POR-SR 43-18.65
POR County · est $5.5M
Bid dateThursday, October 13—
POR County · est $5.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 207 more items below.
| Item | Quantity | R1Fechko Excavating LLC | R2Eclipse CO LLC | R3Digioia-suburban Excavating LLC | R4Karvo Companies INC | R5Catts Construction INC | R6Shelly & Sands INC | R7Tri-mor CORP | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 1,398 CY | $235 | $210 | $265 | $235 | $252 | $252 | $508 | 9% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,198 CY | $265 | $235 | $300 | $248 | $285 | $284 | $388 | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) |
| Item | Quantity | R1Fechko Excavating LLC | R2Eclipse CO LLC | R3Digioia-suburban Excavating LLC | R4Karvo Companies INC | R5Catts Construction INC | R6Shelly & Sands INC | R7Tri-mor CORP |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $37,850 | $55,000 | $65,000 | $50,000 | $46,150 | $52,000 | $115,000 |
| 202E20010 HEADWALL REMOVED | 5 EACH | $750 | $380 | $1,885 | $1,200 | $106 | $850 | $400 |
| 202E23000 PAVEMENT REMOVED | 2,319 SY | $11.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,836 CY |
| $170 |
| $185 |
| $205 |
| $166 |
| $255 |
| $186 |
| $210 |
| 9% |
| 638E98600 WATER WORK, MISC.: 10" WATER MAIN POLYVINYL CHLORI | 1,605 FT | $185 | $127 | $105 | $144 | $193 | $146 | $165 | 8% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 4,311 SY | $55.00 | $49.00 | $40.00 | $51.00 | $49.60 | $50.00 | $80.00 | 7% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 2,012 FT | $112 | $121 | $145 | $120 | $166 | $164 | $165 | 6% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 9,170 FT | $24.00 | $19.50 | $30.00 | $23.00 | $23.00 | $27.00 | $32.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $220,000 | $335,000 | $160,000 | $385,000 | $256,300 | $280,000 | $205,000 | 6% |
| 611E10400 24" CONDUIT, TYPE B, 748.02 | 669 FT | $290 | $291 | $320 | $304 | $363 | $335 | $410 | 5% |
| 304E20000 AGGREGATE BASE | 2,861 CY | $64.00 | $74.00 | $78.00 | $86.00 | $65.00 | $105 | $85.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $178,000 | $166,894 | $155,000 | $360,000 | $108,000 | $200,000 | $212,800 | 5% |
| 608E10000 4" CONCRETE WALK | 19,201 SF | $7.40 | $4.55 | $7.00 | $7.05 | $6.00 | $8.00 | $8.00 | 4% |
| 832E30000 EROSION CONTROL | 130,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 602E20000 CONCRETE MASONRY | 46.3 CY | $2,450 | $574 | $1,800 | $1,800 | $1,684 | $1,805 | $1,500 | 3% |
| 611E04601 12" CONDUIT, TYPE C, AS PER PLAN | 1,097 FT | $100 | $115 | $110 | $109 | $145 | $142 | $125 | 3% |
| 611E11900 27" CONDUIT, TYPE B, 748.02 | 215 FT | $450 | $420 | $495 | $435 | $534 | $435 | $510 | 3% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 9,861 SY | $9.00 | $15.00 | $12.00 | $12.00 | $12.50 | $14.00 | $20.00 | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 3,832 FT | $21.50 | $21.00 | $30.00 | $23.00 | $4.00 | $31.00 | $20.00 | 2% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 8,536 FT | $9.00 | $12.00 | $10.00 | $12.85 | $12.00 | $19.00 | $15.00 | 2% |
| 611E07400 18" CONDUIT, TYPE B, 748.02 | 330 FT | $230 | $198 | $220 | $212 | $332 | $272 | $250 | 2% |
| $8.00 |
| $11.00 |
| $9.00 |
| $9.00 |
| $12.00 |
| $25.00 |
| 202E23500 WEARING COURSE REMOVED | 518 SY | $10.00 | $17.00 | $9.00 | $10.00 | $19.00 | $11.00 | $20.00 |
