JAC-SR 327-03.82
JAC County · est $0.7M
Bid dateThursday, February 9—
JAC County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1D G M INC | R2Double Z Construction Company | R3R C Construction Company And Son | R4INC Bcc Ohio INC | R5Shelly & Sands INC | R6Axis Civil Construction LLC | R7Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $13,600 | $13,000 | $20,000 | $13,166 | $13,700 | $14,300 | $15,000 | 21% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 134 FT | $480 | $457 | $470 | $497 | $500 | $474 | $457 | 12% |
| Item | Quantity | R1D G M INC | R2Double Z Construction Company | R3R C Construction Company And Son | R4INC Bcc Ohio INC | R5Shelly & Sands INC | R6Axis Civil Construction LLC | R7Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 160 SY | $12.00 | $28.00 | $30.00 | $30.42 | $24.00 | $20.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 559 FT | $1.00 | $2.00 | $5.00 | $12.75 | $5.00 | $6.00 | $2.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 143 SY | $375 | $320 | $195 | $421 | $300 | $345 | $375 | 10% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $43,000 | $62,500 | $15,000 | $46,431 | $42,800 | $45,000 | $90,000 | 8% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 49 CY | $800 | $1,400 | $950 | $1,589 | $1,600 | $1,580 | $1,900 | 8% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 9,595 LB | $3.00 | $2.00 | $3.50 | $1.91 | $1.80 | $2.80 | $1.66 | 6% |
| 253E02000 PAVEMENT REPAIR | 125 CY | $210 | $185 | $65.00 | $326 | $310 | $200 | $310 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,000 | $6,000 | $20,000 | $2,970 | $3,500 | $7,500 | $14,000 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $6,000 | $18,000 | $7,919 | $3,500 | $6,500 | $7,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $20,000 | $15,000 | $19,834 | $20,000 | $20,000 | $20,000 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 36 CY | $345 | $330 | $395 | $347 | $330 | $450 | $330 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 30 CY | $395 | $370 | $495 | $389 | $370 | $550 | $370 | 2% |
| 526E90010 TYPE A INSTALLATION | 67 FT | $170 | $210 | $195 | $221 | $225 | $220 | $260 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $11,000 | $3,000 | $3,500 | $900 | $1,500 | $2,500 | $4,000 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 437.5 FT | $23.00 | $21.60 | $27.00 | $23.10 | $23.00 | $22.00 | $21.60 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,000 | $16,000 | $4,500 | $2,869 | $2,000 | $10,000 | $12,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 370 SY | $25.00 | $23.00 | $30.00 | $18.30 | $23.00 | $20.00 | $23.00 | 2% |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,200 | $2,480 | $2,400 | $2,258 | $2,300 | $2,150 | $2,480 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $2,000 | $2,420 | $2,400 | $2,021 | $2,000 | $1,925 | $2,420 | 2% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 7 CY | $1,100 | $2,500 | $750 | $1,417 | $3,700 | $2,450 | $2,000 | 1% |
| 4 EACH |
| $250 |
| $285 |
| $1,500 |
| $1,275 |
| $500 |
| $500 |
| $429 |
| 203E10000 EXCAVATION | 43 CY | $35.00 | $35.00 | $25.00 | $22.50 | $35.00 | $40.00 | $32.00 |
| 203E20000 EMBANKMENT | 175 CY | $25.00 | $35.00 | $25.00 | $34.54 | $70.00 | $40.00 | $40.00 |
| 204E10000 SUBGRADE COMPACTION | 214 SY | $10.00 | $10.00 | $2.00 | $4.21 | $8.00 | $4.00 | $4.50 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 816 SY | $3.00 | $6.00 | $10.00 | $4.46 | $3.00 | $2.75 | $4.40 |
| 659E14000 REPAIR SEEDING AND MULCHING | 41 SY | $0.05 | $4.40 | $0.20 | $0.84 | $1.00 | $1.00 | $4.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $1,000 | $1,400 | $1,200 | $620 | $1,600 | $1,500 | $1,400 |
| 659E31000 LIME | 0.17 ACRE | $100 | $100 | $800 | $42.00 | $214 | $200 | $100 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $0.53 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 34 CY | $125 | $165 | $125 | $133 | $175 | $160 | $150 |
| 407E20000 NON-TRACKING TACK COAT | 72 GAL | $3.80 | $3.80 | $25.00 | $3.99 | $3.80 | $6.00 | $3.80 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 11 EACH | $15.00 | $10.00 | $25.00 | $10.50 | $11.00 | $10.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $10,000 | $8,450 | $15,000 | $8,873 | $8,500 | $8,450 | $8,450 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $20,000 | $16,925 | $42,000 | $17,750 | $18,000 | $16,925 | $16,925 |
| 407E20000 NON-TRACKING TACK COAT | 50 GAL | $3.80 | $3.80 | $1.00 | $3.99 | $3.80 | $6.00 | $3.80 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 25 CY | $270 | $370 | $65.00 | $389 | $370 | $300 | $370 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $70.00 | $60.00 | $35.00 | $78.75 | $85.00 | $55.00 | $85.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $10,000 | $15,000 | $8,025 | $5,000 | $5,500 | $5,500 |
| 202E22900 APPROACH SLAB REMOVED | 143 SY | $30.00 | $50.00 | $20.00 | $85.85 | $25.00 | $54.00 | $46.00 |
| 202E23500 WEARING COURSE REMOVED | 211 SY | $8.00 | $16.00 | $30.00 | $19.12 | $21.00 | $12.00 | $25.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $4,000 | $1,000 | $10,000 | $3,270 | $14,000 | $22,000 | $16,000 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 208 EACH | $30.00 | $25.00 | $25.00 | $22.50 | $38.00 | $15.00 | $16.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 54 SY | $35.00 | $36.00 | $50.00 | $35.21 | $65.00 | $48.00 | $60.00 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 67 FT | $20.00 | $25.00 | $185 | $27.38 | $45.00 | $25.00 | $23.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 13 SF | $20.00 | $25.00 | $30.00 | $29.88 | $17.00 | $16.00 | $14.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 77 FT | $47.50 | $30.00 | $30.00 | $45.38 | $34.00 | $38.00 | $42.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 32 EACH | $125 | $135 | $225 | $184 | $257 | $140 | $140 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 19 CY | $120 | $145 | $100 | $169 | $190 | $180 | $150 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 147 FT | $20.00 | $25.00 | $35.00 | $27.32 | $15.00 | $18.60 | $21.50 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 20 CY | $100 | $125 | $100 | $117 | $85.00 | $130 | $130 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $9,000 | $7,500 | $6,323 | $10,000 | $7,500 | $9,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $13,600 | $109k | 18% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 134 FT | $480 | $64k | 11% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 143 SY | $375 | $54k | 9% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $43,000 | $43k | 7% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 49 CY | $800 | $39k | 7% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 9,595 LB | $3 | $29k | 5% |
| 253E02000 PAVEMENT REPAIR | 125 CY | $210 | $26k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,000 | $22k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $16k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 3% |