CLI-SR 73/SR 380-15.22/08.27
CLI County · est $1.1M
Bid dateThursday, November 3—
CLI County · est $1.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 58 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Eagle Bridge CO | R3Bcc Ohio INC | R4Double Z Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 6,509 SF | $22.00 | $22.00 | $21.00 | $20.00 | 18% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 4,250 SF | $22.00 | $22.00 | $21.00 | $20.00 | 12% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 452 SY | $175 | $130 | $146 | $100 | 10% |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 452 SY | $150 | $140 | $117 | $180 | 9% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 10 CY | $5,500 | $4,500 | $2,620 | $2,250 | 7% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 68 FT | $650 | $800 |
| Item | Quantity | R1Complete General Construction Company | R2Eagle Bridge CO | R3Bcc Ohio INC | R4Double Z Construction Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5,000 | $8,835 | $35,000 |
| 202E23000 PAVEMENT REMOVED | 120 SY | $40.00 | $25.00 | $31.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 350 FT | $1.80 | $2.50 | $1.89 | $6.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 4 EACH | $335 | $275 | $352 | $250 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,118 |
| $890 |
| 6% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (49 CY | $750 | $335 | $788 | $400 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (D = 1.00") | 1,767 SY | $19.50 | $4.70 | $20.48 | $4.00 | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $30,000 | $65,000 | $29,598 | $65,000 | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 220 SY | $125 | $155 | $102 | $128 | 4% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 203.67 FT | $130 | $122 | $137 | $122 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $90,000 | $56,970 | $75,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $40,000 | $46,089 | $40,000 | 3% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $17,500 | $8,500 | $7,064 | $20,000 | 2% |
| 513E10200 STRUCTURAL STEEL MEMBERS, LEVEL UF | 1,588 LB | $10.00 | $9.13 | $10.47 | $12.50 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 780 FT | $18.00 | $25.00 | $20.87 | $20.00 | 2% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 6,509 SF | $2.00 | $2.00 | $6.30 | $6.00 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 6,509 SF | $2.00 | $2.00 | $4.20 | $4.00 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 6,509 SF | $2.00 | $2.00 | $4.20 | $4.00 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 4 EACH | $2,880 | $2,600 | $3,024 | $2,600 | 1% |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED |
| 4 EACH |
| $50.00 |
| $75.00 |
| $52.50 |
| $70.00 |
| 209E15050 RESHAPING UNDER GUARDRAIL | 0.08 MILE | $2,150 | $5,750 | $2,258 | $5,750 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 150 FT | $22.80 | $25.00 | $23.94 | $25.00 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $1,140 | $1,150 | $1,197 | $1,150 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $3,000 | $5,000 | $5,283 | $3,600 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $1,500 | $1,150 | $2,165 | $3,440 |
| 659E10000 SEEDING AND MULCHING | 750 SY | $5.56 | $6.00 | $4.83 | $14.08 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $568 | $1,500 | $494 | $1,500 |
| 659E31000 LIME | 0.16 ACRE | $36.25 | $10.00 | $31.50 | $200 |
| 659E35000 WATER | 8 MGAL | $1.21 | $10.00 | $1.05 | $1.00 |
| 832E30000 EROSION CONTROL | 1,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 159 GAL | $10.00 | $4.00 | $10.50 | $1.00 |
| 621E00100 RPM | 6 EACH | $400 | $400 | $494 | $485 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $30.00 | $19.68 | $36.00 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 14 EACH | $11.85 | $10.00 | $12.44 | $21.12 |
| 644E00104 EDGE LINE, 6" | 0.16 MILE | $12,638 | $12,638 | $13,302 | $19,685 |
| 644E00300 CENTER LINE | 0.08 MILE | $10,721 | $10,721 | $26,605 | $25,100 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $95,261 | $95,261 | $91,403 | $97,980 |
| 646E10200 CENTER LINE | 0.02 MILE | $80,800 | $80,800 | $182,805 | $121,140 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,380 FT | $3.50 | $1.50 | $3.68 | $2.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,500 | $2,310 | $2,200 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 18 EACH | $17.00 | $10.00 | $17.85 | $15.00 |
| 614E13318 BARRIER REFLECTOR, TYPE 5 (BI-DIRECTIONAL) | 14 EACH | $17.00 | $10.00 | $17.85 | $20.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 18 EACH | $21.00 | $15.00 | $22.05 | $22.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.4 MILE | $5,855 | $12,000 | $6,148 | $5,855 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.4 MILE | $4,445 | $7,500 | $4,667 | $4,445 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 48 FT | $19.50 | $10.00 | $20.48 | $19.50 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 958 LB | $5.00 | $3.00 | $3.09 | $2.00 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $5.00 | $1.50 | $3.11 | $2.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 10 EACH | $70.00 | $22.00 | $26.88 | $18.00 |
| 511E81300 CONCRETE, MISC.: EMBEDDED GALVANIC ANODES (EGA) | 264 EACH | $40.00 | $50.00 | $53.25 | $70.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 205 SY | $30.00 | $24.00 | $32.24 | $24.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 87 FT | $95.50 | $80.00 | $88.20 | $85.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 37 SY | $28.00 | $18.00 | $19.13 | $18.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 4,250 SF | $2.00 | $2.00 | $8.40 | $8.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 4,450 SF | $2.00 | $2.00 | $6.30 | $6.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 4,450 SF | $2.00 | $2.00 | $4.20 | $4.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 8 MNHR | $200 | $200 | $158 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 2 EACH | $200 | $200 | $263 | $250 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 68 FT | $30.00 | $35.00 | $26.63 | $33.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 360 FT | $14.50 | $20.00 | $14.10 | $16.50 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 27 SF | $225 | $350 | $141 | $222 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 24 SF | $200 | $165 | $159 | $220 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 13 CY | $200 | $450 | $600 | $400 |
| 848E50000 HAND CHIPPING | 15 SY | $50.00 | $110 | $179 | $200 |
| 848E50100 TEST SLAB | 1 LS | $1,500 | $2,500 | $2,025 | $750 |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $2,500 | $15,000 | $900 | $1,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 108 SY | $30.00 | $24.00 | $33.58 | $24.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 108 SY | $28.00 | $18.00 | $18.60 | $18.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 8 MNHR | $200 | $200 | $158 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 2 EACH | $200 | $200 | $263 | $250 |
| 516E31000 JOINT SEALER | 81 FT | $26.50 | $30.00 | $20.25 | $26.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $25,000 | $13,543 | $15,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $6,500 | $4,065 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 6,509 SF | $22 | $143k | 15% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 4,250 SF | $22 | $94k | 10% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 452 SY | $175 | $79k | 8% |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 452 SY | $150 | $68k | 7% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 10 CY | $5,500 | $55k | 6% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 68 FT | $650 | $44k | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (49 CY | $750 | $37k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (D = 1.00") | 1,767 SY | $19.5 | $34k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $30,000 | $30k | 3% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 220 SY | $125 | $28k | 3% |