| 202E30000 WALK REMOVED | 684 SF | $1.85 | $4.00 | $2.60 | $2.55 | $2.00 | $1.00 | $4.00 |
| 202E32000 CURB REMOVED | 65 FT | $3.30 | $11.00 | $13.50 | $16.00 | $10.00 | $8.00 | $20.00 |
| 202E32500 CURB AND GUTTER REMOVED | 176 FT | $6.50 | $9.00 | $9.25 | $18.00 | $10.00 | $9.00 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 299 FT | $35.00 | $25.00 | $53.00 | $18.00 | $8.00 | $35.00 | $30.00 |
| 202E38000 GUARDRAIL REMOVED | 840 FT | $5.00 | $2.00 | $5.50 | $5.00 | $2.00 | $2.00 | $5.00 |
| 202E53100 MAILBOX REMOVED | 46 EACH | $130 | $58.00 | $110 | $290 | $17.00 | $44.00 | $100 |
| 202E58100 CATCH BASIN REMOVED | 27 EACH | $400 | $466 | $850 | $340 | $175 | $680 | $500 |
| 202E58500 CATCH BASIN ABANDONED | 1 EACH | $300 | $744 | $305 | $500 | $232 | $1,200 | $500 |
| 202E75201 FENCE REMOVED FOR REUSE, AS PER PLAN | 86 FT | $85.00 | $34.00 | $90.00 | $5.10 | $36.00 | $32.00 | $95.00 |
| 202E75610 VALVE BOX REMOVED | 17 EACH | $90.00 | $177 | $140 | $195 | $20.00 | $139 | $200 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $500 | $247 | $300 | $235 | $198 | $368 | $400 |
| 202E98100 REMOVAL MISC.: POST REMOVED | 4 EACH | $100 | $98.00 | $120 | $25.00 | $38.00 | $184 | $250 |
| 202E98200 REMOVAL MISC.: CONDUIT | 20 FT | $25.00 | $19.00 | $26.00 | $9.00 | $7.75 | $18.00 | $10.00 |
| 203E10000 EXCAVATION | 3,130 CY | $14.00 | $38.00 | $16.50 | $54.00 | $65.00 | $28.00 | $30.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 150 CY | $25.00 | $62.00 | $28.00 | $26.50 | $10.00 | $63.00 | $30.00 |
| 203E20000 EMBANKMENT | 4,153 CY | $8.00 | $28.00 | $25.00 | $22.00 | $12.00 | $28.00 | $15.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $25.00 | $38.00 | $45.00 | $11.75 | $32.00 | $31.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 15,090 SY | $1.70 | $1.00 | $2.00 | $3.00 | $1.00 | $4.00 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 921 CY | $28.00 | $38.00 | $28.00 | $22.75 | $29.00 | $22.00 | $30.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 921 CY | $74.00 | $68.00 | $62.00 | $45.00 | $50.00 | $116 | $75.00 |
| 204E45000 PROOF ROLLING | 6 HOUR | $325 | $278 | $250 | $200 | $252 | $236 | $150 |
| 204E51000 GEOGRID | 2,851 SY | $1.70 | $1.00 | $2.50 | $4.40 | $2.50 | $2.00 | $5.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 350 FT | $26.50 | $23.90 | $28.00 | $26.50 | $26.00 | $23.00 | $30.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 50 FT | $31.00 | $25.40 | $33.00 | $31.00 | $29.00 | $26.00 | $35.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,300 | $3,300 | $2,485 | $2,300 | $3,605 | $3,190 | $2,600 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,300 | $1,500 | $1,500 | $1,300 | $1,690 | $1,496 | $1,500 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,150 | $3,040 | $2,400 | $2,150 | $3,562 | $3,150 | $2,400 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $1,200 | $655 | $1,300 | $1,200 | $751 | $665 | $1,400 |
| 608E13000 6" CONCRETE WALK | 4,939 SF | $9.20 | $7.00 | $8.00 | $7.15 | $7.40 | $9.00 | $10.00 |
| 608E15000 8" CONCRETE WALK | 1,101 SF | $11.20 | $9.70 | $9.30 | $7.95 | $9.50 | $14.00 | $10.00 |
