| Item | Quantity | R1Ruhlin-great Lakes Sr 8 -joint Venture | R2Kokosing Construction Company INC | R3Kenmore Construction CO INC | R4Walsh Construction Company II LLC | R5American Bridge Company | % of bid |
|---|---|---|---|---|---|---|---|
| 513E10401 STRUCTURAL STEEL MEMBERS, HYBRID GIRDER, LEVEL SIX | 8,253,152 LB | $2.80 | $2.73 | $2.65 | $3.28 | $4.20 | 22% |
| 513E10401 STRUCTURAL STEEL MEMBERS, HYBRID GIRDER, LEVEL SIX | 7,779,001 LB | $2.60 | $2.73 | $2.68 | $2.95 | $4.00 | 19% |
| 513E95020 STRUCTURAL STEEL, MISC.: STRUCTURAL STEEL ERECTION | 1 LS | $7,000,000 | $13,097,101 | $10,000,000 | $6,000,000 | $15,720,000 | 7% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,016,127 LB | $2.15 | $2.30 | $2.00 | $1.84 | $1.80 | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,006,458 LB | $2.15 | $2.30 | $2.00 | $1.78 | $1.85 | 6% |
| Item | Quantity | R1Ruhlin-great Lakes Sr 8 -joint Venture | R2Kokosing Construction Company INC | R3Kenmore Construction CO INC | R4Walsh Construction Company II LLC | R5American Bridge Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $800,000 | $275,000 | $1,500,000 | $1,000,000 | $50,500 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $175 | $450 | $500 | $1,900 | $187 |
| 202E23000 PAVEMENT REMOVED | 43,392 SY | $15.00 | $14.00 | $18.00 | $17.00 | $10.20 |
| 202E30000 WALK REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4,999 CY |
| $935 |
| $1,000 |
| $1,200 |
| $1,400 |
| $1,800 |
| 4% |
| 511E45603 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA, | 4,854 CY | $900 | $1,000 | $1,200 | $1,072 | $1,700 | 4% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 4,432 CY | $905 | $1,000 | $1,160 | $1,700 | $950 | 4% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $4,000,000 | $3,100,000 | $5,700,000 | $4,300,000 | $7,000,000 | 4% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 4,368 CY | $900 | $1,000 | $1,160 | $1,500 | $942 | 4% |
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 79,560 SF | $45.00 | $44.00 | $45.00 | $58.68 | $72.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $3,200,000 | $2,000,000 | $4,000,000 | $4,000,000 | $4,400,000 | 3% |
| 625E98000 LIGHTING, MISC.:SERVICE TO AESTHETIC LIGHTING | 12 EACH | $155,000 | $75,000 | $20,000 | $155,563 | $158,652 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,804,000 | $1,444,584 | $1,250,000 | $1,618,277 | $2,280,000 | 2% |
| 511E42012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 1,570 CY | $1,130 | $1,500 | $1,440 | $1,400 | $1,900 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 9,713 CY | $173 | $245 | $168 | $174 | $262 | 2% |
| 511E42012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 1,649 CY | $1,000 | $1,500 | $1,440 | $1,200 | $1,819 | 2% |
| 530E00200 SPECIAL - STRUCTURES, MISC.: LIGHTING, BRIDGES, AB | 1 LS | $1,492,000 | $1,400,000 | $2,100,000 | $1,313,758 | $1,471,880 | 1% |
| 530E00200 SPECIAL - STRUCTURES MISC: LIGHTING ? BRIDGES, ABU | 1 LS | $1,460,000 | $1,369,000 | $2,000,000 | $1,288,667 | $1,350,000 | 1% |
| 512E10051 SEALING OF CONCRETE SURFACES (NON-EPOXY), AS PER P | 7,341 SY | $155 | $74.00 | $94.43 | $80.04 | $77.40 | 1% |
| 378 SF |
| $2.00 |
| $3.00 |
| $3.00 |
| $31.00 |
| $7.60 |
| 202E30600 CONCRETE MEDIAN REMOVED | 56 SY | $35.00 | $20.00 | $20.00 | $65.00 | $30.50 |
| 202E30700 CONCRETE BARRIER REMOVED | 3,410 FT | $25.00 | $60.00 | $12.00 | $18.00 | $12.50 |
| 202E32000 CURB REMOVED | 2,169 FT | $2.00 | $0.50 | $5.00 | $4.00 | $6.10 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 3,433 FT | $35.00 | $40.00 | $35.00 | $41.00 | $17.30 |
| 202E35200 PIPE REMOVED, OVER 24" | 149 FT | $50.00 | $80.00 | $60.00 | $135 | $57.50 |
| 202E38000 GUARDRAIL REMOVED | 4,274 FT | $2.80 | $2.80 | $2.50 | $2.83 | $2.85 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH | $200 | $200 | $125 | $202 | $202 |
| 202E58000 MANHOLE REMOVED | 31 EACH | $700 | $950 | $500 | $1,500 | $1,165 |
| 202E58100 CATCH BASIN REMOVED | 26 EACH | $500 | $600 | $340 | $1,200 | $592 |
| 202E58200 INLET REMOVED | 5 EACH | $675 | $500 | $400 | $1,500 | $592 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 854 FT | $20.00 | $11.00 | $10.00 | $17.00 | $23.80 |
| 202E75000 FENCE REMOVED | 6,535 FT | $5.50 | $5.50 | $3.00 | $5.56 | $5.65 |
| 202E75254 GATE REMOVED FOR REUSE | 1 EACH | $275 | $275 | $200 | $278 | $283 |
| 202E75266 VANDAL PROTECTION FENCE REMOVED AND RESET | 579 FT | $50.00 | $50.00 | $42.00 | $50.51 | $51.50 |
| 202E98000 REMOVAL MISC.: PIPE ABANDONED - 8-INCH, CITY OF AK | 1 LS | $3,500 | $4,000 | $2,500 | $6,957 | $4,407 |
| 202E98000 REMOVAL MISC.:8-INCH WATERLINE AND GATE VALVE REMO | 1 LS | $2,000 | $2,000 | $500 | $7,200 | $463 |
| 202E98000 REMOVAL MISC.:PIPE ABANDONED - 6-INCH, CITY OF AKR | 1 LS | $6,000 | $2,000 | $3,000 | $2,876 | $46,340 |
| 202E98100 REMOVAL MISC.: MANHOLE REMOVED, CITY OF AKRON | 2 EACH | $600 | $800 | $500 | $2,441 | $1,098 |
| 202E98100 REMOVAL MISC.:IRE HYDRANT AND 6-INCH GATE VALVE AS | 4 EACH | $3,500 | $1,700 | $550 | $3,200 | $1,480 |
| 202E98200 REMOVAL MISC.: PIPE REMOVED - 6-INCH, CITY OF AKRO | 666 FT | $27.00 | $21.00 | $10.00 | $33.02 | $18.10 |
| 202E98200 REMOVAL MISC.: PIPE REMOVED - 8-INCH, CITY OF AKRO | 487 FT | $12.00 | $7.50 | $20.00 | $19.00 | $19.20 |
| 202E98400 REMOVAL MISC.: RETAINING WALL REMOVED | 220 SF | $10.00 | $5.00 | $10.00 | $65.99 | $210 |
| 203E10000 EXCAVATION | 53,427 CY | $21.00 | $13.00 | $22.00 | $19.00 | $24.10 |
| 203E20000 EMBANKMENT | 52,554 CY | $15.00 | $16.00 | $18.00 | $6.00 | $16.30 |
| 203E20001 EMBANKMENT, AS PER PLAN | 14,646 CY | $20.00 | $16.00 | $25.00 | $7.00 | $28.20 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 150 CY | $120 | $170 | $70.00 | $79.00 | $104 |
| 204E10000 SUBGRADE COMPACTION | 55,977 SY | $2.50 | $1.50 | $2.00 | $2.62 | $0.80 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,149 CY | $55.00 | $25.00 | $24.00 | $30.00 | $32.40 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,149 CY | $85.00 | $70.00 | $70.00 | $47.00 | $89.80 |
| 204E45000 PROOF ROLLING | 30 HOUR | $500 | $200 | $150 | $240 | $280 |
| 204E50000 GEOTEXTILE FABRIC | 1,723 SY | $1.00 | $1.75 | $3.00 | $2.25 | $2.05 |
| 204E51000 GEOGRID | 1,723 SY | $3.00 | $2.25 | $4.00 | $3.12 | $1.05 |
| 606E15050 GUARDRAIL, TYPE MGS | 3,988 FT | $26.00 | $26.00 | $25.00 | $26.26 | $26.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E MASH | 5 EACH | $2,750 | $2,750 | $3,000 | $2,778 | $2,800 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE EMASH | 1 EACH | $2,750 | $2,750 | $3,000 | $2,778 | $2,800 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 8 EACH | $1,400 | $1,400 | $1,500 | $1,414 | $1,425 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 7 EACH | $2,750 | $2,750 | $2,800 | $2,778 | $2,800 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 3 EACH | $500 | $500 | $600 | $505 | $510 |
