LOR-SR 83-21.40
LOR County · est $1.0M
Bid dateThursday, January 13—
LOR County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 80 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2Eclipse CO LLC | R3Black Horse Bridge Construction INC | % of bid |
|---|---|---|---|---|---|
| 611E71001 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE ARCH | 67 FT | $2,500 | $2,856 | $2,750 | 20% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 236 CY | $650 | $718 | $475 | 18% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $44,682 | $60,000 | 12% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 30,589 LB | $2.00 | $4.00 | $2.00 | 7% |
| 690E98400 SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAININ | 1 LS | $45,000 | $3,500 | $250 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 161 CY | $250 | $212 | $190 | 5% |
| 503E31100 ROCK EXCAVATION |
| Item | Quantity | R1Great Lakes Demolition Company | R2Eclipse CO LLC | R3Black Horse Bridge Construction INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,500 | $12,000 | $17,000 |
| 202E23000 PAVEMENT REMOVED | 654 SY | $15.00 | $17.00 | $24.00 |
| 202E30001 WALK REMOVED, AS PER PLAN | 1,553 SF | $3.00 | $1.00 | $4.00 |
| 202E38000 GUARDRAIL REMOVED | 281 FT | $3.00 | $2.00 | $2.00 |
| 202E75000 FENCE REMOVED | 114 FT | $10.00 | $3.00 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 144 CY |
| $250 |
| $63.00 |
| $85.00 |
| 4% |
| 638E20464 SPECIAL - 24" STEEL PIPE ENCASEMENT, BORED OR JACK | 44 FT | $650 | $1,280 | $1,635 | 3% |
| 503E22201 UNCLASSIFIED EXCAVATION, INCLUDING ROCK AND/OR SHA | 926 CY | $30.00 | $34.00 | $85.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 85 CY | $300 | $305 | $230 | 3% |
| 638E20424 SPECIAL - 12" WATER MAIN POLYVINYL CHLORIDE PIPE A | 212 FT | $100 | $377 | $340 | 2% |
| 608E13000 6" CONCRETE WALK | 2,256 SF | $9.00 | $15.00 | $9.00 | 2% |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 4 EACH | $5,000 | $7,799 | $3,600 | 2% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $18,500 | $19,000 | $51,800 | 2% |
| 622E24000 CONCRETE BARRIER, TYPE D | 73 FT | $250 | $243 | $150 | 2% |
| 638E98100 WATER WORK, MISC.:PROJECT RESTORATION | 1 LS | $15,000 | $2,786 | $14,000 | 2% |
| 638E20586 SPECIAL - 12" GATE VALVE WITH VALVE BOX (AVON LAKE | 2 EACH | $6,750 | $4,208 | $7,500 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,500 | $9,700 | $12,000 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,000 | $760 | $750 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $18,000 | $12,500 | 1% |
| 1 EACH |
| $250 |
| $177 |
| $350 |
| 202E98200 REMOVAL MISC.: WATER MAIN | 163 FT | $25.00 | $31.00 | $65.00 |
| 203E10000 EXCAVATION | 138 CY | $30.00 | $32.00 | $57.00 |
| 203E20000 EMBANKMENT | 92 CY | $25.00 | $30.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 533 SY | $2.00 | $1.00 | $3.00 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN | 20 CY | $30.00 | $101 | $40.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $200 | $241 | $160 |
| 204E50000 GEOTEXTILE FABRIC | 70 SY | $8.00 | $5.00 | $2.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 25 FT | $45.00 | $40.00 | $34.20 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 50 FT | $55.00 | $55.00 | $44.80 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $3,000 | $2,615 | $2,150 |
| 606E26151 ANCHOR ASSEMBLY, MGS TYPE E, AS PER PLAN MASH 2016 | 1 EACH | $4,000 | $4,067 | $3,280 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $4,500 | $1,802 | $1,420 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $3,500 | $3,417 | $2,875 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $2,500 | $579 | $525 |
| 607E20001 FENCE, TYPE CL, AS PER PLAN, 5' | 103 FT | $50.00 | $66.00 | $72.00 |
| 608E52000 CURB RAMP | 88 SF | $27.00 | $20.00 | $25.00 |
| 623E38500 MONUMENT ASSEMBLY | 1 EACH | $1,250 | $1,970 | $1,200 |
| 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET | 12 EACH | $950 | $207 | $400 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $250 | $228 | $150 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $300 | $111 | $100 |
| 659E00300 TOPSOIL | 83 CY | $60.00 | $38.00 | $52.00 |
| 659E10000 SEEDING AND MULCHING | 746 SY | $5.00 | $7.00 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 38 SY | $5.00 | $2.00 | $1.00 |
| 659E15000 INTER-SEEDING | 38 SY | $5.00 | $0.13 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $1,000 | $718 | $500 |
| 659E31000 LIME | 0.15 ACRE | $800 | $38.00 | $200 |