| 608E52000 CURB RAMP | 931 SF | $13.25 | $14.50 | $11.50 | $13.50 | $20.00 | $24.00 | $18.00 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 163 FT | $185 | $237 | $105 | $215 | $95.00 | $252 | $175 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 2 EACH | $5,000 | $4,473 | $5,500 | $6,200 | $3,350 | $6,676 | $5,000 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 3 EACH | $1,950 | $2,339 | $990 | $1,724 | $1,330 | $1,893 | $1,000 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $1,475 | $1,994 | $630 | $1,000 | $584 | $2,400 | $900 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 32 EACH | $250 | $222 | $200 | $175 | $168 | $409 | $250 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 4 EACH | $280 | $222 | $315 | $320 | $403 | $463 | $400 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 2 EACH | $350 | $249 | $450 | $485 | $532 | $529 | $600 |
| 690E98000 SPECIAL - PAPER BOX REMOVED AND RESET | 2 EACH | $115 | $222 | $820 | $75.00 | $168 | $396 | $150 |
| 690E98400 SPECIAL - MISC.: PRECONSTRUCTION VIDEO TAPING | 1 LS | $850 | $696 | $1,650 | $2,250 | $1,010 | $700 | $2,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $7,000 | $2,581 | $3,100 | $2,850 | $3,387 | $3,225 | $3,150 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 36 CY | $125 | $122 | $130 | $145 | $367 | $123 | $140 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 32 CY | $145 | $142 | $185 | $140 | $392 | $159 | $140 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $105 | $220 | $400 | $89.00 | $105 | $370 |
| 659E00300 TOPSOIL | 1,451 CY | $45.00 | $75.00 | $50.00 | $25.00 | $54.00 | $49.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 13,075 SY | $1.60 | $1.00 | $2.00 | $0.83 | $1.00 | $1.00 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 654 SY | $1.60 | $1.00 | $1.20 | $1.00 | $1.00 | $1.00 | $2.00 |
| 659E15000 INTER-SEEDING | 654 SY | $1.50 | $1.00 | $0.55 | $0.05 | $1.00 | $1.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 2.94 TON | $1,850 | $969 | $500 | $1,200 | $655 | $966 | $2,200 |
| 659E31000 LIME | 2.7 ACRE | $400 | $165 | $250 | $1.00 | $655 | $165 | $500 |
| 659E35000 WATER | 106 MGAL | $8.00 | $1.00 | $10.00 | $10.00 | $10.00 | $1.00 | $225 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,800 | $1,579 | $3,500 | $1,500 | $1,753 | $1,582 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $17,000 | $16,102 | $25,500 | $18,000 | $13,479 | $16,400 | $18,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $16,500 | $20,517 | $18,500 | $1,500 | $16,248 | $17,425 | $18,000 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $12.50 | $13.00 | $15.00 | $16.00 | $15.00 | $20.00 | $15.00 |
| 605E31100 AGGREGATE DRAINS | 26 FT | $12.00 | $22.00 | $30.00 | $35.00 | $55.00 | $32.00 | $20.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 640 FT | $16.00 | $23.00 | $25.00 | $17.25 | $22.00 | $27.00 | $20.00 |
| 611E04400 12" CONDUIT, TYPE B, 748.02 | 295 FT | $106 | $119 | $145 | $133 | $193 | $179 | $155 |
| 611E04600 12" CONDUIT, TYPE C, 706.02 | 12 FT | $85.00 | $178 | $220 | $350 | $374 | $443 | $85.00 |
| 611E05901 15" CONDUIT, TYPE B, AS PER PLAN | 379 FT | $160 | $168 | $215 | $187 | $235 | $225 | $210 |
| 611E06101 15" CONDUIT, TYPE C, AS PER PLAN | 5 FT | $188 | $483 | $350 | $190 | $631 | $755 | $550 |
| 611E07600 18" CONDUIT, TYPE C, 748.02 | 254 FT | $200 | $192 | $200 | $182 | $284 | $224 | $235 |
| 611E07601 18" CONDUIT, TYPE C, AS PER PLAN | 72 FT | $200 | $197 | $200 | $206 | $256 | $228 | $215 |
| 611E10601 24" CONDUIT, TYPE C, AS PER PLAN | 45 FT | $310 | $353 | $320 | $390 | $432 | $314 | $410 |