| 607E23000 FENCE, TYPE CLT | 2,812 FT | $36.00 | $36.00 | $23.00 | $36.36 | $37.10 |
| 607E23001 FENCE, TYPE CLT, AS PER PLAN | 240 FT | $42.00 | $42.00 | $30.00 | $42.42 | $43.30 |
| 607E61200 GATE, TYPE CLT | 1 EACH | $3,000 | $3,000 | $1,700 | $3,030 | $3,091 |
| 607E98000 FENCE, MISC.:BIKE PATH RAILING | 717 FT | $55.00 | $56.62 | $40.00 | $55.56 | $56.70 |
| 608E10000 4" CONCRETE WALK | 4,463 SF | $12.00 | $7.00 | $8.00 | $7.00 | $7.30 |
| 608E30000 AGGREGATE WALK | 3,254 SF | $3.50 | $1.50 | $4.00 | $5.00 | $2.05 |
| 608E52000 CURB RAMP | 444 SF | $21.00 | $9.00 | $22.00 | $16.00 | $19.30 |
| 608E53020 DETECTABLE WARNING | 73 SF | $35.00 | $20.00 | $40.00 | $35.00 | $53.80 |
| 622E10140 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1 | 1,501 FT | $150 | $150 | $148 | $120 | $152 |
| 622E10141 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1, AS PER PL | 68 FT | $300 | $350 | $620 | $470 | $152 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 1,213 FT | $80.00 | $80.00 | $112 | $90.00 | $101 |
| 622E10200 BARRIER TRANSITION | 3 EACH | $12,000 | $6,000 | $12,000 | $20,000 | $6,120 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 5 EACH | $3,900 | $3,400 | $5,000 | $4,400 | $4,080 |
| 622E25014 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 36 EACH | $4,250 | $4,000 | $6,000 | $9,200 | $4,080 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 8 EACH | $3,000 | $2,400 | $5,800 | $5,800 | $4,080 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 15 EACH | $115 | $350 | $900 | $226 | $742 |
| 690E98000 SPECIAL - MISC.: VERTICAL CLEARANCE | 1 EACH | $750 | $1.00 | $5,000 | $5,000 | $2,136 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $5,000 | $1.00 | $20,000 | $10,000 | $27,840 |
| 690E98400 SPECIAL - CONSTRUCTION ACCESS ROAD 1 | 1 LS | $260,000 | $350,000 | $525,000 | $500,000 | $365,000 |
| 690E98400 SPECIAL - CONSTRUCTION ACCESS ROAD 2A | 1 LS | $550,000 | $1,000,000 | $550,000 | $0.01 | $1,700,000 |
| 690E98400 SPECIAL - CONSTRUCTION ACCESS ROAD 3A | 1 LS | $335,000 | $300,000 | $625,000 | $200,000 | $625,000 |
| 690E98400 SPECIAL - CONSTRUCTION ACCESS ROAD 5A | 1 LS | $1,005,000 | $1,000,000 | $350,000 | $2,000,000 | $1,250,000 |
| 690E98400 SPECIAL - CONSTRUCTION ACCESS ROAD 6A | 1 LS | $130,000 | $1.00 | $410,000 | $0.01 | $1,205,000 |
| 690E98400 SPECIAL - CONSTRUCTION ACCESS ROAD 6B | 1 LS | $205,000 | $400,000 | $345,000 | $1,500,000 | $1,150,000 |
| 690E98400 SPECIAL - CONSTRUCTION ACCESS ROAD 8 | 1 LS | $735,000 | $750,000 | $360,000 | $450,000 | $935,000 |
| 690E98400 SPECIAL - CONSTRUCTION VIDEO MONITORING | 1 LS | $200,000 | $125,000 | $400,000 | $195,763 | $290,000 |
| 690E98400 SPECIAL - REMOVAL OF ELECTRICAL PLUGS | 1 LS | $2,900 | $8,000 | $1,000 | $2,509 | $5,100 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $200,000 | $162,000 | $50,000 | $100,000 | $15,300 |
| 607E98000 FENCE, MISC.:, CONSTRUCTION FENCING (PLASTIC/NYLON | 900 FT | $7.00 | $6.00 | $7.00 | $50.00 | $8.15 |
| 202E98100 REMOVAL MISC.: UTILITY POLE AND PEDESTAL | 1 EACH | $500 | $5,000 | $2,000 | $5,000 | $2,050 |
| 601E11000 RIPRAP, TYPE D | 1,182 SY | $75.00 | $78.00 | $84.00 | $65.00 | $230 |
| 601E12000 RIPRAP, WITH GROUT | 34 SY | $175 | $150 | $155 | $150 | $306 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 875 CY | $100 | $90.00 | $95.00 | $70.00 | $230 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 6 CY | $350 | $225 | $260 | $345 | $352 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $350 | $150 | $25.00 | $150 | $56.50 |
| 659E00300 TOPSOIL | 4,255 CY | $45.00 | $12.00 | $40.00 | $35.00 | $20.40 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 38,332 SY | $1.07 | $1.15 | $1.40 | $1.50 | $2.90 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,917 SY | $1.25 | $1.15 | $1.40 | $1.50 | $2.25 |
| 659E15000 INTER-SEEDING | 1,917 SY | $1.25 | $1.15 | $1.00 | $1.50 | $1.70 |
| 659E20000 COMMERCIAL FERTILIZER | 5.35 TON | $1,300 | $1,400 | $300 | $760 | $1,133 |
| 659E31000 LIME | 7.92 ACRE | $0.01 | $140 | $25.00 | $50.00 | $227 |
| 659E35000 WATER | 217 MGAL | $0.01 | $1.00 | $0.01 | $15.00 | $113 |
| 659E40000 MOWING | 87 MSF | $5.00 | $40.00 | $5.00 | $30.77 | $34.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 2,936 SY | $3.10 | $2.50 | $1.50 | $3.50 | $4.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,975 | $2,000 | $2,000 | $1,975 | $20,400 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $48,000 | $57,000 | $62,000 | $54,400 | $102,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $36,580 | $48,000 | $41,237 | $12,000 | $20,400 |
| 832E30000 EROSION CONTROL | 142,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 178 SY | $10.00 | $8.00 | $5.00 | $4.00 | $13.50 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 298 SY | $10.00 | $8.00 | $5.00 | $5.50 | $13.50 |
| 602E20000 CONCRETE MASONRY | 2 CY | $4,000 | $2,200 | $2,800 | $4,500 | $4,993 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 8,112 FT | $18.00 | $14.00 | $12.00 | $19.15 | $18.40 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 645 FT | $37.00 | $23.00 | $15.00 | $17.00 | $25.50 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 10,104 FT | $17.00 | $11.00 | $11.00 | $17.90 | $20.40 |
| 605E31100 AGGREGATE DRAINS | 41 FT | $10.00 | $14.00 | $24.00 | $59.00 | $30.60 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 734 FT | $50.00 | $25.00 | $25.00 | $65.00 | $25.50 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $22.00 | $22.00 | $20.00 | $146 | $15.30 |
| 611E02000 8" CONDUIT, TYPE C | 36 FT | $98.00 | $55.00 | $40.00 | $201 | $72.00 |
| 611E02600 8" CONDUIT, TYPE F | 122 FT | $79.00 | $54.00 | $32.00 | $82.00 | $47.60 |
| 611E04400 12" CONDUIT, TYPE B | 10 FT | $715 | $100 | $164 | $325 | $367 |
| 611E04600 12" CONDUIT, TYPE C | 212 FT | $158 | $82.00 | $100 | $91.00 | $128 |
| 611E05900 15" CONDUIT, TYPE B | 770 FT | $126 | $115 | $130 | $80.00 | $142 |
| 611E06100 15" CONDUIT, TYPE C | 689 FT | $114 | $90.00 | $112 | $77.00 | $134 |
| 611E06700 15" CONDUIT, TYPE F | 98 FT | $134 | $125 | $155 | $149 | $260 |
| 611E07400 18" CONDUIT, TYPE B | 67 FT | $201 | $225 | $160 | $670 | $178 |
| 611E07600 18" CONDUIT, TYPE C | 1,031 FT | $145 | $112 | $157 | $115 | $141 |
| 611E09100 21" CONDUIT, TYPE C | 241 FT | $158 | $131 | $140 | $102 | $157 |
| 611E10400 24" CONDUIT, TYPE B | 295 FT | $206 | $150 | $190 | $275 | $206 |
| 611E10600 24" CONDUIT, TYPE C | 428 FT | $187 | $138 | $145 | $135 | $160 |
| 611E11200 24" CONDUIT, TYPE F | 53 FT | $200 | $175 | $175 | $156 | $241 |
| 611E16400 36" CONDUIT, TYPE B | 814 FT | $200 | $267 | $285 | $350 | $290 |
