BUT-US 127-07.28/11.98
BUT County · est $0.8M
Bid dateThursday, January 12—
BUT County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Catts Construction INC | R2Complete General Construction Company | R3Sunesis Construction CO | R4Bcc Ohio INC | R5Brumbaugh Construction INC | R6Prus Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 844E10000 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION | 751 SF | $148 | $125 | $148 | $151 | $92.00 | $225 | 16% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,134 SY | $91.00 | $95.00 | $44.92 | $80.61 | $150 | $84.00 | 15% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 95 CY | $878 | $450 |
| Item | Quantity | R1Catts Construction INC | R2Complete General Construction Company | R3Sunesis Construction CO | R4Bcc Ohio INC | R5Brumbaugh Construction INC | R6Prus Construction Company |
|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $1,000 | $10,000 | $4,592 | $2,813 | $2,300 | $10,500 |
| 202E38000 GUARDRAIL REMOVED | 432 FT | $2.00 | $6.00 | $6.00 | $6.30 | $7.00 | $6.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 1 EACH | $416 | $75.00 | $223 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $450 |
| $772 |
| $455 |
| $500 |
| 12% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 1,134 SY | $48.00 | $50.00 | $63.31 | $85.54 | $150 | $63.00 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $45,000 | $20,000 | $56,427 | $20,084 | $50,000 | $40,000 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.50") | 1,788 SY | $23.00 | $24.00 | $24.00 | $19.43 | $11.50 | $19.85 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $38,000 | $44,000 | $33,720 | $59,043 | $108,000 | $225,000 | 5% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 416 SY | $90.00 | $195 | $62.57 | $124 | $90.00 | $92.00 | 5% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 230 FT | $143 | $160 | $140 | $127 | $155 | $140 | 5% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 416 SY | $48.60 | $140 | $132 | $151 | $150 | $138 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016 OR NCHRP 35 | 6 EACH | $3,333 | $2,700 | $2,700 | $2,940 | $3,000 | $2,700 | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 225 FT | $80.00 | $26.50 | $26.50 | $69.83 | $29.00 | $26.50 | 3% |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 29 CY | $538 | $400 | $585 | $690 | $450 | $425 | 2% |
| 516E10900 ELASTOMERIC COMPRESSION SEAL | 108 FT | $111 | $125 | $140 | $145 | $100 | $175 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $11,396 | $8,910 | $8,910 | $7,770 | $11,975 | $9,580 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,677 | $2,340 | $2,250 | $1,996 | $2,500 | $2,250 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 420 FT | $24.00 | $20.00 | $20.00 | $18.29 | $25.00 | $20.00 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $2,319 | $1,600 | $1,600 | $2,048 | $1,775 | $1,600 | 1% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $8,604 | $15,000 | $89,283 | $3,150 | $5,700 | $12,000 | 1% |
| $78.75 |
| $85.00 |
| $75.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $172 | $70.00 | $218 | $73.50 | $80.00 | $70.00 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $107 | $50.00 | $231 | $52.50 | $57.00 | $50.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 5 EACH | $71.50 | $125 | $273 | $131 | $142 | $125 |
| 606E15050 GUARDRAIL, TYPE MGS | 125 FT | $60.00 | $23.00 | $23.00 | $53.55 | $26.00 | $23.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $3,747 | $2,375 | $2,375 | $3,308 | $2,650 | $2,375 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,319 | $2,775 | $2,775 | $2,048 | $3,100 | $2,775 |
| 659E00540 SEEDING AND MULCHING, CLASS 3C | 455 SY | $2.50 | $9.44 | $14.87 | $3.15 | $3.00 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 23 SY | $1.00 | $1.24 | $1.00 | $4.20 | $4.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $660 | $652 | $1,500 | $840 | $750 | $1,500 |
| 659E35000 WATER | 2.5 MGAL | $1.00 | $1.24 | $1.00 | $7.20 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 221 GAL | $10.00 | $3.00 | $3.00 | $15.75 | $10.50 | $7.30 |
