SEN-SR 231-00.00 Resurfacing
SEN County · est $3.2M
Bid dateThursday, July 28—
SEN County · est $3.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2M & B Asphalt CO INC | R3Gerken Paving INC | % of bid |
|---|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (5809 CY | $168 | $164 | $160 | 33% |
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (2915 CY | $270 | $239 | $230 | 27% |
| 253E02000 PAVEMENT REPAIR | 2,559 CY | $170 | $193 | $205 | 15% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 103,210 SY | $1.50 | $2.85 | $3.30 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $147,350 | $20,000 | $85,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $90,000 | $100,000 | 3% |
| 617E10100 COMPACTED AGGREGATE | 1,389 CY | $36.00 |
| Item | Quantity | R1Kokosing Construction Company INC | R2M & B Asphalt CO INC | R3Gerken Paving INC |
|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 1,575 FT | $2.00 | $1.80 | $1.80 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 475 FT | $2.00 | $2.24 | $2.24 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 9 EACH | $250 | $320 | $320 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $250 | $95.00 | $95.00 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 7 EACH | $250 | $145 | $145 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $64.00 |
| $61.00 |
| 2% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $8,700 | $8,700 | $8,700 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH2016 | 15 EACH | $2,225 | $2,830 | $2,830 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 14,484 GAL | $2.30 | $2.30 | $2.25 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,275 FT | $26.00 | $21.00 | $21.00 | 1% |
| 209E60500 LINEAR GRADING | 13 MILE | $1,900 | $600 | $1,500 | 1% |
| 621E00100 RPM | 498 EACH | $40.00 | $33.50 | $32.50 | 1% |
| 809E69100 STOP LINE RADAR DETECTION | 2 EACH | $8,400 | $8,400 | $8,400 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $300 | $425 | $510 | 1% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 400 FT | $31.00 | $28.20 | $28.20 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $15,000 | $14,200 | 0% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 14.18 MILE | $775 | $775 | $775 | 0% |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 21.27 MILE | $500 | $600 | $500 | 0% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | 0% |
| 203E20000 EMBANKMENT |
| 300 CY |
| $24.00 |
| $59.50 |
| $59.50 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 25 STA | $75.00 | $35.00 | $35.00 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 12.48 MILE | $200 | $1,400 | $440 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 312.5 FT | $28.00 | $22.40 | $22.40 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $1,100 | $1,420 | $1,420 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 1 EACH | $1,300 | $965 | $965 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 3 EACH | $1,300 | $1,035 | $1,035 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 1 EACH | $1,000 | $1,600 | $750 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 100 CY | $75.00 | $75.00 | $75.00 |
| 659E10000 SEEDING AND MULCHING | 1,597.5 SY | $2.50 | $3.00 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $700 | $675 | $675 |
| 659E35000 WATER | 9 MGAL | $10.00 | $1.00 | $1.00 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 616 SY | $1.50 | $2.85 | $3.30 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 9,334 LB | $0.65 | $1.00 | $1.90 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 382 EACH | $2.00 | $7.00 | $7.00 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, BIDIRECTIONAL | 67 EACH | $11.00 | $13.00 | $13.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $20.00 | $100 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $100 | $200 | $65.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 9 EACH | $100 | $300 | $130 |
| 642E00300 CENTER LINE, TYPE 1 | 7.09 MILE | $850 | $850 | $850 |
| 644E00500 STOP LINE | 127 FT | $20.00 | $20.00 | $20.00 |
| 625E31510 PULL BOX REMOVED | 7 EACH | $225 | $225 | $225 |
| 632E90400 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 1 EACH | $725 | $725 | $725 |
| 614E12460 WORK ZONE MARKING SIGN | 57 EACH | $90.00 | $95.00 | $115 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $144 | $100 | $120 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $64.00 | $100 | $55.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 381 FT | $2.50 | $5.00 | $5.00 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 140 FT | $22.16 | $30.00 | $22.16 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,150 | $8,000 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (5809 CY | $167.5 | $973k | 32% |
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (2915 CY | $270 | $787k | 26% |
| 253E02000 PAVEMENT REPAIR | 2,559 CY | $170 | $435k | 15% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 103,210 SY | $1.5 | $155k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $147,350 | $147k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 617E10100 COMPACTED AGGREGATE | 1,389 CY | $36 | $50k | 2% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $8,700 | $35k | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH2016 | 15 EACH | $2,225 | $33k | 1% |
| 407E20000 NON-TRACKING TACK COAT | 14,484 GAL | $2.3 | $33k | 1% |