| 611E16600 36" CONDUIT, TYPE C | 240 FT | $350 | $235 | $210 | $225 | $470 |
| 611E19600 42" CONDUIT, TYPE C | 240 FT | $500 | $307 | $252 | $300 | $317 |
| 611E97400 CONDUIT, MISC.: 36" CONDUIT UNDER RAILROAD | 63 FT | $700 | $400 | $240 | $850 | $1,005 |
| 611E97400 CONDUIT, MISC.: 4-INCH STORM LATERAL, CITY OF AKRO | 16 FT | $66.00 | $39.00 | $70.00 | $480 | $152 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $5,500 | $5,300 | $4,500 | $7,300 | $7,919 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 5 EACH | $5,600 | $5,300 | $4,500 | $7,200 | $7,920 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 4 EACH | $5,300 | $5,100 | $4,000 | $7,600 | $7,634 |
| 611E98410 CATCH BASIN, NO. 8 | 16 EACH | $5,900 | $5,900 | $4,200 | $6,900 | $9,354 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,700 | $2,900 | $2,700 | $7,800 | $6,112 |
| 611E99110 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C1 | 5 EACH | $17,500 | $13,000 | $18,900 | $18,000 | $8,285 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 2 EACH | $10,500 | $11,200 | $14,700 | $16,650 | $8,746 |
| 611E99115 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D, AS | 1 EACH | $10,500 | $13,500 | $15,600 | $18,000 | $8,746 |
| 611E99574 MANHOLE, NO. 3 | 27 EACH | $9,100 | $9,000 | $5,000 | $12,000 | $9,854 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 4 EACH | $4,000 | $3,500 | $2,500 | $1,200 | $3,926 |
| 611E96600 CONDUIT, BORED OR JACKED 36" | 142 FT | $1,750 | $3,000 | $1,800 | $2,300 | $1,035 |
| 611E98434 CATCH BASIN, NO. 8A | 1 EACH | $15,500 | $12,500 | $5,300 | $9,700 | $9,354 |
| 611E96600 CONDUIT, BORED OR JACKED, 18? | 131 FT | $850 | $470 | $1,250 | $665 | $510 |
| 611E96600 CONDUIT, BORED OR JACKED, 15? | 206 FT | $750 | $440 | $1,260 | $708 | $450 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 2,850 FT | $2.00 | $1.53 | $2.00 | $4.39 | $4.10 |
| 253E01000 PAVEMENT REPAIR | 1,942 SY | $325 | $250 | $105 | $318 | $308 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH | 23,429 SY | $4.20 | $8.00 | $3.00 | $5.75 | $6.65 |
| 304E20000 AGGREGATE BASE | 9,631 CY | $85.00 | $90.00 | $70.00 | $85.00 | $51.00 |
| 407E20000 NON-TRACKING TACK COAT | 8,623 GAL | $3.50 | $4.00 | $5.00 | $3.52 | $3.60 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 747 CY | $285 | $360 | $275 | $286 | $367 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 359 CY | $325 | $415 | $200 | $327 | $456 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $560 | $510 | $1,000 | $563 | $436 |
| 441E70600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (8 CY | $450 | $420 | $1,000 | $452 | $411 |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (159 CY | $575 | $725 | $400 | $762 | $544 |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,837 CY | $320 | $455 | $295 | $322 | $466 |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,342 CY | $245 | $345 | $265 | $246 | $313 |
| 452E16010 13" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 7,303 SY | $125 | $100 | $120 | $140 | $75.00 |
| 609E24510 CURB, TYPE 4-C | 799 FT | $25.00 | $27.00 | $35.00 | $35.00 | $66.00 |
| 609E26000 CURB, TYPE 6 | 1,487 FT | $35.00 | $36.00 | $29.00 | $30.00 | $66.00 |
| 609E50000 4" CONCRETE TRAFFIC ISLAND | 218 SY | $50.00 | $57.00 | $64.00 | $70.00 | $93.20 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 6,832 FT | $2.11 | $1.04 | $2.00 | $1.50 | $20.50 |
| 638E20088 SPECIAL - 8" WATER MAIN DIP CLASS 53 MECHANICAL JO | 36 FT | $400 | $250 | $270 | $369 | $622 |
| 638E20176 SPECIAL - 12" WATER MAIN DIP CLASS 53 MECHANICAL J | 324 FT | $300 | $275 | $240 | $190 | $246 |
| 638E20554 SPECIAL - 8" GATE VALVE WITH VALVE BOX, CITY OF AK | 1 EACH | $2,700 | $2,900 | $7,500 | $1,800 | $3,225 |
| 638E20770 SPECIAL - 1" COPPER WATER SERVICE LINE, CITY OF AK | 358 FT | $65.00 | $37.00 | $55.00 | $147 | $43.50 |
| 638E98000 WATER WORK, MISC.: FIRE HYDRANT AND 6-INCH GATE VA | 3 EACH | $13,000 | $10,000 | $10,500 | $8,200 | $10,514 |
| 638E98000 WATER WORK, MISC.: TYING INTO 10-INCH MAIN, CITY O | 2 EACH | $2,800 | $2,500 | $2,500 | $6,445 | $2,752 |
| 638E98000 WATER WORK, MISC.: TYING INTO 6-INCH MAIN, CITY OF | 1 EACH | $3,100 | $1,100 | $2,000 | $5,300 | $1,660 |
| 638E98100 WATER WORK, MISC.: HOT BOX ENCLOSURE ASSEMBLY, | 1 LS | $15,000 | $9,000 | $18,000 | $48,000 | $19,880 |
| 638E98100 WATER WORK, MISC.:RINKING FOUNTAIN, COMPLETE, CITY | 1 LS | $7,700 | $7,500 | $8,000 | $10,300 | $8,073 |
| 611E97400 CONDUIT, MISC.:8-INCH SANITARY SEWER, CITY OF AKRO | 466 FT | $230 | $210 | $220 | $175 | $164 |
| 611E97400 CONDUIT, MISC.:RECONNECT LATERAL, CITY OF AKRON | 275 FT | $188 | $210 | $175 | $142 | $118 |
| 611E99690 MANHOLE, MISC.:ANHOLE-2A ON 8" SANITARY SEWER, CIT | 2 EACH | $7,900 | $7,000 | $6,500 | $8,200 | $7,996 |
| 625E00450 CONNECTION, FUSED PULL APART | 140 EACH | $110 | $170 | $180 | $110 | $113 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 10 EACH | $110 | $170 | $180 | $110 | $113 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 85 EACH | $110 | $130 | $200 | $110 | $113 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B40 | 3 EACH | $3,500 | $3,900 | $5,100 | $3,513 | $3,582 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B40 | 2 EACH | $3,700 | $4,200 | $5,200 | $3,713 | $3,787 |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, A10B40 | 22 EACH | $4,600 | $4,800 | $5,200 | $4,617 | $4,708 |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, A10BB40 | 13 EACH | $5,200 | $5,500 | $7,000 | $5,219 | $5,323 |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, AT10B40 | 30 EACH | $4,000 | $4,400 | $5,000 | $4,015 | $4,094 |
| 625E10503 LIGHT POLE (INSTALLATION ONLY), AS PER PLAN | 2 EACH | $600 | $1,200 | $1,300 | $602 | $614 |
| 625E10614 LIGHT POLE ANCHOR BOLTS ON STRUCTURE | 88 EACH | $44.00 | $200 | $250 | $44.16 | $45.00 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 35 EACH | $2,050 | $3,000 | $2,800 | $2,057 | $2,098 |
| 625E14306 MEDIAN LIGHT POLE FOUNDATION, 10' DEEP | 12 EACH | $8,500 | $7,000 | $4,100 | $4,617 | $4,708 |
| 625E14307 MEDIAN LIGHT POLE FOUNDATION, 10' DEEP, AS PER PLA | 3 EACH | $13,000 | $11,000 | $7,900 | $9,836 | $10,031 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 31,260 FT | $3.30 | $3.80 | $4.00 | $3.31 | $3.40 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 5,397 FT | $4.00 | $5.00 | $6.00 | $4.01 | $4.10 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 5,595 FT | $3.00 | $3.00 | $4.00 | $3.01 | $3.05 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 11,520 FT | $2.00 | $1.80 | $2.50 | $2.01 | $2.05 |
| 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 726 FT | $10.50 | $27.00 | $12.00 | $10.54 | $10.80 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 4,532 FT | $14.00 | $13.00 | $14.50 | $14.05 | $14.30 |
