COL-SR 14-01.42
COL County · est $0.6M
Bid dateThursday, December 15—
COL County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 46 more items below.
| Item | Quantity | R1Rudzik Excavating INC | R2Marucci & Gaffney Excavating CO | R3Digioia-suburban Excavating LLC | R4Shelly & Sands INC | R5Ohio-west Virginia Excavating CO | R6Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E96331 14' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN | 53 FT | $2,315 | $1,530 | $1,650 | $1,730 | $1,950 | $2,100 | 32% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 60 CY | $660 | $540 | $450 | $565 | $549 | $500 | 10% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 241 CY | $152 | $130 | $145 |
| Item | Quantity | R1Rudzik Excavating INC | R2Marucci & Gaffney Excavating CO | R3Digioia-suburban Excavating LLC | R4Shelly & Sands INC | R5Ohio-west Virginia Excavating CO | R6Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 318 SY | $12.00 | $7.25 | $12.00 | $17.00 | $29.00 | $15.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 187 FT | $8.00 | $5.00 | $15.00 | $17.00 | $44.00 | $30.00 |
| 202E38000 GUARDRAIL REMOVED | 430 FT | $3.00 | $2.00 | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $155 |
| $173 |
| $100 |
| 10% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 21 CY | $1,690 | $1,600 | $2,300 | $1,700 | $1,510 | $1,000 | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 62 CY | $359 | $326 | $195 | $310 | $510 | $385 | 6% |
| 611E07600 18" CONDUIT, TYPE C | 209 FT | $80.00 | $65.00 | $75.00 | $120 | $68.00 | $150 | 4% |
| 611E98470 CATCH BASIN, NO. 2-2B | 6 EACH | $2,090 | $2,500 | $2,100 | $2,200 | $3,300 | $2,000 | 3% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,700 | $2,000 | $12,500 | $5,000 | $4,000 | $5,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $9,181 | $10,000 | $15,000 | $20,000 | $20,000 | $55,861 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $9,100 | $8,000 | $24,900 | $20,000 | $8,300 | $5,000 | 2% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 71 CY | $120 | $90.00 | $145 | $140 | $142 | $120 | 2% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 11 CY | $680 | $616 | $705 | $315 | $815 | $640 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 82 FT | $90.00 | $65.00 | $75.00 | $89.00 | $74.00 | $140 | 2% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $7,000 | $27,000 | $12,500 | $15,000 | $12,800 | $53,000 | 2% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (16 CY | $360 | $326 | $375 | $335 | $630 | $450 | 2% |
| 503E21100 UNCLASSIFIED EXCAVATION | 570 CY | $10.00 | $65.00 | $20.00 | $36.00 | $50.00 | $20.00 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 16) | 2 EACH | $2,640 | $3,475 | $3,600 | $3,000 | $3,200 | $3,500 | 1% |
| 203E10000 EXCAVATION | 248 CY | $20.00 | $35.00 | $20.00 | $30.00 | $54.00 | $20.00 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 137.5 FT | $36.00 | $34.00 | $30.00 | $23.00 | $44.00 | $34.00 | 1% |
| $2.00 |
| $11.00 |
| $5.00 |
| 202E53100 MAILBOX REMOVED | 2 EACH | $50.00 | $25.00 | $125 | $10.00 | $200 | $100 |
| 203E20000 EMBANKMENT | 145 CY | $29.00 | $30.00 | $15.00 | $15.00 | $29.00 | $40.00 |
| 204E10000 SUBGRADE COMPACTION | 344 SY | $3.00 | $2.00 | $3.00 | $7.00 | $5.00 | $5.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $250 | $100 | $320 | $250 | $800 | $100 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 50 FT | $37.00 | $48.00 | $38.00 | $28.00 | $45.00 | $48.00 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 5 EACH | $300 | $11.00 | $220 | $500 | $275 | $500 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $175 | $150 | $200 | $195 | $900 | $100 |
| 690E98400 SPECIAL - WORK INVOLVING ASBESTOS CONTAINING MATER | 1 LS | $250 | $100 | $5,000 | $500 | $1,300 | $6,360 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 38 SY | $120 | $60.00 | $100 | $45.00 | $89.00 | $100 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $10.00 | $110 | $100 | $200 | $200 |
