JAC-SR 279-08.76 Culvert Replace
JAC County · est $0.2M
Bid dateThursday, March 9—
JAC County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Parker Corporation | R2R C Construction Company And Son INC | R3Alan Stone CO INC | R4Axis Civil Construction LLC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E13200 30" CONDUIT, TYPE A (SEE SHEET 14 FOR ALLOWABLE M | 72 FT | $350 | $375 | $417 | $475 | $185 | 17% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,000 | $7,500 | $7,200 | $8,500 | $9,000 | 12% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 50 CY | $351 | $25.00 | $350 | $170 | $350 | 12% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $321 | $25.00 | $400 | $150 | $320 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $13,000 | $10,000 | $17,000 | $15,000 | $25,475 | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) |
| Item | Quantity | R1Parker Corporation | R2R C Construction Company And Son INC | R3Alan Stone CO INC | R4Axis Civil Construction LLC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 204E10000 SUBGRADE COMPACTION | 405 SY | $0.50 | $2.00 | $3.50 | $3.00 | $1.00 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 2 CY | $65.00 | $250 | $750 | $350 | $500 |
| 659E14000 REPAIR SEEDING AND MULCHING | 42 SY | $0.05 | $0.20 | $4.50 | $3.85 | $3.85 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $2,273 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 21 CY |
| $451 |
| $295 |
| $450 |
| $420 |
| $450 |
| 7% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 20 CY | $451 | $350 | $450 | $450 | $450 | 6% |
| 203E20000 EMBANKMENT | 321 CY | $20.00 | $25.00 | $32.00 | $30.00 | $24.00 | 4% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $20,000 | $10,000 | $10,000 | $6,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $7,500 | $6,300 | $8,500 | $7,500 | 3% |
| 203E10000 EXCAVATION | 143 CY | $20.00 | $25.00 | $20.00 | $30.00 | $24.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,200 | $7,500 | $1,700 | $2,500 | $4,500 | 2% |
| 304E20000 AGGREGATE BASE | 33 CY | $65.00 | $85.00 | $74.00 | $150 | $89.00 | 1% |
| 621E00100 RPM | 4 EACH | $500 | $1,850 | $701 | $490 | $750 | 1% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 25 CY | $65.00 | $85.00 | $97.00 | $150 | $99.00 | 1% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 56 FT | $25.00 | $100 | $12.00 | $100 | $35.00 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2 INCH) | 123 SY | $8.00 | $20.00 | $13.00 | $35.00 | $80.00 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $16,000 | $32,000 | $22,000 | $25,350 | $14,953 | 1% |
| 659E10000 SEEDING AND MULCHING | 840 SY | $1.00 | $5.00 | $4.50 | $3.85 | $3.85 | 1% |
| $1,950 |
| $1,400 |
| $1,400 |
| $1,400 |
| 659E31000 LIME | 0.17 ACRE | $1,471 | $1,000 | $987 | $100 | $100 |
| 659E35000 WATER | 5 MGAL | $0.05 | $1.00 | $100 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $7,500 | $100 | $6,000 | $18,000 |
| 602E20000 CONCRETE MASONRY | 1.2 CY | $650 | $2,500 | $3,000 | $4,000 | $2,750 |
| 611E00511 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, AS PER | 40 FT | $15.00 | $50.00 | $59.00 | $50.00 | $39.00 |
| 407E10000 TACK COAT | 80 GAL | $2.50 | $10.00 | $3.50 | $4.00 | $2.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $20.00 | $50.00 | $28.00 | $50.00 | $23.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $16,000 | $45,000 | $22,000 | $38,300 | $29,957 |
| 407E10000 TACK COAT | 200 GAL | $2.50 | $1.00 | $2.00 | $2.00 | $2.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $50.00 | $25.00 | $70.00 | $50.00 | $67.00 |
| 616E10000 WATER | 5 MGAL | $0.05 | $1.00 | $1.00 | $1.00 | $25.00 |
| 619E16000 FIELD OFFICE, TYPE A | 1 MNTH | $100 | $100 | $500 | $3,000 | $650 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E13200 30" CONDUIT, TYPE A (SEE SHEET 14 FOR ALLOWABLE M | 72 FT | $350 | $25k | 17% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,000 | $18k | 12% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 50 CY | $351 | $18k | 12% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $321 | $16k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $13,000 | $13k | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 21 CY | $451 | $9k | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 20 CY | $451 | $9k | 6% |
| 203E20000 EMBANKMENT | 321 CY | $20 | $6k | 4% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1 | $5k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $5k | 3% |