D12-BH FY2022 Overlay
D12 County · est $3.1M
Bid dateThursday, December 1—
D12 County · est $3.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 151 more items below.
| Item | Quantity | R1Great Lakes Construction CO | R2Chagrin Valley Paving INC | R3Catts Construction INC | % of bid |
|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $389,000 | $150,000 | $269,800 | 17% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $300,000 | $270,000 | $210,000 | 13% |
| 847E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY (1 1/2" THI | 1,660 SY | $85.00 | $103 | $70.00 | 6% |
| 847E50000 HAND CHIPPING | 655 SY | $200 | $135 | $200 | 6% |
| 847E50000 HAND CHIPPING | 570 SY | $200 | $135 | $300 | 5% |
| 847E50000 HAND CHIPPING | 570 SY | $200 | $130 | $100 | 5% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 254 CY | $400 |
| Item | Quantity | R1Great Lakes Construction CO | R2Chagrin Valley Paving INC | R3Catts Construction INC |
|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $20,000 | $20,000 | $11,500 |
| 202E23000 PAVEMENT REMOVED | 290 SY | $40.00 | $100 | $27.00 |
| 202E32000 CURB REMOVED | 74 FT | $10.00 | $80.00 | $13.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 150 FT | $2.40 | $4.00 | $15.00 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 4 EACH | $115 | $150 | $140 |
| 203E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $500 |
| $600 |
| 5% |
| 847E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (2" THICK) | 1,424 SY | $65.00 | $103 | $80.00 | 4% |
| 847E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (2" THICK) | 1,423 SY | $65.00 | $103 | $70.00 | 4% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 112 SNMT | $725 | $1,100 | $1,100 | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $80,000 | $60,000 | $73,175 | 4% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 811 SY | $90.00 | $55.00 | $70.00 | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $70,000 | $60,000 | $39,000 | 3% |
| 516E10501 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC C | 80.67 FT | $850 | $850 | $1,000 | 3% |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 0.9 MILE | $74,090 | $75,000 | $7,925 | 3% |
| 511E53014 CLASS QC3 CONCRETE, MISC.: SUPERSTRUCTURE, WITH MA | 15 CY | $4,400 | $2,500 | $3,000 | 3% |
| 847E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY (1 1/2" THI | 493 SY | $125 | $134 | $90.00 | 3% |
| 516E10501 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC C | 71.67 FT | $850 | $900 | $1,000 | 3% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 136 SY | $445 | $400 | $500 | 3% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 136 SY | $445 | $350 | $500 | 3% |
| 50 CY |
| $90.00 |
| $90.00 |
| $72.00 |
| 203E20000 EMBANKMENT | 50 CY | $40.00 | $100 | $72.00 |
| 204E10000 SUBGRADE COMPACTION | 626 SY | $10.00 | $15.00 | $1.50 |
| 204E45000 PROOF ROLLING | 2 HOUR | $300 | $1,000 | $250 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 3 STA | $1,200 | $1,000 | $115 |
| 606E16050 GUARDRAIL REBUILT, TYPE MGS | 150 FT | $22.40 | $25.00 | $3.00 |
| 606E35012 MGS BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 4 EACH | $2,880 | $3,000 | $3,508 |
| 690E98400 SPECIAL - SITE ACCESS | 1 LS | $43,000 | $20,000 | $15,000 |
| 659E00300 TOPSOIL | 10 CY | $100 | $100 | $150 |
| 659E10000 SEEDING AND MULCHING | 768 SY | $6.95 | $8.00 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 6 SY | $2.40 | $15.00 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $1,650 | $800 | $913 |
| 659E35000 WATER | 2 MGAL | $2.00 | $50.00 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 200 FT | $35.00 | $30.00 | $39.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5" DEPTH) | 8,131 SY | $2.85 | $6.00 | $2.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.75" DEPTH) | 13 SY | $100 | $100 | $400 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 322 FT | $3.50 | $12.00 | $7.50 |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 88 CY | $385 | $750 | $500 |
| 304E20000 AGGREGATE BASE | 115 CY | $160 | $75.00 | $90.00 |
| 407E10000 TACK COAT | 689 GAL | $1.00 | $5.00 | $3.50 |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (12 CY | $820 | $1,000 | $1,200 |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 68 CY | $365 | $850 | $800 |
| 609E24510 CURB, TYPE 4-C | 124 FT | $65.00 | $75.00 | $120 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 3,416 FT | $1.50 | $2.00 | $2.00 |
| 621E00100 RPM | 36 EACH | $155 | $175 | $190 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 36 EACH | $10.00 | $130 | $190 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 52 EACH | $12.50 | $15.00 | $16.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE WAY) | 8 EACH | $12.50 | $15.00 | $15.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $5.85 | $25.00 | $28.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 85 FT | $6.15 | $30.00 | $29.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $24.95 | $100 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 13.5 SF | $20.05 | $30.00 | $31.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $24.65 | $50.00 | $18.25 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $140 | $100 | $79.25 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 8 EACH | $29.85 | $35.00 | $24.50 |
