STA-SR 687-01.40
STA County · est $2.6M
Bid dateThursday, December 1—
STA County · est $2.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Barbicas Construction Company INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (4747 CY | $230 | $250 | $250 | 48% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1 1 | 136,711 SY | $1.75 | $2.75 | $1.75 | 11% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 19 EACH | $8,700 | $8,300 | $8,700 | 7% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 16 EACH | $8,900 | $8,600 | $8,900 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $134,076 | $77,500 | $100,000 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $157,050 | $245,000 | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,100 SY |
| Item | Quantity | R1Karvo Companies INC | R2Barbicas Construction Company INC | R3Shelly Company |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 78 SY | $15.00 | $63.00 | $30.00 |
| 202E30000 WALK REMOVED | 2,002 SF | $5.25 | $6.44 | $10.00 |
| 202E32500 CURB AND GUTTER REMOVED | 171 FT | $30.00 | $20.00 | $12.00 |
| 203E10000 EXCAVATION (FOR WALK OR CURB RAMP INSTALLATION) | 1 CY | $150 | $2,160 | $50.00 |
| 608E10000 4" CONCRETE WALK | 347 SF | $8.00 | $7.00 | $16.75 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $50.00 |
| $35.00 |
| $65.00 |
| 2% |
| 621E00100 RPM | 1,233 EACH | $34.00 | $29.50 | $29.50 | 2% |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 18 EACH | $2,000 | $1,800 | $1,300 | 2% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 18 EACH | $1,850 | $1,400 | $1,000 | 1% |
| 407E20000 NON-TRACKING TACK COAT ( @ 0.09 GAL/SY ) | 12,304 GAL | $2.50 | $4.50 | $2.50 | 1% |
| 646E10200 CENTER LINE | 7.24 MILE | $3,976 | $3,750 | $3,976 | 1% |
| 608E52000 CURB RAMP | 1,700 SF | $16.00 | $16.25 | $38.00 | 1% |
| 646E10110 LANE LINE, 6" | 7.72 MILE | $2,376 | $1,700 | $2,376 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $90.00 | $85.00 | $75.00 | 1% |
| 646E20300 LANE ARROW | 121 EACH | $142 | $145 | $142 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $20,000 | $12,000 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 10 EACH | $1,425 | $1,000 | $1,200 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 7.24 MILE | $1,690 | $1,100 | $1,690 | 1% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 5 EACH | $2,400 | $500 | $1,200 | 1% |
| 1 EACH |
| $250 |
| $1,400 |
| $500 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $2,000 | $1,650 | $1,625 |
| 659E00300 TOPSOIL | 2 CY | $50.00 | $750 | $1,200 |
| 659E10000 SEEDING AND MULCHING | 14 SY | $5.00 | $270 | $5.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 5 EACH | $1,700 | $1,500 | $1,500 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 2,550 LB | $0.50 | $2.25 | $4.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 136 FT | $75.00 | $55.00 | $55.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 987 EACH | $1.00 | $3.00 | $6.00 |
| 646E10310 CHANNELIZING LINE, 12" | 5,316 FT | $1.76 | $2.50 | $1.75 |
| 646E10400 STOP LINE | 730 FT | $11.00 | $13.00 | $11.00 |
| 646E10520 CROSSWALK LINE, 24" | 685 FT | $9.00 | $10.00 | $9.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 210 FT | $9.00 | $13.00 | $9.00 |
| 646E20504 DOTTED LINE, 6" | 515 FT | $3.00 | $1.85 | $3.00 |
| 614E12460 WORK ZONE MARKING SIGN | 25 EACH | $50.00 | $70.00 | $50.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $285 | $200 | $115 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $500 | $900 | $900 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 7.72 MILE | $695 | $600 | $695 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 7.72 MILE | $685 | $600 | $685 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 7.24 MILE | $1,275 | $1,100 | $1,275 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 5,316 FT | $0.59 | $0.75 | $0.60 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 5,316 FT | $0.58 | $0.75 | $0.60 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 730 FT | $3.10 | $3.50 | $3.10 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 730 FT | $2.80 | $3.50 | $2.80 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,000 | $700 | $2,200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,575 | $400 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (4747 CY | $230 | $1.09M | 46% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1 1 | 136,711 SY | $1.75 | $239k | 10% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 19 EACH | $8,700 | $165k | 7% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 16 EACH | $8,900 | $142k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $134,076 | $134k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $125k | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,100 SY | $50 | $55k | 2% |
| 621E00100 RPM | 1,233 EACH | $34 | $42k | 2% |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 18 EACH | $2,000 | $36k | 2% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 18 EACH | $1,850 | $33k | 1% |