| 621E00100 RPM | 8 EACH | $624 | $470 | $387 | $406 | $580 | $525 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 10 EACH | $59.00 | $25.00 | $68.73 | $18.00 | $50.00 | $20.82 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 21 EACH | $13.00 | $15.00 | $15.00 | $11.55 | $17.00 | $32.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.1 MILE | $26,523 | $13,690 | $22,295 | $23,410 | $25,570 | $24,290 |
| 644E00104 EDGE LINE, 6" | 0.17 MILE | $30,657 | $17,845 | $25,770 | $27,059 | $35,975 | $34,175 |
| 644E00204 LANE LINE, 6" | 0.04 MILE | $12,967 | $9,000 | $10,900 | $11,445 | $15,775 | $14,985 |
| 644E00300 CENTER LINE | 0.08 MILE | $47,169 | $23,760 | $39,650 | $41,633 | $45,925 | $43,630 |
| 646E10010 EDGE LINE, 6" | 0.13 MILE | $44,921 | $49,610 | $37,760 | $39,648 | $40,025 | $38,020 |
| 646E10110 LANE LINE, 6" | 0.09 MILE | $19,000 | $24,900 | $15,975 | $16,774 | $27,085 | $25,730 |
| 646E10200 CENTER LINE | 0.07 MILE | $69,101 | $66,135 | $58,085 | $60,989 | $56,650 | $53,800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $45.00 | $85.00 | $75.00 | $84.00 | $75.00 | $100 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 10 EACH | $7.00 | $6.00 | $6.00 | $19.78 | $6.50 | $6.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 8 EACH | $18.00 | $15.00 | $15.00 | $25.49 | $16.50 | $15.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 16 EACH | $20.00 | $17.00 | $17.00 | $25.49 | $19.00 | $17.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 8 EACH | $26.00 | $22.00 | $22.00 | $29.81 | $24.00 | $22.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,250 | $995 | $995 | $1,045 | $1,200 | $1,050 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.38 MILE | $3,985 | $5,821 | $3,350 | $3,518 | $4,500 | $4,245 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.38 MILE | $3,985 | $5,821 | $3,350 | $3,518 | $7,750 | $7,350 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.34 MILE | $2,656 | $3,068 | $2,233 | $2,345 | $3,135 | $2,980 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.34 MILE | $2,656 | $4,042 | $2,233 | $2,345 | $5,950 | $5,655 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 96 FT | $11.00 | $3.90 | $9.30 | $9.77 | $26.00 | $25.00 |
| 690E98400 SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAININ | 1 LS | $72.00 | $5,000 | $295 | $450 | $500 | $4,000 |
| 516E31000 JOINT SEALER (705.04) | 84 FT | $28.50 | $25.00 | $25.00 | $19.10 | $17.50 | $45.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 47 SF | $148 | $125 | $202 | $125 | $165 | $175 |
| 530E00200 SPECIAL - STRUCTURES MICS.: CONSULTANT FOR CONCRET | 1 LS | $1,487 | $2,500 | $895 | $8,794 | $8,500 | $7,000 |
| 848E50000 HAND CHIPPING | 23 SY | $125 | $150 | $470 | $133 | $165 | $600 |
| 848E50100 TEST SLAB | 1 LS | $329 | $500 | $4,740 | $2,520 | $2,250 | $2,500 |
| 848E50200 FULL-DEPTH REPAIR | 11 CY | $536 | $1,300 | $1,848 | $1,367 | $600 | $2,800 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $1,440 | $15,000 | $818 | $2,250 | $3,088 | $6,000 |
| 516E31000 JOINT SEALER (705.04) | 68 FT | $28.50 | $25.00 | $25.00 | $19.10 | $20.00 | $55.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 184 FT | $13.00 | $14.75 | $14.75 | $19.31 | $15.00 | $32.00 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 12 CY | $556 | $400 | $585 | $690 | $450 | $450 |
| 848E50000 HAND CHIPPING | 4 SY | $104 | $150 | $605 | $133 | $400 | $600 |
| 848E50100 TEST SLAB | 1 LS | $330 | $500 | $4,740 | $2,520 | $2,250 | $2,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,404 | $8,000 | $0.01 | $10,810 | $9,500 | $10,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,000 | $8,000 | $4,723 | $3,225 | $5,000 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 844E10000 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION | 751 SF | $148 | $111k | 14% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,134 SY | $91 | $103k | 13% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 95 CY | $878 | $83k | 10% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 1,134 SY | $48 | $54k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $45,000 | $45k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.50") | 1,788 SY | $23 | $41k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $38,000 | $38k | 5% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 416 SY | $90 | $37k | 5% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 230 FT | $143 | $33k | 4% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 416 SY | $48.6 | $20k | 3% |