| 659E35000 WATER | 4 MGAL | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.2 CY | $2,500 | $2,575 | $3,000 |
| 605E05210 4" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 249 FT | $12.00 | $17.00 | $26.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 203 FT | $15.00 | $19.00 | $26.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 10 FT | $10.00 | $19.00 | $34.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 111 FT | $12.00 | $21.00 | $28.00 |
| 611E04600 12" CONDUIT, TYPE C | 39 FT | $50.00 | $89.00 | $42.00 |
| 611E98471 CATCH BASIN, NO. 2-2B, AS PER PLAN | 1 EACH | $1,050 | $3,070 | $2,500 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $1,200 | $572 | $3,300 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $500 | $384 | $450 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 200 LB | $5.00 | $6.00 | $20.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 413 SY | $25.00 | $16.50 | $18.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 320 FT | $10.00 | $6.00 | $3.00 |
| 304E20000 AGGREGATE BASE | 121 CY | $70.00 | $71.00 | $83.00 |
| 407E10000 TACK COAT | 159 GAL | $5.00 | $3.10 | $4.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 33 CY | $75.00 | $141 | $100 |
| 638E98000 WATER WORK, MISC.: 12" S.S. REPAIR CLAMP (AVON LAK | 2 EACH | $2,500 | $1,270 | $2,700 |
| 638E98000 WATER WORK, MISC.: FURNISH DUCTILE IRON PIPE BEND | 5 EACH | $850 | $988 | $900 |
| 638E98000 WATER WORK, MISC.: INSTALL DUCTILE IRON PIPE BEND | 5 EACH | $850 | $616 | $2,850 |
| 638E98100 WATER WORK, MISC.:ON-SITE FIELD TECHNICIAN FOR ASS | 1 LS | $8,500 | $20,000 | $23,000 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 7 EACH | $20.00 | $11.00 | $6.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 43 FT | $20.00 | $6.00 | $6.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 17 FT | $25.00 | $8.00 | $8.00 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $70.00 | $18.00 | $17.00 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 3 EACH | $150 | $100 | $90.00 |
| 630E80100 SIGN, FLAT SHEET | 17.5 SF | $50.00 | $19.00 | $18.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 7 EACH | $50.00 | $29.00 | $27.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $75.00 | $223 | $200 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $50.00 | $32.00 | $29.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $50.00 | $150 | $135 |
| 644E00104 EDGE LINE, 6" | 0.1 MILE | $20,000 | $25,500 | $25,000 |
| 644E00300 CENTER LINE | 0.06 MILE | $25,000 | $46,000 | $45,000 |
| 614E18002 MAINTAINING TRAFFIC, MISC.: PRE-CONSTRUCTION VIDEO | 1 LS | $1,500 | $2,786 | $3,000 |
| 616E10000 WATER | 7 MGAL | $5.00 | $19.00 | $100 |
| 616E20000 CALCIUM CHLORIDE | 1 TON | $800 | $557 | $100 |
| 203E20001 EMBANKMENT, AS PER PLAN | 560 CY | $20.00 | $24.00 | $78.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $4,500 | $22,000 | $60,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 359 SY | $20.00 | $22.00 | $30.00 |
| 512E33001 TYPE 2 WATERPROOFING, AS PER PLAN | 250 SY | $40.00 | $18.00 | $25.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 301 SF | $20.00 | $6.00 | $10.00 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 96 CY | $65.00 | $88.00 | $110 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 182 FT | $15.00 | $7.00 | $16.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 26 FT | $15.00 | $8.00 | $18.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 84 CY | $125 | $127 | $110 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 50 FT | $150 | $162 | $133 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $500 | $724 | $500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $9,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E71001 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE ARCH | 67 FT | $2,500 | $168k | 15% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 236 CY | $650 | $153k | 14% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 9% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 30,589 LB | $2 | $61k | 5% |
| 690E98400 SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAININ | 1 LS | $45,000 | $45k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 161 CY | $250 | $40k | 4% |
| 503E31100 ROCK EXCAVATION | 144 CY | $250 | $36k | 3% |
| 638E20464 SPECIAL - 24" STEEL PIPE ENCASEMENT, BORED OR JACK | 44 FT | $650 | $29k | 3% |
| 503E22201 UNCLASSIFIED EXCAVATION, INCLUDING ROCK AND/OR SHA | 926 CY | $30 | $28k | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 85 CY | $300 | $26k | 2% |