FRA-SR 256-00.01
FRA County · est $0.5M
Bid dateThursday, March 9—
FRA County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3Shelly & Sands INC | R4Strawser Paving CO INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,247 CY | $241 | $290 | $238 | $320 | 49% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1.5" | 30,131 SY | $3.30 | $3.35 | $6.00 | $5.00 | 16% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $70,000 | $57,623 | $62,000 | $40,000 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $20,000 | $20,000 | $20,000 | 5% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 18 EACH | $1,500 | $1,500 | $2,000 | $1,500 | 4% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 150 SY | $110 |
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3Shelly & Sands INC | R4Strawser Paving CO INC |
|---|---|---|---|---|---|
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 200 FT | $1.00 | $1.00 | $6.00 | $1.00 |
| 659E10000 SEEDING AND MULCHING | 100 SY | $20.00 | $21.50 | $25.00 | $30.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 5 SY | $1.00 | $4.50 | $5.00 | $30.00 |
| 659E15000 INTER-SEEDING | 5 SY | $0.01 | $0.50 | $1.00 | $30.00 |
| 659E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $170 |
| $140 |
| $130 |
| 3% |
| 407E20000 NON-TRACKING TACK COAT | 4,218 GAL | $3.50 | $2.65 | $3.50 | $3.00 | 2% |
| 617E10100 COMPACTED AGGREGATE | 48 CY | $200 | $70.00 | $140 | $150 | 2% |
| 644E00300 CENTER LINE | 1.6 MILE | $4,980 | $4,980 | $5,200 | $4,980 | 1% |
| 644E00620 CROSSWALK LINE, 12" | 1,645 FT | $3.80 | $3.80 | $4.00 | $3.80 | 1% |
| 644E00100 EDGE LINE, 4" | 1.05 MILE | $4,480 | $4,480 | $4,800 | $4,480 | 1% |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 5 EACH | $885 | $700 | $1,400 | $2,000 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $920 | $700 | $1,160 | $2,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $3,000 | $3,400 | $5,500 | 1% |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 1,645 FT | $1.80 | $1.80 | $1.95 | $1.80 | 0% |
| 644E00500 STOP LINE | 384 FT | $7.40 | $7.40 | $8.00 | $7.40 | 0% |
| 659E00300 TOPSOIL | 11 CY | $245 | $20.00 | $450 | $300 | 0% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 32 HOUR | $80.00 | $115 | $107 | $110 | 0% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $2,500 | $2,000 | $2,500 | $500 | 0% |
| 209E60500 LINEAR GRADING | 1.39 MILE | $1,750 | $1,000 | $5,000 | $5,500 | 0% |
| 0.01 TON |
| $1,500 |
| $1,200 |
| $1,300 |
| $1,400 |
| 659E31000 LIME | 0.02 ACRE | $200 | $100 | $100 | $100 |
| 659E35000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN, (CATCH BASIN), 11" | 5 SY | $475 | $2,000 | $1,700 | $1,500 |
| 617E25000 WATER | 2 MGAL | $1.00 | $2.00 | $200 | $100 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $340 | $700 | $1,155 | $1,500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 286 EACH | $2.75 | $1.00 | $9.65 | $2.00 |
| 644E00200 LANE LINE, 4" | 0.85 MILE | $1,700 | $1,700 | $1,800 | $1,700 |
| 644E00400 CHANNELIZING LINE, 8" | 1,276 FT | $1.80 | $1.80 | $1.95 | $1.80 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 190 FT | $7.50 | $7.50 | $8.00 | $7.50 |
| 644E01300 LANE ARROW | 21 EACH | $95.00 | $95.00 | $100 | $95.00 |
| 644E01400 WORD ON PAVEMENT, 72" | 11 EACH | $125 | $125 | $132 | $125 |
| 644E01500 DOTTED LINE, 4" | 230 FT | $2.60 | $2.60 | $2.75 | $2.60 |
| 632E27201 LOOP DETECTOR TIE IN, AS PER PLAN | 18 EACH | $100 | $100 | $80.00 | $100 |
| 614E12460 WORK ZONE MARKING SIGN | 8 EACH | $100 | $400 | $370 | $100 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.85 MILE | $800 | $800 | $860 | $800 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.6 MILE | $1,290 | $1,290 | $1,400 | $1,290 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,276 FT | $0.80 | $0.80 | $0.90 | $0.80 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 230 FT | $1.50 | $1.50 | $1.65 | $1.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 384 FT | $3.00 | $3.00 | $3.25 | $3.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 21 EACH | $65.00 | $65.00 | $70.00 | $65.00 |
| 614E31620 WORK ZONE WORD ON PAVEMENT, 72", CLASS III, 642 PA | 11 EACH | $85.00 | $85.00 | $91.00 | $85.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,247 CY | $241 | $301k | 47% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1.5" | 30,131 SY | $3.3 | $99k | 16% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $70,000 | $70k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 5% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 18 EACH | $1,500 | $27k | 4% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 150 SY | $110 | $17k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 4,218 GAL | $3.5 | $15k | 2% |
| 617E10100 COMPACTED AGGREGATE | 48 CY | $200 | $10k | 1% |
| 644E00300 CENTER LINE | 1.6 MILE | $4,980 | $8k | 1% |
| 644E00620 CROSSWALK LINE, 12" | 1,645 FT | $3.8 | $6k | 1% |