| 625E25400 CONDUIT, 2", 725.04 | 13,913 FT | $23.00 | $33.00 | $23.90 | $23.08 | $23.50 |
| 625E25500 CONDUIT, 3", 725.04 | 742 FT | $29.00 | $62.00 | $45.00 | $29.11 | $29.70 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 231 FT | $54.00 | $57.00 | $90.00 | $54.20 | $55.30 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 222 FT | $1.00 | $5.00 | $5.70 | $1.00 | $1.05 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $850 | $1,700 | $1,125 | $853 | $870 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 3 EACH | $850 | $1,700 | $1,125 | $853 | $870 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 78 EACH | $850 | $1,700 | $1,125 | $853 | $870 |
| 625E27561 LUMINAIRE, INSTALLATION ONLY, AS PER PLAN | 2 EACH | $100 | $150 | $250 | $100 | $102 |
| 625E29002 TRENCH, 24" DEEP | 5,930 FT | $15.00 | $8.00 | $10.00 | $15.05 | $7.90 |
| 625E29900 JUNCTION BOX | 73 EACH | $2,600 | $2,800 | $2,000 | $2,609 | $2,661 |
| 625E29930 MEDIAN JUNCTION BOX | 3 EACH | $2,600 | $3,000 | $3,200 | $2,609 | $2,661 |
| 625E30700 PULL BOX, 725.08, 18" | 22 EACH | $1,100 | $2,000 | $1,400 | $1,104 | $1,126 |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $1,400 | $2,400 | $1,600 | $1,405 | $1,433 |
| 625E32000 GROUND ROD | 50 EACH | $300 | $330 | $315 | $301 | $307 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 2 EACH | $18,500 | $9,000 | $17,200 | $18,567 | $18,936 |
| 625E34001 POWER SERVICE, AS PER PLAN | 3 EACH | $9,600 | $30,000 | $7,400 | $9,635 | $9,826 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 5,930 FT | $3.00 | $1.90 | $0.50 | $3.01 | $3.05 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $111,000 | $400,000 | $175,000 | $111,403 | $113,616 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 5 EACH | $600 | $5,600 | $9,800 | $602 | $614 |
| 625E75400 LIGHT POLE REMOVED | 57 EACH | $400 | $390 | $850 | $401 | $410 |
| 625E75410 LIGHT POLE REMOVED FOR REUSE | 2 EACH | $400 | $310 | $900 | $401 | $410 |
| 625E75506 LUMINAIRE REMOVED | 57 EACH | $30.00 | $50.00 | $220 | $30.11 | $30.70 |
| 625E75508 LUMINAIRE REMOVED FOR REUSE | 2 EACH | $30.00 | $70.00 | $220 | $30.11 | $30.70 |
| 625E75510 POWER SERVICE REMOVED | 2 EACH | $700 | $2,000 | $1,310 | $703 | $716 |
| 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED | 38 EACH | $260 | $300 | $615 | $261 | $266 |
| 625E75800 DISCONNECT CIRCUIT | 4 EACH | $80.00 | $500 | $540 | $80.29 | $81.90 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'BE') | 1 EACH | $2,400 | $600 | $2,780 | $2,409 | $2,457 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'BW') | 1 EACH | $2,400 | $600 | $2,780 | $2,409 | $2,457 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'SB') | 1 EACH | $2,400 | $600 | $2,780 | $2,409 | $2,457 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'X') | 1 EACH | $2,400 | $600 | $2,780 | $2,409 | $2,457 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'Y') | 1 EACH | $2,400 | $600 | $2,780 | $2,409 | $2,457 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'Z') | 1 EACH | $2,400 | $600 | $2,780 | $2,409 | $2,457 |
| 625E98000 LIGHTING, MISC.:POWER SERVICE, 240 VOLT | 3 EACH | $11,000 | $15,000 | $10,500 | $11,040 | $11,259 |
| 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C | 520 FT | $15.50 | $64.39 | $17.00 | $15.56 | $15.90 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 548 FT | $8.00 | $9.69 | $10.00 | $8.03 | $8.20 |
| 621E00100 RPM | 281 EACH | $55.55 | $55.55 | $70.00 | $55.55 | $56.70 |
| 625E32000 GROUND ROD | 5 EACH | $300 | $350 | $300 | $250 | $302 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 203.3 FT | $7.95 | $17.00 | $14.00 | $17.17 | $17.30 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 319.3 FT | $8.35 | $18.50 | $15.00 | $18.69 | $18.90 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 92 FT | $10.25 | $20.00 | $19.00 | $20.20 | $20.50 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 70.9 FT | $37.25 | $27.00 | $40.00 | $27.27 | $27.50 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 40.4 FT | $39.65 | $28.50 | $40.00 | $28.79 | $29.10 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 37.3 FT | $42.65 | $38.50 | $47.00 | $38.89 | $39.30 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 119.1 FT | $93.00 | $82.00 | $100 | $82.83 | $83.60 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 30 FT | $10.15 | $20.00 | $16.00 | $20.20 | $20.50 |
| 630E08600 SIGN POST REFLECTOR | 12 EACH | $18.95 | $45.00 | $45.00 | $45.45 | $46.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 12 EACH | $745 | $775 | $825 | $783 | $790 |
| 630E09102 SURFACE PREPARATION, NEW SUPPORT SECTION | 12 EACH | $2,750 | $2,750 | $2,600 | $2,778 | $2,800 |
| 630E09106 COATING, EPOXY INTERMEDIATE COAT, SUPPORT SECTION | 12 EACH | $2,750 | $2,750 | $2,600 | $2,778 | $2,800 |
| 630E09108 COATING, URETHANE TOP COAT, SUPPORT SECTION | 12 EACH | $2,750 | $2,750 | $2,600 | $2,778 | $2,800 |
| 630E09120 COATING, ORGANIC ZINC PRIME COAT, SUPPORT SECTION | 12 EACH | $2,750 | $2,750 | $2,600 | $2,778 | $2,800 |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 1 EACH | $59,245 | $57,000 | $60,000 | $57,576 | $58,000 |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 3 EACH | $109,225 | $110,000 | $118,000 | $111,111 | $111,000 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 5 EACH | $165 | $200 | $225 | $202 | $202 |
| 630E79611 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED, AS PER PLA | 2 EACH | $620 | $1,000 | $950 | $1,010 | $1,020 |
| 630E80100 SIGN, FLAT SHEET | 387.5 SF | $12.25 | $22.00 | $18.00 | $22.22 | $22.40 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 529 SF | $22.15 | $26.00 | $25.00 | $26.26 | $26.50 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 1,048 SF | $24.75 | $26.00 | $24.00 | $26.26 | $26.50 |
| 630E80400 SIGN, PERMANENT OVERLAY | 5.3 SF | $15.00 | $50.00 | $30.00 | $50.51 | $51.00 |
| 630E84011 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 1 EACH | $25,225 | $31,693 | $14,000 | $27,778 | $28,000 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 12 EACH | $1,915 | $1,200 | $900 | $1,212 | $1,220 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 4 EACH | $14,385 | $12,750 | $10,200 | $12,879 | $13,000 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 52 EACH | $26.50 | $25.00 | $15.00 | $25.25 | $25.50 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 4 EACH | $320 | $130 | $140 | $131 | $133 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 46 EACH | $31.00 | $25.00 | $16.00 | $25.25 | $25.50 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 10 EACH | $160 | $400 | $285 | $404 | $405 |