| 611E19200 42" CONDUIT, TYPE A, 706.02, 707.04, OR 707.42 | 158 FT | $340 | $200 | $440 | $1,100 | $490 | $428 | $500 |
| 611E19400 42" CONDUIT, TYPE B, 748.02 | 39 FT | $610 | $712 | $780 | $1,565 | $785 | $1,265 | $800 |
| 611E19601 42" CONDUIT, TYPE C, AS PER PLAN | 23 FT | $610 | $963 | $200 | $1,200 | $710 | $1,160 | $1,150 |
| 611E97400 CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE CONT | 20 FT | $67.00 | $63.00 | $35.00 | $37.00 | $35.00 | $51.00 | $500 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 20 FT | $64.00 | $56.00 | $25.00 | $35.00 | $35.00 | $33.00 | $400 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 20 FT | $50.00 | $46.00 | $25.00 | $24.00 | $35.00 | $33.00 | $100 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 20 FT | $50.00 | $47.00 | $25.00 | $24.00 | $35.00 | $33.00 | $100 |
| 611E98150 CATCH BASIN, NO. 3 | 12 EACH | $3,900 | $5,126 | $4,800 | $4,000 | $6,258 | $5,165 | $6,000 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 2 EACH | $4,500 | $5,136 | $4,800 | $6,500 | $10,330 | $7,300 | $7,500 |
| 611E98180 CATCH BASIN, NO. 3A | 26 EACH | $2,600 | $4,091 | $3,650 | $2,700 | $3,210 | $4,030 | $3,600 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 4 EACH | $3,000 | $4,093 | $3,650 | $3,600 | $4,616 | $5,745 | $4,800 |
| 611E98370 CATCH BASIN, NO. 6 | 3 EACH | $2,600 | $4,233 | $3,500 | $2,750 | $4,493 | $4,964 | $3,800 |
| 611E98470 CATCH BASIN, NO. 2-2B | 25 EACH | $1,600 | $3,532 | $2,200 | $1,700 | $1,800 | $3,038 | $2,400 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 5 EACH | $400 | $652 | $500 | $480 | $895 | $1,012 | $800 |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $4,800 | $6,807 | $5,000 | $6,500 | $7,498 | $5,700 | $5,500 |
| 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR | 1 EACH | $19,000 | $17,941 | $24,500 | $14,000 | $25,166 | $15,700 | $25,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $1,500 | $903 | $500 | $945 | $819 | $1,640 | $2,000 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $2,200 | $1,496 | $1,650 | $1,550 | $1,151 | $6,900 | $2,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $260 | $446 | $350 | $385 | $244 | $180 | $500 |
| 611E99720 INSPECTION WELL | 2 EACH | $625 | $933 | $275 | $600 | $1,761 | $964 | $1,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 5,000 LB | $3.00 | $5.00 | $1.80 | $3.25 | $2.00 | $2.00 | $3.00 |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $43,000 | $44,384 | $44,900 | $40,000 | $81,250 | $51,500 | $55,000 |
| 611E97400 CONDUIT, MISC.: 60" X 78" CONDUIT, TYPE A, 706.04 | 9 FT | $2,500 | $3,508 | $3,300 | $4,400 | $2,940 | $2,900 | $4,000 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 700 SY | $60.00 | $63.00 | $16.00 | $62.00 | $60.00 | $64.00 | $75.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,243 FT | $3.00 | $2.00 | $3.00 | $1.20 | $4.00 | $2.00 | $3.00 |
| 253E01000 PAVEMENT REPAIR | 250 SY | $185 | $125 | $225 | $205 | $125 | $200 | $150 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T= VARIES FRO | 18,237 SY | $3.85 | $3.60 | $4.50 | $4.55 | $4.50 | $4.25 | $7.00 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 150 CY | $84.00 | $74.00 | $70.00 | $45.00 | $62.00 | $54.00 | $100 |
