CUY-IR 90-18.72
CUY County · est $2.2M
Bid dateThursday, January 26—
CUY County · est $2.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Shelly Company | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 442E10311 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 4,422 CY | $270 | $230 | $275 | 50% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $225,000 | $550,000 | $429,760 | 9% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $2.00 | $1.95 | $1.90 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $180,905 | $100,000 | $100,000 | 8% |
| 442E10011 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 258 CY | $330 | $235 | $250 | 4% |
| 442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 154 CY | $375 | $225 | $175 | 2% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 26 EACH |
| Item | Quantity | R1Karvo Companies INC | R2Shelly Company | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 854 SF | $5.00 | $5.00 | $5.00 |
| 202E32000 CURB REMOVED | 447 FT | $10.00 | $10.00 | $10.00 |
| 608E10000 4" CONCRETE WALK | 355 SF | $17.00 | $17.00 | $17.00 |
| 608E52001 CURB RAMP, AS PER PLAN | 499 SF | $25.00 | $25.00 | $25.00 |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 50 FT | $215 | $175 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2,100 |
| $2,100 |
| $2,100 |
| 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $85.00 | $75.00 | $80.00 | 2% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,600 | $2,600 | $2,500 | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 3,986 CY | $10.00 | $10.50 | $0.50 | 2% |
| 621E00100 RPM | 720 EACH | $49.80 | $39.75 | $32.00 | 2% |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 8.89 MILE | $3,720 | $3,720 | $3,500 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 10,099 GAL | $3.00 | $2.50 | $2.80 | 1% |
| 622E90000 BARRIER, MISC.: PORTABLE TEMPORARY MOVABLE BARRIER | 140 FT | $200 | $97.00 | $200 | 1% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 250 SY | $95.00 | $150 | $170 | 1% |
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 4,696 SY | $5.00 | $3.65 | $1.00 | 1% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 250 SY | $92.00 | $150 | $185 | 1% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 3.28 MILE | $5,590 | $5,590 | $5,000 | 1% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 3.27 MILE | $5,590 | $5,590 | $5,000 | 1% |
| 622E90000 BARRIER, MISC.: CONCRETE BARRIER, TYPE B50 | 50 FT | $340 | $400 | $460 | 1% |
| $175 |
| 659E98700 SEEDING, MISC.:SEEDING AND MULCHING | 1 LS | $775 | $700 | $775 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $3,500 | $3,500 | $3,500 |
| 611E99151 INLET ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $2,100 | $2,100 | $2,100 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $2,500 | $2,500 | $2,500 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $3,000 | $3,000 | $3,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 4,000 LB | $1.75 | $1.75 | $1.75 |
| 407E13900 TACK COAT, 702.13 | 375 GAL | $3.00 | $6.00 | $2.00 |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 21.5 CY | $375 | $500 | $175 |
| 609E26000 CURB, TYPE 6 | 350 FT | $25.00 | $25.00 | $25.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 50 CY | $225 | $230 | $250 |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 5.03 MILE | $1,350 | $1,350 | $1,350 |
| 850E10030 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $10,000 | $10,000 | $4,800 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 1,196 FT | $2.69 | $2.70 | $2.25 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 475 EACH | $1.50 | $8.00 | $2.00 |
| 646E10400 STOP LINE | 98 FT | $15.00 | $15.00 | $12.00 |
| 646E10510 CROSSWALK LINE, 12" | 650 FT | $8.00 | $8.00 | $9.00 |
| 646E10620 CHEVRON MARKING | 125 FT | $13.00 | $13.00 | $10.00 |
| 646E10800 ISLAND MARKING, YELLOW | 140 SF | $11.00 | $11.00 | $8.00 |
| 646E20300 LANE ARROW | 3 EACH | $170 | $170 | $200 |
| 646E20320 WRONG WAY ARROW | 3 EACH | $300 | $300 | $350 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 2,541 FT | $3.70 | $3.70 | $4.00 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 1,348 FT | $1.90 | $1.90 | $2.00 |
| 807E12430 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 2,927 FT | $2.90 | $2.90 | $3.00 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,350 | $1,800 | $2,650 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 8 EACH | $175 | $175 | $150 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 25 CY | $280 | $125 | $100 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $900 | $900 | $650 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 7.84 MILE | $750 | $750 | $800 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 7.84 MILE | $690 | $690 | $800 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 5.48 MILE | $950 | $950 | $1,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5.48 MILE | $725 | $725 | $1,000 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 1,820 FT | $0.90 | $0.90 | $0.75 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,820 FT | $0.89 | $0.89 | $0.75 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 1,218 FT | $0.70 | $0.70 | $0.50 |
| 614E24208 WORK ZONE DOTTED LINE, CLASS I, 12", 642 PAINT | 2,390 FT | $0.80 | $0.80 | $0.60 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 1,218 FT | $0.70 | $0.70 | $0.50 |
| 614E24618 WORK ZONE DOTTED LINE, CLASS III, 12", 642 PAINT | 2,390 FT | $0.80 | $0.80 | $0.60 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 38 FT | $3.20 | $3.20 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 38 FT | $3.10 | $3.10 | $3.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 385 FT | $1.50 | $1.50 | $2.00 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 385 FT | $1.40 | $1.40 | $2.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $17.50 | $17.50 | $30.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 12 SNMT | $650 | $650 | $550 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $10,000 | $11,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $2,500 | $5,000 | $500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $8,500 | $5,000 | $10,000 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 2 EACH | $145 | $195 | $145 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 1,210 FT | $7.00 | $6.00 | $7.00 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 595 FT | $2.00 | $4.00 | $2.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10311 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 4,422 CY | $270 | $1.19M | 45% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $225,000 | $225k | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $2 | $215k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $180,905 | $181k | 7% |
| 442E10011 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 258 CY | $330 | $85k | 3% |
| 442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 154 CY | $375 | $58k | 2% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 26 EACH | $2,100 | $55k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $85 | $43k | 2% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,600 | $42k | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 3,986 CY | $10 | $40k | 2% |