| 630E86272 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND DISPOSA | 1 EACH | $50.00 | $400 | $40.00 | $404 | $405 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 5 EACH | $1,345 | $750 | $470 | $758 | $760 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 11 EACH | $380 | $300 | $250 | $303 | $305 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 5 EACH | $49.00 | $25.00 | $20.00 | $25.25 | $25.50 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 1 EACH | $51.00 | $300 | $240 | $303 | $305 |
| 630E89804 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 3 EACH | $3,150 | $4,500 | $3,100 | $4,545 | $4,550 |
| 646E10100 LANE LINE, 4" | 0.02 MILE | $8,500 | $8,500 | $8,500 | $8,500 | $8,600 |
| 646E10300 CHANNELIZING LINE, 8" | 547 FT | $5.25 | $5.25 | $5.25 | $5.25 | $5.35 |
| 646E10400 STOP LINE | 24 FT | $40.00 | $40.00 | $50.00 | $40.00 | $41.00 |
| 646E20300 LANE ARROW | 15 EACH | $595 | $595 | $500 | $595 | $607 |
| 646E20320 WRONG WAY ARROW | 1 EACH | $1,000 | $1,000 | $900 | $1,000 | $1,010 |
| 646E20502 DOTTED LINE, 4" | 159 FT | $5.00 | $5.00 | $5.00 | $5.00 | $5.05 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 3 EACH | $1,275 | $1,275 | $1,100 | $1,275 | $1,301 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 128 FT | $25.00 | $25.00 | $25.00 | $25.00 | $25.50 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 5.26 MILE | $7,570 | $7,570 | $7,500 | $7,570 | $7,721 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 5.28 MILE | $2,645 | $2,645 | $2,500 | $2,645 | $2,698 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 5,161 FT | $3.75 | $3.75 | $3.70 | $3.75 | $3.85 |
| 807E12430 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 5,366 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.05 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $4,235 | $4,235 | $4,100 | $4,235 | $4,320 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.50 | $2.50 | $2.50 | $2.50 | $2.55 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $7,775 | $7,775 | $7,600 | $7,775 | $7,931 |
| 850E20130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $3.50 | $3.50 | $3.50 | $3.50 | $3.55 |
| 202E98000 REMOVAL MISC.: ITS CABINET AND CCTV CAMERA SYSTEM | 1 LS | $600 | $4,300 | $2,200 | $602 | $614 |
| 202E98100 REMOVAL MISC.: CCTV CONCRETE POLE, 70 FEET | 1 EACH | $4,600 | $5,000 | $6,100 | $4,617 | $4,708 |
| 202E98100 REMOVAL MISC.: LOWERING UNIT | 1 EACH | $200 | $4,300 | $1,300 | $201 | $205 |
| 625E25408 CONDUIT, 2", 725.051 | 573 FT | $12.00 | $19.00 | $14.00 | $12.04 | $12.30 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 92 FT | $48.00 | $45.00 | $75.00 | $48.17 | $49.10 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 13 FT | $1.00 | $25.00 | $44.00 | $1.00 | $1.05 |
| 625E29100 TRENCH, 36" DEEP | 573 FT | $18.00 | $16.00 | $13.10 | $18.07 | $18.40 |
| 625E30700 PULL BOX, 725.08, 18" | 4 EACH | $1,100 | $1,900 | $1,350 | $1,104 | $1,126 |
| 625E32000 GROUND ROD | 9 EACH | $300 | $330 | $265 | $301 | $307 |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $6,100 | $7,500 | $6,700 | $6,122 | $6,244 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 573 FT | $3.00 | $3.00 | $1.00 | $3.01 | $3.05 |
| 625E39520 PULL BOX CLEANED | 1 EACH | $40.00 | $144 | $450 | $40.15 | $40.90 |
| 625E75510 POWER SERVICE REMOVED | 2 EACH | $700 | $1,184 | $910 | $703 | $715 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (PS-'PG') | 1 EACH | $2,400 | $550 | $2,750 | $2,409 | $2,457 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (PS-'SR8') | 1 EACH | $2,400 | $550 | $2,750 | $2,409 | $2,457 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 221 FT | $11.00 | $24.00 | $10.00 | $11.04 | $11.30 |
| 632E69320 POWER CABLE, 3 CONDUCTOR, NO. 2 AWG | 507 FT | $12.50 | $31.00 | $11.00 | $12.55 | $12.80 |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 1 EACH | $7,800 | $10,430 | $8,800 | $7,828 | $7,984 |
| 809E61002 CCTV CONCRETE POLE, 70 FEET | 1 EACH | $60,000 | $97,000 | $71,000 | $60,218 | $61,414 |
| 809E61100 CCTV LOWERING UNIT, INSTALLATION ONLY | 1 EACH | $400 | $4,300 | $2,600 | $401 | $410 |
| 809E65000 ITS CABINET - GROUND MOUNTED | 1 EACH | $15,500 | $18,800 | $15,700 | $15,556 | $15,865 |
| 625E18201 BRACKET ARM, 15', AS PER PLAN | 2 EACH | $1,000 | $1,400 | $2,100 | $1,004 | $1,024 |
| 625E18401 BRACKET ARM, 20', AS PER PLAN | 1 EACH | $1,500 | $1,800 | $2,500 | $1,505 | $1,535 |
| 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE | 310 FT | $2.70 | $3.00 | $4.90 | $2.71 | $2.75 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 123 FT | $2.00 | $3.50 | $1.90 | $2.01 | $2.05 |
| 625E25802 CONDUIT, CONCRETE ENCASED, (1)-3" | 1,412 FT | $21.00 | $26.00 | $70.00 | $21.08 | $21.50 |
| 625E25802 CONDUIT, CONCRETE ENCASED, (2)-3" | 112 FT | $36.00 | $47.00 | $85.00 | $36.13 | $36.90 |
| 625E25802 CONDUIT, CONCRETE ENCASED, (3)-3" | 135 FT | $52.00 | $57.00 | $110 | $52.19 | $53.20 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $850 | $1,650 | $1,100 | $853 | $870 |
| 625E29000 TRENCH | 235 FT | $14.00 | $20.00 | $14.00 | $14.05 | $14.30 |
| 625E29400 TRENCH IN PAVED AREA | 60 FT | $30.00 | $70.00 | $170 | $30.11 | $30.70 |
| 625E29700 TRENCH, MISC.:TRENCH FOR FIBER OPTIC CABLE | 1,364 FT | $14.00 | $25.00 | $14.00 | $14.05 | $14.25 |
| 625E31600 PULL BOX, MISC.:PULL BOX, 24" X 36" X 24" REINFORC | 4 EACH | $2,200 | $2,655 | $2,100 | $221 | $2,250 |
| 625E31600 PULL BOX, MISC.:PULL BOX, 30" X 48" X 24" REINFORC | 6 EACH | $3,300 | $2,550 | $3,200 | $3,312 | $3,375 |
| 625E32000 GROUND ROD | 5 EACH | $300 | $325 | $315 | $301 | $305 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 295 FT | $3.00 | $1.90 | $1.00 | $3.01 | $3.05 |
| 630E79201 SIGN ATTACHMENT ASSEMBLY, MAST ARM, AS PER PLAN | 5 EACH | $374 | $1,035 | $650 | $707 | $710 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 1 EACH | $35.00 | $491 | $250 | $354 | $355 |
| 630E80100 SIGN, FLAT SHEET | 15.8 SF | $12.00 | $42.74 | $25.00 | $30.30 | $30.50 |
| 630E80510 SIGN, STREET NAME | 3 EACH | $122 | $867 | $370 | $707 | $714 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $1,200 | $1,000 | $1,250 | $1,204 | $1,228 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,950 | $1,500 | $2,080 | $1,957 | $1,996 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $750 | $550 | $720 | $753 | $768 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $72.00 | $100 | $21.00 | $72.26 | $73.50 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 2 EACH | $60.00 | $62.00 | $21.00 | $60.22 | $61.40 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 143 FT | $22.00 | $11.00 | $10.00 | $22.08 | $22.50 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,164 FT | $2.80 | $3.00 | $6.00 | $2.81 | $2.85 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 595 FT | $3.00 | $4.00 | $7.25 | $3.01 | $3.05 |
