LOR-US 20-19.83
LOR County · est $1.6M
Bid dateThursday, November 17—
LOR County · est $1.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Chagrin Valley Paving INC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,243 CY | $212 | $200 | $240 | 43% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $150,000 | $160,000 | $212,017 | 9% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 496 CY | $285 | $400 | $350 | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (SEE PAVEMENT A | 77,838 SY | $1.70 | $3.00 | $1.75 | 8% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 212 CY | $600 | $600 | $650 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $98,071 | $90,000 | $40,000 | 6% |
| 617E10100 COMPACTED AGGREGATE | 1,096 CY |
| Item | Quantity | R1Karvo Companies INC | R2Chagrin Valley Paving INC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,925.5 SF | $2.00 | $2.00 | $5.00 |
| 202E32000 CURB REMOVED | 160.35 FT | $10.00 | $9.00 | $11.50 |
| 202E32500 CURB AND GUTTER REMOVED | 45 FT | $12.00 | $11.00 | $13.00 |
| 202E38000 GUARDRAIL REMOVED | 100 FT | $3.00 | $3.00 | $3.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 193.75 FT | $12.50 | $12.50 | $12.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $35.00 |
| $75.00 |
| $35.00 |
| 2% |
| AA2 644E00104 EDGE LINE, 6" (WHITE) (ALTERNATE 2) | 7.02 MILE | $3,550 | $3,550 | $4,260 | 2% |
| 253E02000 PAVEMENT REPAIR(TRANSVERSE) | 32 CY | $750 | $800 | $775 | 2% |
| 608E52000 CURB RAMP | 1,298.38 SF | $18.00 | $20.00 | $13.50 | 1% |
| AA2 644E00300 CENTER LINE (ALTERNATE 2) | 3.51 MILE | $5,990 | $5,990 | $7,188 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 6,982 GAL | $3.00 | $2.00 | $3.00 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 25 EACH | $815 | $1,000 | $875 | 1% |
| 253E02000 PAVEMENT REPAIR(LONGITUDINAL) | 74 CY | $250 | $500 | $700 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,000 | $15,000 | $7,500 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 3,294 GAL | $4.00 | $2.00 | $4.00 | 1% |
| 608E10000 4" CONCRETE WALK | 940.5 SF | $12.00 | $15.00 | $13.50 | 1% |
| AA2 644E01300 LANE ARROW (LEFT) (ALTERNATE 2) | 83 EACH | $125 | $125 | $150 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,150 | $2,150 | $2,150 | 1% |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 2,302 FT | $3.50 | $3.50 | $3.50 | 1% |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $250 | $250 | $250 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 4 EACH | $525 | $525 | $525 |
| 203E20001 EMBANKMENT, AS PER PLAN (CURB RAMPS) | 6.75 CY | $165 | $165 | $100 |
| 203E20001 EMBANKMENT, AS PER PLAN (GUARDRAIL) | 12 CY | $80.00 | $80.00 | $80.00 |
| 209E60500 LINEAR GRADING | 7.01 MILE | $1,000 | $500 | $3,000 |
| 209E80000 GRADING MAILBOX APPROACHES | 27 EACH | $50.00 | $50.00 | $25.00 |
| 606E16050 GUARDRAIL REBUILT, TYPE MGS | 193.75 FT | $32.00 | $32.00 | $32.00 |
| 606E35150 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 4 | 4 EACH | $675 | $675 | $675 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 1 EACH | $500 | $1,000 | $900 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN ( | 44.51 FT | $50.00 | $75.00 | $45.00 |
| 609E26000 CURB, TYPE 6 | 49.82 FT | $45.00 | $70.00 | $40.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $500 | $1,000 | $850 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED (PEDESTAL FOUN | 2 EACH | $1,000 | $1,500 | $150 |
| 630E80100 SIGN, FLAT SHEET (PEDESTAL FOUNDATION) | 2 SF | $200 | $100 | $250 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL (PEDESTA | 2 EACH | $200 | $100 | $50.00 |
| 646E10010 EDGE LINE, 6" (WHITE) | 0.04 MILE | $65,000 | $65,000 | $65,000 |
| 646E10200 CENTER LINE | 0.02 MILE | $80,000 | $80,000 | $80,000 |
| AA2 644E00400 CHANNELIZING LINE, 8" (ALTERNATE 2) | 1,151 FT | $3.00 | $3.00 | $3.60 |
| AA2 644E00500 STOP LINE (ALTERNATE 2) | 369 FT | $8.00 | $8.00 | $9.60 |
| AA2 644E00700 TRANSVERSE/DIAGONAL LINE (YELLOW) (ALTERNATE 2) | 105 FT | $8.00 | $8.00 | $9.60 |
| AA2 644E00900 ISLAND MARKING (YELLOW) (ALTERNATE 2) | 285 SF | $4.00 | $4.00 | $4.80 |
| AA2 644E01000 RAILROAD SYMBOL MARKING (ALTERNATE 2) | 1 EACH | $600 | $600 | $720 |
| AA2 644E01100 SCHOOL SYMBOL MARKING, 72" (ALTERNATE 2) | 4 EACH | $400 | $400 | $480 |
| AA2 644E01300 LANE ARROW (RIGHT) (ALTERNATE 2) | 4 EACH | $125 | $125 | $150 |
| AA2 644E50300 PAVEMENT MARKING, MISC.: CROSSWALK LINE, 18" (ALTE | 814 FT | $8.00 | $8.00 | $9.60 |
| 625E32000 GROUND ROD | 2 EACH | $275 | $350 | $275 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 2 EACH | $1,900 | $1,200 | $1,900 |
| 632E90010 PEDESTAL, MISC.: REUSE OF PEDESTRIAN PEDESTAL | 2 EACH | $2,300 | $600 | $2,300 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM (PEDE | 2 EACH | $225 | $800 | $225 |
| 632E90203 REUSE OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN | 2 EACH | $850 | $450 | $850 |
| 632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN | 2 EACH | $325 | $200 | $325 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $85.00 | $125 | $80.00 |
| 614E12460 WORK ZONE MARKING SIGN | 78 EACH | $75.00 | $75.00 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $325 | $300 | $1,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 7.02 MILE | $75.00 | $1,250 | $1,250 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 738 FT | $5.00 | $5.00 | $5.00 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $2,000 | $1,500 | $2,900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $6,900 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,243 CY | $212 | $688k | 40% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $150,000 | $150k | 9% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 496 CY | $285 | $141k | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (SEE PAVEMENT A | 77,838 SY | $1.7 | $132k | 8% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 212 CY | $600 | $127k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $98,071 | $98k | 6% |
| 617E10100 COMPACTED AGGREGATE | 1,096 CY | $35 | $38k | 2% |
| AA2 644E00104 EDGE LINE, 6" (WHITE) (ALTERNATE 2) | 7.02 MILE | $3,550 | $25k | 1% |
| 253E02000 PAVEMENT REPAIR(TRANSVERSE) | 32 CY | $750 | $24k | 1% |
| 608E52000 CURB RAMP | 1,298.38 SF | $18 | $23k | 1% |