HAM-IR 275-07.50
HAM County · est $0.3M
Bid dateThursday, January 26—
HAM County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount.
| Item | Quantity | R1Sunesis Construction CO | R2Prus Construction Company | R3Rack & Ballauer Excavating CO INC | R4John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 30" CMP | 693 FT | $64.00 | $32.00 | $70.00 | $70.71 | 23% |
| 203E10000 EXCAVATION | 4,030 CY | $8.50 | $20.00 | $12.00 | $13.61 | 18% |
| 624E10000 MOBILIZATION | 1 LS | $27,900 | $10,000 | $20,000 | $10,000 | 15% |
| 611E11200 24" CONDUIT, TYPE F, 707.33 | 132 FT | $172 | $150 | $100 | $222 | 12% |
| 659E00300 TOPSOIL | 835 CY | $17.00 | $25.00 | $38.00 | $18.63 | 7% |
| 659E10000 SEEDING AND MULCHING | 7,500 SY | $1.55 | $1.40 | $1.15 | $1.15 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,350 | $5,500 | $10,000 | $22,212 | 5% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 203E20000 EMBANKMENT | 1,420 CY | $3.15 | $7.50 | $10.00 | $12.36 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,000 | $18,500 | $15,000 | $5,470 | 2% |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 894 SY | $2.50 | $3.00 | $2.35 | $2.50 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,225 | $4,000 | $4,500 | $14,382 | 1% |
| 602E20000 CONCRETE MASONRY | 0.39 CY | $5,100 | $4,600 | $3,500 | $5,990 | 1% |
| 659E20000 COMMERCIAL FERTILIZER | 1.01 TON | $1,400 | $875 | $1,500 | $1,400 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,364 | $1,800 | $2,500 | $1,213 | 1% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 96 FT | $11.00 | $18.00 | $20.00 | $67.96 | 1% |
| 202E58500 CATCH BASIN ABANDONED | 1 EACH | $500 | $650 | $3,000 | $1,810 | 0% |
| 659E31000 LIME | 1.05 ACRE | $450 | $100 | $200 | $450 | 0% |
| 202E20010 HEADWALL REMOVED | 1 EACH | $350 | $1,100 | $680 | $2,844 | 0% |
| 659E35000 WATER | 41.5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 30" CMP | 693 FT | $64 | $44k | 23% |
| 203E10000 EXCAVATION | 4,030 CY | $8.5 | $34k | 18% |
| 624E10000 MOBILIZATION | 1 LS | $27,900 | $28k | 15% |
| 611E11200 24" CONDUIT, TYPE F, 707.33 | 132 FT | $171.5 | $23k | 12% |
| 659E00300 TOPSOIL | 835 CY | $17 | $14k | 7% |
| 659E10000 SEEDING AND MULCHING | 7,500 SY | $1.55 | $12k | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,350 | $10k | 5% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1 | $5k | 3% |
| 203E20000 EMBANKMENT | 1,420 CY | $3.15 | $4k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,000 | $4k | 2% |