| 407E20000 NON-TRACKING TACK COAT | 3,197 GAL | $2.50 | $5.10 | $3.00 | $4.00 | $5.00 | $3.00 | $10.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 34 CY | $500 | $416 | $585 | $525 | $495 | $536 | $1,000 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4 CY | $1,200 | $551 | $1,400 | $380 | $654 | $1,285 | $1,000 |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 915 SY | $67.00 | $64.00 | $90.00 | $87.00 | $60.00 | $77.00 | $90.00 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 567 SY | $84.00 | $85.00 | $115 | $100 | $76.00 | $86.00 | $105 |
| 609E20000 CURB, TYPE 3-A | 98 FT | $9.00 | $37.25 | $75.00 | $17.00 | $10.00 | $11.00 | $25.00 |
| 609E26000 CURB, TYPE 6 | 172 FT | $45.00 | $38.50 | $32.00 | $44.00 | $69.00 | $38.00 | $25.00 |
| 617E10100 COMPACTED AGGREGATE | 4 CY | $255 | $468 | $580 | $175 | $529 | $536 | $85.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 3,500 LB | $3.25 | $3.10 | $4.00 | $1.00 | $4.00 | $3.50 | $8.00 |
| 638E07800 6" GATE VALVE AND VALVE BOX | 5 EACH | $1,800 | $1,998 | $1,750 | $1,700 | $2,000 | $1,340 | $3,800 |
| 638E07900 8" GATE VALVE AND VALVE BOX | 2 EACH | $2,500 | $2,559 | $2,450 | $2,650 | $2,650 | $1,582 | $4,500 |
| 638E08000 10" GATE VALVE AND VALVE BOX | 4 EACH | $3,600 | $3,345 | $4,450 | $3,600 | $3,694 | $2,815 | $5,800 |
| 638E08706 8" CUTTING-IN SLEEVE | 1 EACH | $1,400 | $5,457 | $3,350 | $2,700 | $8,356 | $4,115 | $5,000 |
| 638E09000 8" CUTTING-IN SLEEVE, VALVE AND VALVE BOX | 1 EACH | $4,200 | $7,705 | $5,550 | $4,600 | $10,800 | $6,558 | $8,000 |
| 638E09100 10" CUTTING-IN SLEEVE, VALVE AND VALVE BOX | 4 EACH | $4,900 | $9,771 | $8,650 | $5,700 | $10,508 | $4,590 | $8,500 |
| 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE | 1 EACH | $4,600 | $3,211 | $5,450 | $2,550 | $7,540 | $5,710 | $5,000 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 3 EACH | $2,800 | $2,918 | $1,350 | $2,000 | $1,586 | $1,620 | $2,500 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 9 EACH | $350 | $979 | $225 | $145 | $1,000 | $652 | $250 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 19 EACH | $1,200 | $2,379 | $250 | $400 | $1,000 | $1,290 | $1,500 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 19 EACH | $350 | $979 | $150 | $190 | $70.00 | $560 | $150 |
| 638E98000 WATER WORK, MISC.: FIRE HYDRANT REMOVED FOR STOR | 4 EACH | $750 | $1,353 | $650 | $500 | $650 | $700 | $900 |
| 638E98000 WATER WORK, MISC.: 6" FIRE HYDRANT (CITY OF STREE | 4 EACH | $8,200 | $9,654 | $7,500 | $7,400 | $11,387 | $9,200 | $12,000 |
| 638E98000 WATER WORK, MISC.: 6" FIRE HYDRANT WITH REMOTE SE | 1 EACH | $12,500 | $11,278 | $9,800 | $9,900 | $15,000 | $9,300 | $15,000 |
| 638E98000 WATER WORK, MISC.: CURB BOX | 17 EACH | $550 | $868 | $150 | $475 | $351 | $1,835 | $250 |
| 638E98100 WATER WORK, MISC.: CITY OF STREETSBORO WATER DEPA | 1 LS | $800 | $1,054 | $15,000 | $1,000 | $775 | $10,700 | $5,000 |
| 638E98600 WATER WORK, MISC.: 3/4" COPPER SERVICE LINE (CITY | 746 FT | $75.00 | $50.00 | $58.00 | $50.00 | $132 | $102 | $90.00 |
| 638E98600 WATER WORK, MISC.: WATER MAIN ABANDONED | 1,439 FT | $19.00 | $18.00 | $12.00 | $10.00 | $7.00 | $11.00 | $10.00 |
| 638E09520 10" X 10" TAPPING SLEEVE, VALVE AND VALVE BOX | 1 EACH | $10,000 | $10,395 | $16,500 | $11,000 | $8,443 | $11,330 | $15,000 |
| 638E98600 WATER WORK, MISC.: 6" WATER MAIN POLYVINYL CHLORID | 69 FT | $115 | $92.00 | $76.00 | $200 | $66.60 | $112 | $250 |