| 646E10010 EDGE LINE, 6" | 1.09 MILE | $9,465 | $25,000 | $27,430 |
| 646E10300 CHANNELIZING LINE, 8" | 24 FT | $15.00 | $60.00 | $60.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $80.00 | $100 | $85.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,050 | $3,000 | $3,023 |
| 614E12420 DETOUR SIGNING | 1 LS | $14,450 | $18,000 | $18,285 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 30 EACH | $4.20 | $20.00 | $15.50 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (ONE WAY) | 30 EACH | $4.30 | $20.00 | $16.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 60 EACH | $14.70 | $25.00 | $19.00 |
| 621E91000 RPM, MISC.: REMOVE REFLECTORS FROM CASTINGS | 1 LS | $7,215 | $12,000 | $9,152 |
| 621E91000 RPM, MISC.: REPLACE DAMAGED RPM CASTING | 1 LS | $7,965 | $15,000 | $9,762 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,400 FT | $20.00 | $22.00 | $18.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $45,000 | $50,000 | $59,000 |
| 202E22900 APPROACH SLAB REMOVED | 120 SY | $120 | $55.00 | $60.00 |
| 202E30000 WALK REMOVED | 241 SF | $10.00 | $25.00 | $18.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 1,627 LB | $2.10 | $2.75 | $2.50 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $2.00 | $10.00 | $9.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 152 EACH | $30.00 | $23.00 | $16.00 |
| 511E53014 CLASS QC3 CONCRETE, MISC.: SUPERSTRUCTURE, WITH MA | 12 CY | $3,300 | $2,500 | $2,500 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 2 SY | $100 | $50.00 | $304 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 47 SY | $30.00 | $65.00 | $120 |
| 512E71500 SPECIAL - URETHANE TOP COAT SEALER | 25 SY | $45.00 | $50.00 | $30.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 97 SF | $20.00 | $15.00 | $14.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 179 SF | $35.00 | $50.00 | $60.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 20 SF | $150 | $300 | $190 |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 120 SY | $445 | $285 | $500 |
| 530E00200 SPECIAL - STRUCTURES: MEASURING AND SURVEYING EXIS | 1 LS | $2,000 | $5,000 | $1,350 |
| 608E15000 8" CONCRETE WALK | 241 SF | $20.00 | $40.00 | $16.00 |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 811 SY | $70.00 | $118 | $60.00 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 21 CY | $290 | $450 | $500 |
| 848E50000 HAND CHIPPING | 37 SY | $200 | $160 | $100 |
| 848E50100 TEST SLAB | 1 LS | $550 | $2,500 | $2,200 |
| 848E50201 FULL DEPTH REPAIR, AS PER PLAN | 7 CY | $600 | $2,500 | $2,000 |
| 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN | 811 SY | $25.00 | $18.00 | $23.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 116 SY | $54.03 | $130 | $40.00 |
| 202E22900 APPROACH SLAB REMOVED | 89 SY | $120 | $60.00 | $90.00 |
| 202E23500 WEARING COURSE REMOVED | 89 SY | $25.00 | $30.00 | $1.50 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $15,000 | $10,000 | $2,200 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,235 LB | $2.10 | $2.75 | $2.50 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 50 LB | $2.00 | $10.00 | $2.50 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 73 EACH | $30.00 | $25.00 | $16.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 1,412 SY | $19.50 | $35.00 | $32.00 |
| 512E71500 SPECIAL - URETHANE TOP COAT SEALER | 191 SY | $10.00 | $35.00 | $30.00 |
| 512E74001 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,390 SY | $38.51 | $35.00 | $30.00 |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 53 FT | $810 | $800 | $1,000 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 85 SF | $20.00 | $15.00 | $16.00 |
| 516E31010 2" DEEP JOINT SEALER | 72 FT | $5.00 | $20.00 | $16.00 |
| 518E51201 PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN (1 | 18 FT | $750 | $450 | $1,200 |
| 518E63300 STRUCTURE DRAINAGE, MISC.:FLUSHING AND CLEANING OF | 1 LS | $5,000 | $30,000 | $5,900 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 1,713 SF | $35.00 | $40.00 | $60.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 198 SF | $100 | $155 | $200 |
| 526E90010 TYPE A INSTALLATION | 50 FT | $275 | $300 | $300 |
| 530E00200 SPECIAL - STRUCTURES: MEASURING AND SURVEYING EXIS | 1 LS | $2,000 | $8,000 | $1,350 |
| 838E20751 GABIONS WITH ADDITIONAL COATING, AS PER PLAN | 10 CY | $1,200 | $500 | $1,500 |
| 847E20200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 32 CY | $290 | $450 | $400 |
| 847E30000 TEST SLAB | 1 LS | $550 | $2,500 | $2,200 |
| 847E30400 EXISTING CONCRETE OVERLAY REMOVED (1 3/4" THICK) | 1,423 SY | $20.00 | $18.00 | $13.00 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 1,391 LB | $2.12 | $2.75 | $3.50 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $2.00 | $6.00 | $4.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 100 EACH | $30.00 | $25.00 | $31.00 |
