CUY-Independence Blvd Bridge
CUY County · est $0.9M
Bid dateThursday, November 3—
CUY County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Black Horse Bridge Construction INC | R2J D Williamson Construction CO INC | R3Schirmer Construction LLC | R4Marucci & Gaffney Excavating CO | R5Kenmore Construction CO INC | % of bid |
|---|---|---|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 11 EACH | $15,600 | $18,000 | $17,500 | $13,675 | $20,000 | 22% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $81,000 | $123,000 | $115,000 | $200,000 | $60,000 | 10% |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 191 FT | $375 | $310 | $335 | $295 | $425 | 9% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 66 CY | $925 | $775 | $850 | $1,000 | $1,200 | 8% |
| 511E43511 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING, AS | 84 CY | $700 | $640 | $1,350 | $675 | $970 | 8% |
| Item | Quantity | R1Black Horse Bridge Construction INC | R2J D Williamson Construction CO INC | R3Schirmer Construction LLC | R4Marucci & Gaffney Excavating CO | R5Kenmore Construction CO INC |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 157 SY | $38.00 | $39.00 | $30.00 | $15.00 | $20.00 |
| 202E30000 WALK REMOVED | 1,076 SF | $2.00 | $2.70 | $3.00 | $3.00 | $3.00 |
| 202E32000 CURB REMOVED | 212 FT | $6.00 | $4.40 | $12.00 | $5.00 | $3.00 |
| 202E75000 FENCE REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 29,806 LB |
| $1.85 |
| $1.60 |
| $2.00 |
| $1.45 |
| $1.75 |
| 7% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 76 FT | $700 | $736 | $550 | $1,000 | $860 | 7% |
| 526E10001 REINFORCED CONCRETE APPROACH SLABS (T=12"), AS PER | 147 SY | $300 | $320 | $375 | $250 | $355 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $20,000 | $20,000 | $40,000 | $40,000 | 4% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 174 CY | $130 | $200 | $65.00 | $100 | $80.00 | 3% |
| 511E51511 CLASS QC2 CONCRETE, SIDEWALK, AS PER PLAN | 43 CY | $425 | $325 | $600 | $600 | $625 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 25 CF | $665 | $625 | $700 | $650 | $595 | 2% |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 92 FT | $180 | $130 | $130 | $100 | $160 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 43 CY | $335 | $352 | $360 | $335 | $350 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,000 | $10,000 | $4,000 | $20,000 | $10,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10,000 | $14,500 | $12,000 | $25,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $10,000 | $12,000 | $6,500 | $5,000 | 1% |
| 202E23500 WEARING COURSE REMOVED | 297 SY | $32.00 | $25.50 | $17.00 | $2.00 | $30.00 | 1% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 631 SF | $15.00 | $13.50 | $14.00 | $20.00 | $10.00 | 1% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $8,750 | $200 | $7,000 | $20,000 | $20,000 | 1% |
| 64 FT |
| $12.00 |
| $6.00 |
| $10.00 |
| $15.00 |
| $10.00 |
| 203E10000 EXCAVATION | 120 CY | $45.00 | $35.00 | $40.00 | $25.00 | $50.00 |
| 203E20000 EMBANKMENT | 6 CY | $45.00 | $105 | $175 | $100 | $100 |
| 204E10000 SUBGRADE COMPACTION | 359 SY | $5.00 | $6.00 | $4.00 | $6.00 | $3.00 |
| 607E23000 FENCE, TYPE CLT | 42 FT | $85.50 | $90.00 | $165 | $155 | $150 |
| 609E26000 CURB, TYPE 6 | 110 FT | $67.00 | $55.00 | $85.00 | $40.00 | $40.00 |
| 625E32000 GROUND ROD | 4 EACH | $345 | $365 | $250 | $250 | $350 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $158 | $25.00 | $20.00 | $200 |
| 659E00300 TOPSOIL | 19 CY | $90.00 | $40.00 | $125 | $75.00 | $40.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 171 SY | $7.00 | $5.00 | $10.00 | $15.00 | $19.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 9 SY | $10.00 | $1.50 | $5.00 | $1.00 | $2.00 |
| 659E15000 INTER-SEEDING | 9 SY | $10.00 | $0.20 | $5.00 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $500 | $1,600 | $100 | $500 | $1,600 |
