CRA-SR 96-03.88/04.18
CRA County · est $0.3M
Bid dateThursday, July 14—
CRA County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2Crawford Construction Company INC | R3Rietschlin Construction INC | R4Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|
| 602E20000 CONCRETE MASONRY | 55.2 CY | $856 | $620 | $1,500 | $2,220 | 17% |
| 624E10000 MOBILIZATION | 1 LS | $33,000 | $17,000 | $16,000 | $35,852 | 12% |
| 611E26000 72" CONDUIT, TYPE A (706.02, 707.02 (0.168) WITH C | 56 FT | $450 | $824 | $760 | $620 | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) (6") | 93 CY | $260 | $275 | $266 | $411 | 9% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 54 CY | $350 | $348 | $350 | $649 | 7% |
| 611E22200 54" CONDUIT, TYPE A (706.02, 707.02 (0.168) WITH C | 57 FT | $325 | $600 | $580 |
| Item | Quantity | R1Great Lakes Demolition Company | R2Crawford Construction Company INC | R3Rietschlin Construction INC | R4Eclipse CO LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $3,900 | $7,500 | $3,500 |
| 203E10000 EXCAVATION | 19 CY | $15.00 | $23.00 | $104 | $49.00 |
| 204E10000 SUBGRADE COMPACTION | 578 SY | $2.00 | $2.00 | $4.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 8 EACH | $10.00 | $12.00 | $11.00 | $10.90 |
| 659E00100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $450 |
| 7% |
| 606E15050 GUARDRAIL, TYPE MGS | 537.5 FT | $28.00 | $24.00 | $25.00 | $24.50 | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $3,000 | $3,000 | $2,836 | $2,885 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,500 | $2,950 | $4,000 | $9,500 | 4% |
| 304E20000 AGGREGATE BASE | 161 CY | $65.00 | $72.00 | $90.00 | $75.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $5,200 | $2,000 | $6,500 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25") | 267 SY | $30.00 | $10.00 | $9.00 | $32.50 | 3% |
| 659E00300 TOPSOIL | 151 CY | $50.00 | $17.00 | $42.00 | $70.00 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $7,000 | $6,300 | $6,100 | $7,695 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,356 SY | $5.00 | $2.75 | $3.25 | $3.35 | 2% |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 4 EACH | $1,650 | $1,100 | $995 | $1,989 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $3,500 | $5,000 | $9,000 | 2% |
| 203E20000 EMBANKMENT | 377 CY | $17.00 | $24.00 | $18.00 | $21.00 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 55 CY | $115 | $97.00 | $105 | $138 | 2% |
| 202E23000 PAVEMENT REMOVED | 534 SY | $9.00 | $5.00 | $9.00 | $4.00 | 2% |
| 2 EACH |
| $400 |
| $107 |
| $150 |
| $26.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 68 SY | $1.00 | $0.96 | $2.00 | $0.60 |
| 659E15000 INTER-SEEDING | 68 SY | $1.00 | $0.11 | $2.00 | $0.44 |
| 659E20000 COMMERCIAL FERTILIZER | 0.19 TON | $1,000 | $1,100 | $2,100 | $724 |
| 659E31000 LIME | 0.28 ACRE | $800 | $107 | $200 | $10.39 |
| 659E35000 WATER | 7.5 MGAL | $1.00 | $1.00 | $12.00 | $5.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 530 SY | $8.00 | $3.60 | $2.00 | $2.50 |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 120 FT | $10.00 | $88.00 | $52.00 | $25.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50.00 | $2,000 | $9,500 | $36,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 27 SY | $40.00 | $168 | $75.00 | $48.00 |
| 601E11000 RIPRAP, TYPE D | 25 SY | $95.00 | $403 | $175 | $687 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 28 CY | $115 | $112 | $135 | $130 |
| 605E31100 AGGREGATE DRAINS | 65 FT | $20.00 | $16.00 | $27.00 | $14.00 |
| 407E10000 TACK COAT | 88 GAL | $4.00 | $5.35 | $7.00 | $2.45 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 30 FT | $25.00 | $24.00 | $16.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $70.00 | $69.00 | $81.00 | $75.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 (WHITE) | 0.11 MILE | $15,000 | $13,000 | $9,700 | $12,150 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $25,000 | $34,000 | $10,700 | $13,500 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $500 | $750 | $1,100 | $650 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 602E20000 CONCRETE MASONRY | 55.2 CY | $856 | $47k | 15% |
| 624E10000 MOBILIZATION | 1 LS | $33,000 | $33k | 11% |
| 611E26000 72" CONDUIT, TYPE A (706.02, 707.02 (0.168) WITH C | 56 FT | $450 | $25k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) (6") | 93 CY | $260 | $24k | 8% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 54 CY | $350 | $19k | 6% |
| 611E22200 54" CONDUIT, TYPE A (706.02, 707.02 (0.168) WITH C | 57 FT | $325 | $19k | 6% |
| 606E15050 GUARDRAIL, TYPE MGS | 537.5 FT | $28 | $15k | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $3,000 | $12k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,500 | $11k | 3% |
| 304E20000 AGGREGATE BASE | 161 CY | $65 | $10k | 3% |