| 511E53014 CLASS QC3 CONCRETE, MISC.: SUPERSTRUCTURE, WITH MA | 10 CY | $4,600 | $2,600 | $4,000 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 108 SY | $10.00 | $20.00 | $35.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 553 SY | $19.50 | $35.00 | $32.00 |
| 512E74001 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 426 SY | $36.00 | $35.00 | $30.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 156 SF | $100 | $150 | $140 |
| 530E00200 SPECIAL - STRUCTURES: CLEANING OF BRIDGE SIDEWALK | 1 LS | $3,000 | $8,000 | $1,358 |
| 530E00200 SPECIAL - STRUCTURES: MEASURING AND SURVEYING EXIS | 1 LS | $2,000 | $8,000 | $1,350 |
| 847E20000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 13 CY | $290 | $450 | $500 |
| 847E30000 TEST SLAB | 1 LS | $550 | $2,500 | $2,902 |
| 847E30201 FULL DEPTH REPAIR, AS PER PLAN | 12 CY | $600 | $3,500 | $2,300 |
| 847E50000 HAND CHIPPING | 230 SY | $200 | $140 | $300 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $60,000 | $70,000 | $73,775 |
| 202E22900 APPROACH SLAB REMOVED | 89 SY | $120 | $55.00 | $70.00 |
| 202E23500 WEARING COURSE REMOVED | 89 SY | $25.00 | $30.00 | $8.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $10,000 | $2,250 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,223 LB | $2.10 | $2.75 | $2.50 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 50 LB | $2.00 | $10.00 | $13.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 82 EACH | $30.00 | $25.00 | $16.00 |
| 511E53014 CLASS QC3 CONCRETE, MISC.: SUPERSTRUCTURE, WITH MA | 14 CY | $3,500 | $2,000 | $3,100 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 1,282 SY | $19.50 | $35.00 | $32.00 |
| 512E74001 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,222 SY | $26.85 | $35.00 | $30.00 |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 53 FT | $810 | $850 | $1,000 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 73 SF | $20.00 | $15.00 | $17.00 |
| 516E31010 2" DEEP JOINT SEALER | 61 FT | $5.00 | $20.00 | $17.00 |
| 518E51101 8" PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN | 5 FT | $595 | $1,500 | $695 |
| 518E51201 PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN (1 | 61 FT | $550 | $450 | $1,000 |
| 518E63300 STRUCTURE DRAINAGE, MISC.:FLUSHING AND CLEANING OF | 1 LS | $5,000 | $25,000 | $5,905 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 207 SF | $100 | $125 | $200 |
| 526E90010 TYPE A INSTALLATION | 49 FT | $275 | $250 | $200 |
| 530E00200 SPECIAL - STRUCTURES: MEASURING AND SURVEYING EXIS | 1 LS | $2,000 | $8,000 | $1,350 |
| 611E98645 CATCH BASIN GRATE, AS PER PLAN | 1 EACH | $630 | $4,000 | $1,044 |
| 847E20200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 32 CY | $290 | $450 | $400 |
| 847E30000 TEST SLAB | 1 LS | $550 | $2,500 | $2,012 |
| 847E30400 EXISTING CONCRETE OVERLAY REMOVED (1 3/4" THICK) | 1,424 SY | $20.00 | $15.00 | $13.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 8 SY | $125 | $75.00 | $305 |
| 519E11600 SPECIAL - PATCHING CONCRETE STRUCTURE: SIGN SUPPOR | 10 SF | $150 | $200 | $1,000 |
| 512E71500 SPECIAL - URETHANE TOP COAT SEALER | 97 SY | $25.00 | $35.00 | $30.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 871 SF | $25.00 | $40.00 | $60.00 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $2.00 | $10.00 | $4.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 2 SY | $500 | $100 | $610 |
| 516E10900 ELASTOMERIC COMPRESSION SEAL | 83.67 FT | $140 | $150 | $100 |
| 516E11800 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT | 77.67 FT | $250 | $275 | $400 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 13 SF | $200 | $300 | $400 |
| 847E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY, AS PER PLA | 216 SY | $80.00 | $135 | $30.00 |
| 847E20000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 36 CY | $290 | $450 | $400 |
| 847E30000 TEST SLAB | 1 LS | $550 | $2,500 | $2,200 |
| 847E30201 FULL DEPTH REPAIR, AS PER PLAN | 34 CY | $600 | $2,500 | $3,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $54,325 | $40,000 | $41,499 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $1,000 | $15,000 | $8,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 14 MNTH | $2,000 | $2,000 | $3,500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $10,000 | $32,950 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $389,000 | $389k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $300,000 | $300k | 8% |
| 847E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY (1 1/2" THI | 1,660 SY | $85 | $141k | 4% |
| 847E50000 HAND CHIPPING | 655 SY | $200 | $131k | 3% |
| 847E50000 HAND CHIPPING | 570 SY | $200 | $114k | 3% |
| 847E50000 HAND CHIPPING | 570 SY | $200 | $114k | 3% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 254 CY | $400 | $102k | 3% |
| 847E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (2" THICK) | 1,424 SY | $65 | $93k | 2% |
| 847E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (2" THICK) | 1,423 SY | $65 | $92k | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 112 SNMT | $725 | $81k | 2% |