| 638E98600 WATER WORK, MISC.: 8" WATER MAIN POLYVINYL CHLORID | 44 FT | $205 | $100 | $86.00 | $264 | $270 | $104 | $250 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $1,500 | $787 | $450 | $850 | $813 | $1,505 | $1,000 |
| 611E99690 MANHOLE, MISC.: MANHOLE ADJUSTED TO GRADE (SANITA | 3 EACH | $1,900 | $787 | $800 | $2,400 | $1,693 | $2,465 | $2,000 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 2 EACH | $150 | $100 | $25.00 | $90.00 | $101 | $91.00 | $100 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 3 EACH | $10.00 | $11.00 | $25.00 | $10.00 | $13.50 | $12.00 | $12.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 16 EACH | $10.00 | $14.00 | $25.00 | $12.50 | $15.00 | $13.00 | $12.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 290.7 FT | $11.45 | $21.00 | $20.00 | $11.45 | $13.60 | $13.00 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 281.2 FT | $13.45 | $23.00 | $24.00 | $13.45 | $16.00 | $14.00 | $15.00 |
| 630E04101 GROUND MOUNTED SUPPORT, NO. 4 POST, AS PER PLAN | 39.5 FT | $15.80 | $36.00 | $28.00 | $15.80 | $18.80 | $23.00 | $18.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 45.6 FT | $13.90 | $24.00 | $24.00 | $13.90 | $16.50 | $18.00 | $16.00 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $30.00 | $71.00 | $55.00 | $30.00 | $35.00 | $54.00 | $35.00 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 1 EACH | $375 | $611 | $650 | $375 | $445 | $665 | $415 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 2 EACH | $88.90 | $206 | $150 | $88.90 | $105 | $258 | $100 |
| 630E80100 SIGN, FLAT SHEET | 326.2 SF | $31.20 | $45.00 | $55.00 | $31.20 | $37.00 | $19.00 | $35.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 32 EACH | $30.00 | $28.00 | $50.00 | $30.00 | $36.00 | $11.00 | $35.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $50.00 | $121 | $85.00 | $50.00 | $60.00 | $70.00 | $55.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 21 EACH | $25.00 | $43.00 | $45.00 | $25.00 | $29.75 | $16.00 | $30.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $350 | $462 | $380 | $285 | $291 | $263 | $400 |
| 630E86310 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL | 2 EACH | $200 | $355 | $550 | $65.00 | $238 | $70.00 | $250 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 1 EACH | $325 | $852 | $600 | $325 | $386 | $252 | $400 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 1 EACH | $25.00 | $43.00 | $50.00 | $25.00 | $29.75 | $27.00 | $30.00 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 1 EACH | $75.00 | $213 | $150 | $75.00 | $89.00 | $123 | $85.00 |
| 644E00100 EDGE LINE, 4" | 0.04 MILE | $10,000 | $9,456 | $11,000 | $10,000 | $11,887 | $7,200 | $11,100 |
| 644E00200 LANE LINE, 4" | 0.46 MILE | $5,000 | $2,039 | $5,500 | $5,000 | $5,943 | $1,540 | $5,500 |
| 644E00300 CENTER LINE | 1.84 MILE | $5,500 | $10,990 | $6,000 | $5,500 | $6,537 | $8,300 | $6,100 |
| 644E00400 CHANNELIZING LINE, 8" | 1,201 FT | $2.65 | $2.00 | $3.00 | $2.65 | $3.00 | $2.00 | $3.00 |
| 644E00500 STOP LINE | 311 FT | $6.25 | $9.00 | $7.00 | $6.25 | $7.50 | $7.00 | $8.00 |
| 644E00620 CROSSWALK LINE, 12" | 926 FT | $4.30 | $6.00 | $5.00 | $4.30 | $5.00 | $4.00 | $5.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 406 FT | $6.25 | $8.00 | $7.00 | $6.25 | $7.50 | $6.00 | $7.00 |
| 644E00900 ISLAND MARKING | 195 SF | $6.25 | $7.00 | $7.00 | $6.25 | $7.50 | $6.00 | $7.00 |
| 644E01300 LANE ARROW | 44 EACH | $100 | $178 | $125 | $100 | $119 | $134 | $110 |