| 632E62820 INTERCONNECT, MISC.: FAN-OUT KIT, 6-FIBER | 1 EACH | $100 | $2,000 | $520 | $100 | $102 |
| 632E62820 INTERCONNECT, MISC.: FIBER OPTIC CABLE TESTING GEN | 1 EACH | $2,000 | $6,000 | $9,400 | $2,007 | $2,047 |
| 632E62820 INTERCONNECT, MISC.: FIBER OPTIC PATCH CORD, 4-FIB | 1 EACH | $50.00 | $220 | $600 | $50.18 | $51.20 |
| 632E62820 INTERCONNECT, MISC.: FUSION SPLICE | 102 EACH | $40.00 | $70.00 | $400 | $40.15 | $40.90 |
| 632E62820 INTERCONNECT, MISC.: SLACK INSTALLATION | 5 EACH | $250 | $940 | $400 | $251 | $256 |
| 632E62820 INTERCONNECT, MISC.:FIBER OPTIC CONNECTOR | 8 EACH | $150 | $500 | $320 | $151 | $154 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $9,800 | $7,800 | $6,700 | $9,836 | $10,031 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $1,100 | $1,000 | $1,820 | $1,104 | $1,126 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 41 FT | $4.80 | $20.00 | $6.10 | $4.82 | $4.90 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 237 FT | $7.00 | $25.00 | $7.10 | $7.03 | $7.15 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,100 | $11,000 | $3,650 | $3,111 | $3,173 |
| 632E78349 COMBINATION SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 1 | 1 EACH | $27,400 | $38,000 | $42,700 | $27,500 | $28,046 |
| 632E79141 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $27,600 | $38,000 | $31,300 | $27,700 | $28,250 |
| 632E89701 PEDESTAL, 11', AS PER PLAN | 2 EACH | $2,000 | $1,400 | $1,100 | $2,007 | $2,047 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $1,650 | $5,200 | $5,150 | $1,656 | $1,689 |
| 632E90400 SIGNALIZATION, MISC.: SIGNAL PERFORMANCE TEST AND | 1 EACH | $1,100 | $290 | $2,900 | $1,104 | $1,126 |
| 632E90400 SIGNALIZATION, MISC.: TEST HOLE PERFORMED | 2 EACH | $180 | $590 | $750 | $181 | $184 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $2,900 | $2,100 | $3,400 | $2,911 | $2,968 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $900 | $1,300 | $945 | $903 | $921 |
| 633E99000 CONTROLLER ITEM, MISC.: FIBER OPTIC ETHERNET TRANS | 1 EACH | $3,150 | $1,100 | $3,160 | $3,161 | $3,224 |
| 804E98000 FIBER OPTIC CABLE, MISC.: DROP CABLE, 6-FIBER | 1,539 FT | $3.50 | $17.00 | $9.50 | $3.51 | $3.60 |
| 804E98000 FIBER OPTIC CABLE, MISC.: TRUNK CABLE, 48-FIBER | 364 FT | $4.00 | $20.00 | $9.50 | $4.01 | $4.10 |
| 625E30710 PULL BOX, 725.08, 32" | 4 EACH | $2,900 | $3,300 | $5,500 | $2,911 | $2,968 |
| AA2 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN (POLERA) (ALTER | 2 EACH | $900 | $700 | $885 | $1,800 | $921 |
| AB2 632E62820 INTERCONNECT, MISC.: SPLICE ENCLOSURE (AERIAL OR U | 1 EACH | $1,550 | $1,600 | $765 | $1,550 | $1,587 |
| AC2 632E62820 INTERCONNECT, MISC.: TERMINATION PANEL, CONTROLLER | 1 EACH | $1,550 | $1,750 | $900 | $1,550 | $1,585 |
| AD2 632E90400 SIGNALIZATION, MISC.: VIDEO DETECTION SYSTEM (AUTO | 1 EACH | $43,000 | $55,000 | $45,100 | $43,000 | $44,000 |
| AE2 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN (C | 1 EACH | $9,000 | $19,000 | $9,970 | $9,000 | $9,200 |
| AF2 633E99000 CONTROLLER ITEM, MISC.: SIGNAL CONTROLLER WITH CAB | 1 EACH | $21,500 | $28,000 | $22,620 | $21,500 | $22,000 |
| AG2 809E69200 EMERGENCY VEHICLE PREEMPTION PREEMPTION PRIORITY C | 1 EACH | $10,750 | $13,000 | $11,135 | $10,750 | $11,000 |
| 661E00500 MULCH | 13 CY | $100 | $200 | $100 | $140 | $227 |
| 661E00501 MULCH, AS PER PLAN "A" | 51 CY | $145 | $210 | $200 | $140 | $227 |
| 661E00501 MULCH, AS PER PLAN "B" | 34 CY | $190 | $180 | $250 | $140 | $227 |
| 661E14000 PERENNIALS, HEMEROCALLIS 'EENIE WEENIE'/ DAYLILY | 242 EACH | $25.00 | $45.00 | $26.00 | $30.00 | $45.30 |
| 661E14000 PERENNIALS, HEMEROCALLIS 'VIOLET LIGHT'/VIOLET LIG | 54 EACH | $25.00 | $45.00 | $26.00 | $30.00 | $45.30 |
| 661E14000 PERENNIALS, IMPERATA CYLINDRICA 'RED BARON'/JAPANE | 244 EACH | $25.00 | $45.00 | $26.00 | $30.00 | $45.30 |
| 661E14000 PERENNIALS, NARCISSUS 'ICE FOLLIES'/LARGE CUPPED D | 242 EACH | $25.00 | $10.00 | $7.00 | $30.00 | $9.05 |
| 661E20000 DECIDUOUS SHRUB, 15" HEIGHT, POTENTILLA FRUTICOSA | 25 EACH | $50.00 | $150 | $115 | $60.00 | $170 |
| 690E98000 SPECIAL - 6' BENCH, GABION MOUNTED | 3 EACH | $1,000 | $2,700 | $1,000 | $3,500 | $153 |
| 690E98000 SPECIAL - RECYCLED TIRE BIKE RACK | 1 EACH | $2,000 | $2,300 | $3,900 | $5,000 | $204 |
| 838E20701 GABIONS, AS PER PLAN | 67 CY | $350 | $515 | $350 | $400 | $408 |
| 870E10001 PREFABRICATED MODULAR RETAINING WALL, AS PER PLAN | 981 SF | $75.00 | $170 | $58.00 | $105 | $102 |
| 870E11100 NATURAL SOIL | 280 CY | $25.00 | $44.00 | $45.00 | $25.00 | $25.50 |
| 870E12000 6" DRAINAGE PIPE, PERFORATED | 417 FT | $13.00 | $13.00 | $20.00 | $12.00 | $15.30 |
| 870E12100 6" DRAINAGE PIPE, NON-PERFORATED | 58 FT | $22.00 | $29.00 | $35.00 | $20.00 | $20.40 |
| 870E14000 ON-SITE ASSISTANCE | 2 DAY | $1,000 | $500 | $1,500 | $1,000 | $1,020 |
| 870E15000 PMRW INSPECTION AND COMPACTION TESTING | 1 LS | $10,000 | $2,841 | $5,000 | $3,500 | $5,250 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6700017, APPURTENENCES | 1 LS | $12,000 | $9,000 | $1,500 | $5,000 | $7,700 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6710483, 1-STORY FRAME | 1 LS | $8,000 | $20,000 | $9,000 | $16,000 | $22,000 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6715813, APPURTENENCES | 1 LS | $10,000 | $7,000 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6717641, APPURTENENCES | 1 LS | $2,000 | $1.00 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6721358, APPURTENENCES | 1 LS | $1,000 | $1.00 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6736290, APPURTENENCES | 1 LS | $2,500 | $1.00 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6741032, APPURTENENCES | 1 LS | $2,500 | $1.00 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6741935, APPURTENENCES | 1 LS | $2,000 | $1,500 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6743824, APPURTENENCES | 1 LS | $1,000 | $1.00 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6824643, APPURTENENCES | 1 LS | $2,000 | $1,600 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6825925, APPURTENENCES | 1 LS | $7,500 | $750 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6830430, APPURTENENCES | 1 LS | $1,500 | $350 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6836758, APPURTENENCES | 1 LS | $2,500 | $2,000 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6840337, APPURTENENCES | 1 LS | $2,500 | $250 | $1,500 | $5,000 | $5,500 |
| 202E56000 BUILDING DEMOLISHED, PARCEL 6855399, APPURTENENCES | 1 LS | $1,500 | $750 | $1,500 | $5,000 | $5,500 |
| 511E81200 CONCRETE, MISC.: FORM LINER | 1 LS | $75,000 | $100,000 | $100,000 | $350,000 | $560,000 |
| 511E81300 CONCRETE, MISC.: BAS-RELIEF IMAGES AND TEXT | 2 EACH | $18,000 | $25,000 | $15,000 | $23,249 | $21,361 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 36 SY | $125 | $180 | $100 | $298 | $152 |