| 659E00300 TOPSOIL | 147 CY | $16.50 | $60.00 | $40.00 | $29.00 | $122 | $40.00 |
| 659E10000 SEEDING AND MULCHING | 1,326 SY | $2.30 | $3.00 | $2.80 | $2.60 | $4.00 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 66 SY | $1.60 | $0.01 | $1.00 | $0.80 | $4.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $100 | $500 | $960 | $900 | $1,900 | $1,000 |
| 659E31000 LIME | 0.27 ACRE | $100 | $10.00 | $170 | $160 | $100 | $500 |
| 659E35000 WATER | 7 MGAL | $0.10 | $0.01 | $1.10 | $1.00 | $1.00 | $100 |
| 602E20000 CONCRETE MASONRY | 0.5 CY | $3,475 | $4,000 | $3,150 | $4,100 | $6,000 | $2,000 |
| 605E31100 AGGREGATE DRAINS | 24 FT | $21.00 | $35.00 | $27.00 | $55.00 | $80.00 | $40.00 |
| 611E00400 4" CONDUIT, TYPE E | 6 FT | $52.00 | $15.00 | $45.00 | $70.00 | $73.00 | $50.00 |
| 611E04600 12" CONDUIT, TYPE C | 45 FT | $80.00 | $51.50 | $58.00 | $76.00 | $69.00 | $100 |
| 304E20000 AGGREGATE BASE | 56 CY | $82.00 | $85.00 | $90.00 | $125 | $156 | $65.00 |
| 407E10000 TACK COAT | 35 GAL | $4.40 | $4.00 | $4.60 | $3.30 | $25.00 | $3.00 |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 17 SY | $245 | $235 | $165 | $300 | $408 | $100 |
| 621E00100 RPM | 3 EACH | $910 | $825 | $400 | $825 | $1,100 | $825 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $50.00 | $5.00 | $50.00 | $25.00 | $110 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 4 EACH | $14.00 | $11.00 | $20.00 | $12.00 | $16.00 | $105 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.05 MILE | $20,000 | $18,000 | $31,200 | $18,000 | $24,500 | $29,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.02 MILE | $50,000 | $45,000 | $41,600 | $45,000 | $61,000 | $38,000 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $100 | $30.00 | $110 | $130 | $240 | $55.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,300 | $3,000 | $5,600 | $3,000 | $4,100 | $3,000 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.02 MILE | $57,750 | $52,000 | $95,500 | $53,000 | $72,000 | $85,900 |
| 616E10000 WATER | 20 MGAL | $0.10 | $0.01 | $25.00 | $20.00 | $1.00 | $100 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 7,582 LB | $0.50 | $1.87 | $1.00 | $2.40 | $3.00 | $1.50 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $1,210 | $1,500 | $3,500 | $1,200 | $4,425 | $1,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 85 SY | $45.00 | $25.00 | $32.00 | $30.00 | $44.00 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 117 SY | $20.00 | $25.00 | $25.00 | $23.00 | $34.00 | $50.00 |
| 512E33010 TYPE 3 WATERPROOFING | 101 SY | $25.00 | $37.00 | $42.00 | $23.00 | $34.00 | $40.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 55 SF | $3.00 | $20.00 | $13.00 | $3.00 | $3.00 | $5.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 12 CY | $140 | $200 | $120 | $260 | $265 | $100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,900 | $10,000 | $4,500 | $3,000 | $8,000 | $20,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,325 | $10,000 | $10,500 | $4,800 | $4,800 | $49,000 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $600 | $500 | $900 | $3,000 | $1,600 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $10,400 | $15,500 | $8,000 | $2,000 | $17,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96331 14' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN | 53 FT | $2,315 | $123k | 26% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 60 CY | $660 | $40k | 8% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 241 CY | $152 | $37k | 8% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 21 CY | $1,690 | $35k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 62 CY | $359 | $22k | 5% |
| 611E07600 18" CONDUIT, TYPE C | 209 FT | $80 | $17k | 4% |
| 611E98470 CATCH BASIN, NO. 2-2B | 6 EACH | $2,090 | $13k | 3% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1 | $10k | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,700 | $10k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $9,181 | $9k | 2% |