TUS-SR 39-19.94, TUS-SR 212-05.11
TUS County · est $3.0M
Bid dateThursday, March 9—
TUS County · est $3.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 12 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Superior Paving & Materials INC | R3Shelly Company | R4Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 5,366 CY | $150 | $183 | $185 | $192 | 33% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (4183 CY | $166 | $162 | $170 | $170 | 28% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (2.25) | 152,857 SY | $1.30 | $1.80 | $1.75 | $2.50 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $109,500 | $162,000 | $165,000 | 5% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 200 CY | $400 | $275 | $415 | $375 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $74,300 | $100,000 | $100,000 | $40,000 |
| Item | Quantity | R1Karvo Companies INC | R2Superior Paving & Materials INC | R3Shelly Company | R4Shelly & Sands INC |
|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 40 FT | $25.00 | $15.00 | $5.00 | $10.00 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 7.69 MILE | $850 | $850 | $850 | $850 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,128 EACH | $1.00 | $6.50 | $5.30 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 3% |
| 646E10010 EDGE LINE, 6" | 18.54 MILE | $3,150 | $3,150 | $3,150 | $4,000 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 740 CY | $70.00 | $40.00 | $65.00 | $72.50 | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 8,519 GAL | $5.50 | $4.30 | $3.50 | $4.75 | 2% |
| 621E00100 RPM | 1,128 EACH | $39.83 | $36.25 | $35.00 | $35.00 | 2% |
| 646E10200 CENTER LINE | 9.27 MILE | $4,000 | $4,000 | $4,000 | $5,000 | 2% |
| 253E02000 PAVEMENT REPAIR | 80 CY | $420 | $310 | $425 | $400 | 1% |
| 407E10000 TACK COAT | 11,797 GAL | $2.75 | $3.00 | $2.50 | $2.40 | 1% |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $400 | $260 | $500 | $400 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 27.81 MILE | $1,100 | $1,100 | $1,100 | $1,150 | 1% |
| 202E23500 WEARING COURSE REMOVED | 2,336 SY | $12.00 | $6.00 | $2.15 | $7.00 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 7.69 MILE | $3,528 | $3,450 | $6,800 | $8,000 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 9,277 GAL | $2.75 | $4.00 | $2.50 | $3.30 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 13.24 MILE | $1,252 | $900 | $2,000 | $1,500 | 1% |
| 617E20000 SHOULDER PREPARATION | 21,295 SY | $0.70 | $0.11 | $0.25 | $0.20 | 1% |
| $5.25 |
| 642E00500 STOP LINE, TYPE 1 | 20 FT | $10.00 | $10.00 | $10.00 | $6.25 |
| 642E01200 PARKING LOT STALL MARKING, TYPE 1 | 140 FT | $5.00 | $5.00 | $5.00 | $2.55 |
| 642E01702 HANDICAP SYMBOL MARKING, TYPE 1 | 1 EACH | $100 | $100 | $100 | $120 |
| 646E10520 CROSSWALK LINE, 24" | 144 FT | $15.00 | $15.00 | $15.00 | $13.75 |
| 614E12460 WORK ZONE MARKING SIGN | 79 EACH | $70.00 | $70.00 | $70.00 | $96.50 |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 27.81 MILE | $300 | $300 | $300 | $250 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 60 FT | $5.00 | $5.00 | $5.00 | $14.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,500 | $13,000 | $15,000 | $12,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 5,366 CY | $150 | $805k | 32% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (4183 CY | $166 | $694k | 28% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (2.25) | 152,857 SY | $1.3 | $199k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $125k | 5% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 200 CY | $400 | $80k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $74,300 | $74k | 3% |
| 646E10010 EDGE LINE, 6" | 18.54 MILE | $3,150 | $58k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 740 CY | $70 | $52k | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 8,519 GAL | $5.5 | $47k | 2% |
| 621E00100 RPM | 1,128 EACH | $39.83 | $45k | 2% |