| 605E05111 4" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 3,190 FT | $23.00 | $21.00 | $20.00 | $15.00 | $10.25 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 87 FT | $60.00 | $27.00 | $30.00 | $73.30 | $25.50 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 21 EACH | $450 | $300 | $350 | $550 | $255 |
| 251E01010 PARTIAL DEPTH PAVEMENT REPAIR (441) | 605 CY | $545 | $525 | $320 | $548 | $735 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 12,830 SY | $10.00 | $15.00 | $2.50 | $10.05 | $13.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,197 GAL | $3.50 | $4.00 | $5.00 | $3.52 | $3.60 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $125 | $90.00 | $50.00 | $55.00 | $545 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 45 CY | $700 | $200 | $50.00 | $225 | $700 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 305 CY | $365 | $525 | $260 | $367 | $513 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 680 HOUR | $90.00 | $92.00 | $95.00 | $80.00 | $76.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 17,584 FT | $3.75 | $0.35 | $1.00 | $3.75 | $3.85 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $5,000 | $3,500 | $2,200 | $11,179 | $11,400 |
| 614E12390 WORK ZONE IMPACT ATTENUATOR, 24"-36" WIDE HAZARDS, | 3 EACH | $13,750 | $3,300 | $4,400 | $16,810 | $17,100 |
| 614E12400 WORK ZONE IMPACT ATTENUATOR, MISC.: WORK ZONE IMPA | 1 EACH | $21,600 | $2,300 | $5,000 | $23,110 | $23,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $45,400 | $90,000 | $75,000 | $45,400 | $46,300 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 12 EACH | $275 | $700 | $500 | $275 | $280 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 5,169 EACH | $21.00 | $45.00 | $37.00 | $44.15 | $6.10 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 1,576 CY | $285 | $350 | $250 | $286 | $330 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 808 EACH | $14.00 | $7.00 | $10.00 | $14.00 | $14.30 |
| 614E13350 OBJECT MARKER, ONE WAY | 598 EACH | $19.00 | $18.00 | $12.00 | $19.00 | $19.40 |
| 614E13360 OBJECT MARKER, TWO WAY | 105 EACH | $22.00 | $20.00 | $15.00 | $22.00 | $22.40 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: BRIDGE DECK AND PAVEME | 100,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E18002 MAINTAINING TRAFFIC, MISC.: MAINTAINING TRAFFIC, M | 1 LS | $35,000 | $100,000 | $100,000 | $12,000 | $12,200 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 360 SNMT | $650 | $600 | $500 | $600 | $612 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 8.38 MILE | $735 | $735 | $750 | $735 | $749 |
| 614E20011 WORK ZONE LANE LINE, CLASS I, 6", AS PER PLAN | 6.54 MILE | $7,775 | $7,775 | $7,800 | $7,775 | $7,900 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 13.47 MILE | $700 | $700 | $700 | $700 | $710 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 23.19 MILE | $1,550 | $1,550 | $1,500 | $1,550 | $1,575 |
| 614E22011 WORK ZONE EDGE LINE, CLASS I, 6", AS PER PLAN | 10.24 MILE | $9,995 | $9,995 | $9,900 | $9,995 | $10,195 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 13.94 MILE | $1,525 | $1,525 | $1,600 | $1,525 | $1,555 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 54,974 FT | $1.25 | $1.25 | $1.25 | $1.25 | $1.30 |
| 614E23011 WORK ZONE CHANNELIZING LINE, CLASS I, 12", AS PER | 20,820 FT | $3.20 | $3.20 | $3.20 | $3.20 | $3.25 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 12,766 FT | $1.15 | $1.15 | $1.15 | $1.15 | $1.20 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 4,271 FT | $1.20 | $1.20 | $1.20 | $1.20 | $1.25 |
| 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN | 3,352 FT | $3.15 | $3.15 | $3.15 | $3.15 | $3.20 |
| 614E24618 WORK ZONE DOTTED LINE, CLASS III, 12", 642 PAINT | 13,350 FT | $1.10 | $1.10 | $1.10 | $1.10 | $1.15 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 1,254 FT | $4.75 | $4.75 | $4.50 | $4.75 | $4.80 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 139 FT | $5.50 | $5.50 | $5.50 | $5.50 | $5.60 |
| 614E26001 WORK ZONE STOP LINE, CLASS I, AS PER PLAN | 24 FT | $104 | $104 | $104 | $104 | $106 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 72 FT | $5.00 | $5.00 | $5.00 | $5.00 | $5.05 |
| 614E27011 WORK ZONE CROSSWALK LINE, CLASS I, 12", AS PER PLA | 94 FT | $103 | $103 | $103 | $103 | $105 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 470 FT | $4.50 | $4.50 | $4.50 | $4.50 | $4.60 |
| 614E30000 WORK ZONE ARROW, CLASS I | 15 EACH | $100 | $100 | $100 | $100 | $102 |
| 614E30001 WORK ZONE ARROW, CLASS I, AS PER PLAN | 8 EACH | $1,250 | $1,250 | $1,250 | $1,250 | $1,260 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 33 EACH | $90.00 | $90.00 | $90.00 | $90.00 | $91.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $750,000 | $600,000 | $740,000 | $500,000 | $450,000 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 1,999 SY | $90.00 | $150 | $67.00 | $85.84 | $51.00 |
| 616E10000 WATER | 400 MGAL | $60.00 | $85.00 | $10.00 | $65.00 | $900 |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 10,230 FT | $15.00 | $17.00 | $27.00 | $19.45 | $17.90 |
| 622E41050 PORTABLE BARRIER, "Y" CONNECTOR | 2 EACH | $2,000 | $1,000 | $3,000 | $3,000 | $3,550 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 28,664 FT | $8.00 | $9.50 | $15.00 | $10.01 | $13.25 |
| 630E87101 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, A | 1 EACH | $1,200 | $10,000 | $9,800 | $5,000 | $7,650 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 49,679 FT | $1.13 | $1.00 | $1.50 | $1.13 | $1.15 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 360 SNMT | $350 | $530 | $285 | $500 | $510 |
| 690E65000 SPECIAL - WORK INVOLVING NON-REGULATED MATERIALS | 1,000 TON | $50.00 | $70.00 | $25.00 | $58.00 | $86.00 |
| 690E65002 SPECIAL - WORK INVOLVING HAZARDOUS WASTE | 100 TON | $500 | $325 | $500 | $312 | $205 |
| 690E65010 SPECIAL - WORK INVOLVING SOLID WASTE | 500 TON | $200 | $96.00 | $220 | $84.00 | $102 |
| 690E65022 SPECIAL - WORK INVOLVING NON-REGULATED WATER | 10,000 GAL | $2.50 | $2.15 | $1.50 | $1.35 | $5.00 |
| 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER | 10,000 GAL | $3.75 | $3.10 | $3.00 | $2.25 | $2.05 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,268 | $1,473 | $7,500 | $10,576 | $4,800 |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 1 LS | $35,000 | $20,000 | $45,000 | $7,000 | $3,050 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 8,025 LB | $2.15 | $2.20 | $1.80 | $2.46 | $1.90 |
| 511E46212 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 146 CY | $650 | $850 | $800 | $1,200 | $1,600 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 145 SY | $32.00 | $32.00 | $35.00 | $34.61 | $33.50 |