| 644E01500 DOTTED LINE, 4" | 264 FT | $3.00 | $2.00 | $3.50 | $3.00 | $3.50 | $2.00 | $4.00 |
| 625E25400 CONDUIT, 2", 725.04 | 33 FT | $32.00 | $32.00 | $48.00 | $30.56 | $38.00 | $36.00 | $40.00 |
| 625E25600 CONDUIT, 4", 725.04 | 4 FT | $75.00 | $72.00 | $110 | $68.80 | $89.00 | $107 | $110 |
| 625E29000 TRENCH | 33 FT | $15.00 | $10.00 | $16.00 | $9.60 | $18.00 | $30.00 | $40.00 |
| 625E32000 GROUND ROD | 1 EACH | $350 | $290 | $440 | $276 | $416 | $295 | $300 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 33 FT | $2.50 | $1.00 | $1.00 | $0.51 | $3.00 | $3.00 | $3.00 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 4 EACH | $625 | $709 | $1,100 | $673 | $743 | $1,100 | $1,150 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 885 FT | $2.95 | $4.00 | $6.50 | $3.92 | $3.50 | $5.00 | $5.00 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $900 | $1,558 | $2,400 | $1,480 | $1,070 | $2,040 | $2,100 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 341 FT | $1.85 | $4.00 | $5.50 | $3.36 | $2.00 | $4.00 | $5.00 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $2,500 | $2,997 | $4,500 | $2,848 | $2,971 | $911 | $1,000 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM VIDEO DETECTION CAME | 1 EACH | $3,500 | $854 | $1,280 | $811 | $4,160 | $911 | $1,000 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM, PEDESTAL SUPPORT | 1 EACH | $300 | $1,036 | $1,600 | $984 | $356 | $483 | $500 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM, PREEMPTION CONFIRMA | 1 EACH | $300 | $264 | $400 | $251 | $356 | $268 | $300 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM, PULL BOX | 1 EACH | $400 | $989 | $1,500 | $940 | $476 | $582 | $600 |
| 632E90201 REUSE OF VEHICULAR SIGNAL HEAD, AS PER PLAN | 2 EACH | $500 | $517 | $780 | $491 | $595 | $536 | $600 |
| 632E90203 REUSE OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN | 2 EACH | $400 | $462 | $700 | $439 | $475 | $483 | $500 |
| 632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN | 2 EACH | $100 | $222 | $350 | $211 | $119 | $161 | $200 |
| 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER MODIFICATIONS | 1 EACH | $2,800 | $1,823 | $2,800 | $1,732 | $3,328 | $1,340 | $1,400 |
| 633E99000 CONTROLLER ITEM, MISC.: VIDEO DETECTION SYSTEM MOD | 1 EACH | $2,100 | $1,499 | $2,300 | $1,424 | $2,496 | $1,026 | $1,100 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 157 CY | $150 | $132 | $70.00 | $112 | $49.00 | $68.00 | $100 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 404 FT | $30.00 | $44.00 | $30.00 | $24.50 | $47.00 | $40.00 | $25.00 |
| 611E06400 15" CONDUIT, TYPE D | 650 FT | $16.00 | $60.00 | $155 | $32.00 | $93.00 | $66.00 | $150 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $75.00 | $68.00 | $85.00 | $85.00 | $95.00 | $80.00 | $100 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,800 | $3,126 | $2,800 | $2,860 | $3,019 | $2,360 | $2,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $36,850 | $50,936 | $35,000 | $37,000 | $43,803 | $35,000 | $30,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 55 CY | $260 | $368 | $285 | $240 | $450 | $500 | $400 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 17 EACH | $20.00 | $11.00 | $20.00 | $30.00 | $14.00 | $10.00 | $15.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 17 EACH | $20.00 | $28.00 | $25.00 | $30.00 | $23.00 | $15.00 | $25.