| 659E31000 LIME | 0.04 ACRE | $200 | $95.00 | $100 | $50.00 | $90.00 |
| 659E35000 WATER | 0.95 MGAL | $1.05 | $1.00 | $50.00 | $1.00 | $10.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 96 FT | $40.00 | $28.00 | $35.00 | $20.00 | $20.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,750 | $775 | $500 | $750 | $400 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $1,750 | $765 | $900 | $1,350 | $500 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 60 CY | $96.00 | $95.00 | $125 | $110 | $70.00 |
| 407E10000 TACK COAT | 21 GAL | $4.00 | $4.00 | $5.00 | $4.00 | $5.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 14 CY | $515 | $540 | $600 | $515 | $530 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $1,500 | $305 | $250 | $100 | $450 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $90.00 | $32.00 | $100 | $89.40 | $90.00 |
| 630E85200 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY | 1 EACH | $80.00 | $53.00 | $90.00 | $79.50 | $80.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $90.00 | $53.00 | $100 | $89.40 | $90.00 |
| 630E86050 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DELIVER | 1 EACH | $80.00 | $79.00 | $90.00 | $79.50 | $80.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $69,000 | $60,500 | $75,000 | $68,930 | $68,930 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $80.00 | $68.00 | $55.00 | $60.00 | $85.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $4,330 | $5,000 | $10,000 | $5,000 |
| 202E22900 APPROACH SLAB REMOVED | 162 SY | $44.00 | $80.00 | $40.00 | $50.00 | $30.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 205 SY | $15.00 | $5.70 | $10.00 | $20.00 | $25.25 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 71 SY | $38.00 | $30.00 | $65.00 | $50.00 | $63.00 |
| 516E13400 3/4" PREFORMED EXPANSION JOINT FILLER | 8 SF | $15.00 | $25.00 | $5.00 | $20.00 | $50.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 31 SF | $15.00 | $25.00 | $6.00 | $20.00 | $50.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 98 FT | $30.00 | $30.00 | $45.00 | $40.00 | $50.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 22 EACH | $30.00 | $45.00 | $5.00 | $25.00 | $80.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 44 EACH | $125 | $110 | $135 | $152 | $170 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 28 CY | $120 | $130 | $185 | $100 | $75.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 92 FT | $16.00 | $20.00 | $55.00 | $20.00 | $25.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 18 FT | $18.00 | $20.00 | $55.00 | $20.00 | $50.00 |
| 530E13000 SPECIAL - FORM LINER | 381 SF | $14.00 | $60.00 | $45.00 | $23.10 | $35.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 54 CY | $115 | $155 | $155 | $100 | $210 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 24 CY | $180 | $340 | $625 | $130 | $150 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $7,500 | $10,000 | $5,000 | $10,000 | $7,500 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $2,000 | $6,500 | $3,000 | $5,000 | $5,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,000 | $2,000 | $6,000 | $10,000 | $30,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 11 EACH | $15,600 | $172k | 19% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $81,000 | $81k | 9% |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 191 FT | $375 | $72k | 8% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 66 CY | $925 | $61k | 7% |
| 511E43511 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING, AS | 84 CY | $700 | $59k | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 29,806 LB | $1.85 | $55k | 6% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 76 FT | $700 | $53k | 6% |
| 526E10001 REINFORCED CONCRETE APPROACH SLABS (T=12"), AS PER | 147 SY | $300 | $44k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 3% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 174 CY | $130 | $23k | 2% |