Published by ODOT on this contract’s Proposal PDF · EDGE Goal: 5.0%
5.0%EDGE / SBE GoalEDGE = Encouraging Diversity, Growth & Equity — Ohio state-level program for certified businesses owned by economically disadvantaged individuals. Renamed Small Business Enterprise (SBE) in 2025+. Stacks alongside the federal DBE goal.
Project scope
Bid tab · ODOT
Asphalt Paving22%
Mobilization & General22%
Maintaining Traffic22%
Earthwork11%
Structures / Bridge11%
Pavement Marking11%
Top items by low bid
Item
Qty
Unit price
Per-bidder unit pricing
ODOT bid tab line items with each bidder’s unit price. Top 9 items by low bid’s extended amount.
442E20050ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B (
565 CY
$300
$290
45%
442E20200ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE
753 CY
$225
$285
45%
614E11000MAINTAINING TRAFFIC
1 LS
$12,500
$20,000
3%
624E10000MOBILIZATION
1 LS
$10,000
$10,000
3%
209E72051PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA
2.1 MILE
$4,000
$20,000
2%
407E10000TACK COAT
1,762 GAL
$2.50
$3.00
1%
642E00300CENTER LINE, TYPE 1
1.05 MILE
$2,250
$3,000
1%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$1,977
Project details
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$4,500
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM