47.25 | $45.00 | $45.21 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $100,000 |
| $100,000 |
| 2% |
| 617E10100 COMPACTED AGGREGATE | 546 CY | $55.00 | $55.00 | $40.00 | 2% |
| 601E34101 ROCK CHANNEL PROTECTION, TYPE B WITHOUT FILTER, AS | 125 CY | $210 | $215 | $215 | 1% |
| 203E20000 EMBANKMENT | 300 CY | $86.70 | $82.50 | $82.89 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 8,359 GAL | $2.65 | $2.00 | $2.15 | 1% |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $685 | $1,000 | $245 | 1% |
| 621E00100 RPM | 317 EACH | $47.25 | $41.50 | $41.50 | 1% |
| 209E60500 LINEAR GRADING | 8 MILE | $1,850 | $2,000 | $4,000 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 10 EACH | $1,450 | $2,400 | $550 | 1% |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 7.36 MILE | $1,850 | $460 | $275 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 8,415 LB | $1.35 | $1.60 | $0.60 | 1% |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 100 CY | $104 | $98.50 | $98.50 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $10,000 | $10,000 | 0% |
| 37.5 FT |
| $37.00 |
| $35.20 |
| $35.37 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH2016 | 2 EACH | $3,385 | $3,220 | $3,235 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,640 | $1,560 | $1,567 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 1 EACH | $500 | $800 | $795 |
| 659E10000 SEEDING AND MULCHING | 1,306 SY | $3.70 | $3.40 | $3.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $1,200 | $1,120 | $700 |
| 659E35000 WATER | 8 MGAL | $1.05 | $1.00 | $1.00 |
| 611E99150 INLET ADJUSTED TO GRADE | 1 EACH | $685 | $2,500 | $1,545 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $475 | $700 | $445 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 300 EACH | $7.00 | $6.00 | $3.00 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, BIDIRECTIONAL | 26 EACH | $10.50 | $10.00 | $10.05 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 16 EACH | $116 | $245 | $110 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 9.42 MILE | $840 | $725 | $800 |
| 642E00300 CENTER LINE, TYPE 1 | 4.71 MILE | $1,260 | $900 | $1,200 |
| 644E00500 STOP LINE | 47 FT | $10.50 | $10.00 | $10.00 |
| 644E00620 CROSSWALK LINE, 12" | 192 FT | $6.30 | $4.00 | $6.00 |
| 644E00621 CROSSWALK LINE, 12", AS PER PLAN | 84 FT | $6.30 | $8.00 | $6.00 |
| 644E01500 DOTTED LINE, 4" | 761 FT | $3.15 | $2.00 | $3.00 |
| 644E01630 BIKE LANE SYMBOL MARKING | 18 EACH | $370 | $300 | $350 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 30 HOUR | $68.25 | $80.00 | $67.50 |
| 614E12460 WORK ZONE MARKING SIGN | 36 EACH | $105 | $100 | $100 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $145 | $100 | $135 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $60.00 | $55.00 | $54.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 4.71 MILE | $1,890 | $850 | $1,500 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 4.71 MILE | $630 | $450 | $400 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.71 MILE | $1,470 | $775 | $1,100 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 9.42 MILE | $895 | $700 | $950 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 9.42 MILE | $790 | $600 | $750 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 77 FT | $3.15 | $3.00 | $3.00 |
| 614E27010 WORK ZONE CROSSWALK LINE, CLASS I, 12" | 192 FT | $2.10 | $1.00 | $2.00 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 192 FT | $1.05 | $2.00 | $1.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $6,000 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 4,830 CY | $193 | $932k | 47% |
| 253E02000 PAVEMENT REPAIR | 2,368 CY | $162 | $384k | 19% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" | 98,338 SY | $1.13 | $111k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $78,500 | $79k | 4% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 2,162.5 FT | $35.25 | $76k | 4% |
| 601E34301 ROCK CHANNEL PROTECTION, TYPE D WITHOUT FILTER, AS | 275 CY | $170 | $47k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 617E10100 COMPACTED AGGREGATE | 546 CY | $55 | $30k | 2% |
| 601E34101 ROCK CHANNEL PROTECTION, TYPE B WITHOUT FILTER, AS | 125 CY | $210 | $26k | 1% |
| 203E20000 EMBANKMENT | 300 CY | $86.7 | $26k | 1% |