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 1 SNMT | $1,250 | $1,492 | $1,400 | $1,250 | $1,485 | $1,365 | $5,000 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.78 MILE | $750 | $1,307 | $820 | $750 | $891 | $990 | $900 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 2.04 MILE | $2,500 | $3,197 | $2,750 | $2,500 | $2,971 | $2,400 | $2,800 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 3.06 MILE | $750 | $2,138 | $820 | $750 | $891 | $1,600 | $900 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 172 FT | $2.00 | $1.00 | $2.20 | $2.00 | $2.50 | $1.00 | $3.00 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 586 FT | $1.50 | $1.00 | $1.75 | $1.50 | $1.75 | $1.00 | $2.00 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 383 FT | $4.00 | $5.00 | $4.50 | $4.00 | $4.75 | $4.00 | $5.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 161 FT | $4.00 | $6.00 | $4.50 | $4.00 | $4.75 | $4.00 | $5.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 2 EACH | $75.00 | $139 | $85.00 | $75.00 | $89.00 | $107 | $90.00 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 69 SF | $3.00 | $213 | $3.50 | $3.00 | $3.50 | $3.00 | $4.00 |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $40,000 | $24,170 | $85,500 | $49,000 | $11,775 | $85,000 | $50,000 |
| 616E10000 WATER | 85 MGAL | $8.00 | $22.00 | $10.00 | $25.00 | $10.00 | $140 | $250 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 620 FT | $30.00 | $53.00 | $38.00 | $35.00 | $55.00 | $19.00 | $25.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: PAVEMENT PATCHING | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E21360 WORK ZONE CENTER LINE, CLASS I, 648 | 3.15 MILE | $6,000 | $3,197 | $6,500 | $6,000 | $7,132 | $4,400 | $8,000 |
| 614E22330 WORK ZONE EDGE LINE, CLASS I, 4", 648 | 5.55 MILE | $3,000 | $2,138 | $3,400 | $3,000 | $3,566 | $2,600 | $3,500 |
| 614E23140 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 648 | 750 FT | $2.75 | $1.00 | $3.00 | $2.75 | $3.25 | $2.25 | $3.00 |
| 614E26120 WORK ZONE STOP LINE, CLASS I, 648 | 180 FT | $25.00 | $6.00 | $28.00 | $25.00 | $29.75 | $11.00 | $28.00 |
| 614E30120 WORK ZONE ARROW, CLASS I, 648 | 6 EACH | $300 | $139 | $325 | $300 | $356 | $161 | $335 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $65,000 | $45,000 | $95,000 | $66,472 | $36,400 | $60,000 |
| 619E16010 FIELD OFFICE, TYPE B | 21 MNTH | $2,100 | $946 | $2,500 | $2,500 | $1,750 | $2,200 | $2,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $39,000 | $45,000 | $65,500 | $52,250 | $48,000 | $60,000 | $75,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 1,398 CY | $235 | $329k | 6% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,198 CY | $265 | $317k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,836 CY | $170 | $312k | 5% |
| 638E98600 WATER WORK, MISC.: 10" WATER MAIN POLYVINYL CHLORI | 1,605 FT | $185 | $297k | 5% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 4,311 SY | $55 | $237k | 4% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 2,012 FT | $112 | $225k | 4% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 9,170 FT | $24 | $220k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $220,000 | $220k | 4% |
| 611E10400 24" CONDUIT, TYPE B, 748.02 | 669 FT | $290 | $194k | 3% |
| 304E20000 AGGREGATE BASE | 2,861 CY | $64 | $183k | 3% |