CUY-IR 480-06.78
CUY County · est $5.0M
Bid dateThursday, January 12—
CUY County · est $5.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 442E10311 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,302 CY | $220 | $255 | $307 | 39% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $995,000 | $529,100 | $1,044,000 | 19% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 5,300 SY | $125 | $130 | $65.00 | 13% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 221,267 SY | $2.10 | $2.99 | $2.75 | 9% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 2,100 SY | $75.00 | $90.00 | $55.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $498,803 | $200,000 | 2% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 18.34 MILE |
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 209E60201 LINEAR GRADING, AS PER PLAN | 148 STA | $25.00 | $50.00 | $175 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 5,000 LB | $2.00 | $2.50 | $2.50 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 92 CY | $200 | $225 | $300 |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 10.35 MILE | $1,350 | $1,200 | $1,225 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $5,250 |
| $6,600 |
| $5,000 |
| 2% |
| 896E00012 PORTABLE NON-INTRUSIVE TRAFFIC SENSOR, CLASS II | 60 SNMT | $1,275 | $1,275 | $1,275 | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $3,000 | $2,500 | $2,250 | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 6,650 CY | $10.00 | $19.00 | $1.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 19,914 GAL | $2.85 | $3.00 | $2.80 | 1% |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 12,388 FT | $4.50 | $3.50 | $3.00 | 1% |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $6,000 | $3,400 | $3,000 | 1% |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 15.17 MILE | $3,500 | $3,970 | $2,500 | 1% |
| 621E00100 RPM | 1,725 EACH | $29.60 | $45.00 | $29.60 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $38,000 | $25,000 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 29 EACH | $1,600 | $2,150 | $2,150 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $75.00 | $85.00 | $100 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 42 SNMT | $650 | $650 | $650 | 1% |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,771 FT | $15.00 | $9.00 | $10.00 | 1% |
| — |
| $1.25 |
| $1.00 |
| $1.50 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.35 | $1.80 | $2.25 |
| 850E20110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2.50 | $1.20 | $2.50 |
| 850E20130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $4.50 | $2.60 | $3.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,294 EACH | $4.00 | $1.00 | $3.50 |
| 646E10400 STOP LINE | 184 FT | $15.00 | $12.00 | $12.50 |
| 646E10510 CROSSWALK LINE, 12" | 379 FT | $10.00 | $5.50 | $9.00 |
| 646E10620 CHEVRON MARKING | 210 FT | $15.00 | $12.00 | $10.00 |
| 646E10800 ISLAND MARKING | 149 SF | $10.00 | $8.00 | $7.50 |
| 646E20300 LANE ARROW | 45 EACH | $200 | $169 | $225 |
| 646E20320 WRONG WAY ARROW | 6 EACH | $350 | $350 | $400 |
| 646E20350 LANE REDUCTION ARROW | 2 EACH | $450 | $450 | $300 |
| 646E20410 WORD ON PAVEMENT, 96" | 2 EACH | $500 | $200 | $350 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 6,681 FT | $3.25 | $1.95 | $2.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 11 EACH | $175 | $175 | $175 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 50 CY | $147 | $325 | $250 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $900 | $900 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 15.17 MILE | $800 | $775 | $800 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 15.17 MILE | $800 | $800 | $800 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 18.34 MILE | $1,000 | $1,000 | $1,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 18.34 MILE | $1,000 | $900 | $1,000 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 12,388 FT | $0.85 | $1.00 | $0.85 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 12,388 FT | $0.85 | $0.75 | $0.85 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 6,681 FT | $0.60 | $0.60 | $0.60 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 6,681 FT | $0.60 | $0.60 | $0.60 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 184 FT | $3.50 | $3.20 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 184 FT | $3.50 | $3.10 | $3.50 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 379 FT | $2.00 | $1.60 | $2.00 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 379 FT | $2.00 | $1.50 | $2.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 32 EACH | $75.00 | $68.00 | $75.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 32 EACH | $75.00 | $65.00 | $75.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $17.50 | $17.50 | $17.50 |
| 896E00021 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 15 SNMT | $1,000 | $1,000 | $1,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $2,500 | $2,000 | $2,800 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $18,000 | $12,500 | $19,750 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10311 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,302 CY | $220 | $2.05M | 37% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $995,000 | $995k | 18% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 5,300 SY | $125 | $663k | 12% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 221,267 SY | $2.1 | $465k | 8% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 2,100 SY | $75 | $158k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 18.34 MILE | $5,250 | $96k | 2% |
| 896E00012 PORTABLE NON-INTRUSIVE TRAFFIC SENSOR, CLASS II | 60 SNMT | $1,275 | $77k | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $3,000 | $75k | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 6,650 CY | $10 | $67k | 1% |