| 512E33000 TYPE 2 WATERPROOFING | 16 SY | $60.00 | $40.00 | $50.00 | $170 | $62.80 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 16 SF | $8.50 | $13.12 | $15.00 | $42.87 | $45.00 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 76 CY | $185 | $265 | $90.00 | $150 | $175 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $700,000 | $2,100,000 | $1,600,000 | $3,233,812 | $1,400,000 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 4,506 CY | $130 | $120 | $40.00 | $45.00 | $28.20 |
| 503E31500 STRUCTURAL EXCAVATION, MISC.: LAUNCHING PIT | 1 LS | $1,100,000 | $1,200,000 | $1,950,000 | $500,000 | $1,110,000 |
| 503E31500 STRUCTURAL EXCAVATION, MISC.: RECEIVING PIT | 1 LS | $250,000 | $750,000 | $1,390,000 | $75,000 | $500,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $50,000 | $15,000 | $12,000 | $155,000 | $280,000 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 2,200 FT | $20.00 | $22.00 | $24.00 | $110 | $73.00 |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 2,400 FT | $80.00 | $85.00 | $62.00 | $100 | $98.00 |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 3,910 FT | $20.00 | $22.00 | $24.00 | $120 | $70.00 |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 4,140 FT | $160 | $145 | $109 | $110 | $175 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 53,782 FT | $1.75 | $1.80 | $1.50 | $2.34 | $1.60 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 612 EACH | $22.00 | $20.00 | $32.00 | $51.14 | $32.20 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 515 CY | $900 | $1,200 | $750 | $1,900 | $1,030 |
| 511E42512 CLASS QC1 CONCRETE WITH QC/QA, PIER CAP | 91 CY | $950 | $1,700 | $1,950 | $1,800 | $2,200 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 495 CY | $1,200 | $1,200 | $1,080 | $1,700 | $2,170 |
| 511E45602 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA | 2,074 CY | $450 | $500 | $900 | $1,350 | $650 |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 131 CY | $825 | $900 | $950 | $1,700 | $1,770 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 479 CY | $300 | $500 | $910 | $1,250 | $535 |
| 511E53010 CLASS QC1 CONCRETE, MISC.: FILL CONCRETE | 114 CY | $225 | $300 | $420 | $270 | $310 |
| 511E53010 CLASS QC1 CONCRETE, MISC.: FOOTING APRON | 250 CY | $550 | $900 | $570 | $670 | $1,030 |
| 511E53010 CLASS QC1 CONCRETE, MISC.: MONUMENT | 147 CY | $1,200 | $1,650 | $1,700 | $1,800 | $2,000 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN | 1,808 SY | $17.00 | $17.00 | $17.00 | $18.39 | $33.50 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 1,835 SY | $14.00 | $14.00 | $14.00 | $15.14 | $14.70 |
| 512E33000 TYPE 2 WATERPROOFING | 129 SY | $40.00 | $29.75 | $45.00 | $104 | $62.80 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 23,330 EACH | $5.25 | $6.00 | $5.75 | $5.60 | $11.00 |
| 513E90000 STRUCTURAL STEEL, MISC.: MONUMENT | 35,909 LB | $3.25 | $6.00 | $2.85 | $5.74 | $8.50 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 39,124 SF | $10.00 | $18.00 | $10.00 | $11.51 | $10.40 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 39,124 SF | $5.00 | $6.00 | $5.00 | $5.75 | $5.20 |
| 516E12400 SPECIAL - MODULAR EXPANSION JOINT | 162 FT | $6,000 | $7,800 | $5,700 | $7,000 | $10,693 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 271 SF | $10.00 | $7.00 | $12.00 | $47.60 | $43.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 102 SF | $12.00 | $12.00 | $13.00 | $55.38 | $43.00 |
| 517E75000 RAILING, ALUMINUM | 107 FT | $235 | $250 | $295 | $237 | $240 |
| 517E76300 RAILING, MISC.: DECORATIVE RAILINGS WITH MESH FABR | 3,218 FT | $333 | $335 | $485 | $323 | $340 |
| 518E12200 SCUPPERS, INCLUDING SUPPORTS | 21 EACH | $3,400 | $2,600 | $10,500 | $5,587 | $5,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 949 CY | $110 | $110 | $85.00 | $60.00 | $57.30 |
| 518E42000 8" PERFORATED CORRUGATED PLASTIC PIPE | 241 FT | $27.00 | $8.00 | $30.00 | $19.00 | $11.00 |
| 518E42010 8" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 202 FT | $25.00 | $8.00 | $20.00 | $65.00 | $11.00 |
| 518E51101 8" PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN | 988 FT | $210 | $240 | $220 | $265 | $350 |
| 518E62200 STRUCTURE DRAINAGE, MISC.: PIER DRAINAGE AND VENTI | 3 EACH | $750 | $550 | $8,000 | $12,168 | $1,200 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $4,500 | $5,000 | $4,000 | $2,655 | $1,354 |
| 524E94904 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK | 304 FT | $450 | $1,200 | $1,075 | $1,500 | $764 |
| 524E94906 DRILLED SHAFTS, 54" DIAMETER, ABOVE BEDROCK | 841 FT | $1,150 | $1,200 | $660 | $1,500 | $764 |
| 524E95200 DRILLED SHAFTS, MISC. SHAFT INSPECTION DEVICE | 1 LS | $52,000 | $50,000 | $85,000 | $75,000 | $108,834 |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 548 SY | $350 | $400 | $417 | $500 | $482 |
| 526E90010 TYPE A INSTALLATION | 167 FT | $150 | $250 | $240 | $372 | $280 |
| 530E00200 SPECIAL - STRUCTURES LADDER SAFETY DEVICE - PIERS | 1 LS | $35,000 | $45,000 | $147,000 | $17,000 | $17,674 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: ACCESS DOORS - PIERS | 1 LS | $30,000 | $40,000 | $20,000 | $38,665 | $52,021 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: BRIDGE CONSTRUCTION M | 1 LS | $325,000 | $500,000 | $115,000 | $125,000 | $300,000 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: INTERIOR LIGHTING - P | 1 LS | $60,500 | $77,000 | $115,000 | $45,164 | $46,060 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: LADDERS AND PLATFORMS | 1 LS | $125,000 | $170,000 | $145,000 | $135,000 | $263,520 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: STRUCTURAL SURVEY AND | 1 LS | $40,000 | $50,000 | $20,000 | $37,065 | $57,700 |
| 530E13000 SPECIAL - FORM LINER | 24,875 SF | $16.00 | $15.00 | $36.00 | $16.92 | $30.00 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 400 CY | $128 | $150 | $145 | $215 | $330 |
| 867E00100 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH | 1 LS | $100,000 | $300,000 | $50,000 | $85,074 | $75,000 |
| 869E00101 HIGH LOAD MULTI-ROTATIONAL (HLMR) BEARINGS, AS PER | 42 EACH | $25,000 | $25,000 | $23,000 | $32,006 | $34,000 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 32 EACH | $4,500 | $2,200 | $4,700 | $4,000 | $3,300 |
| 202E22900 APPROACH SLAB REMOVED | 521 SY | $50.00 | $30.00 | $35.00 | $40.00 | $45.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $200,000 | $500,000 | $570,000 | $600,000 | $560,000 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 7,675 CY | $85.00 | $120 | $40.00 | $35.00 | $40.00 |
| 503E31100 ROCK EXCAVATION | 829 CY | $70.00 | $60.00 | $40.00 | $139 | $77.00 |
| 503E31500 STRUCTURAL EXCAVATION, MISC.: LAUNCHING PIT | 1 LS | $900,000 | $900,000 | $285,000 | $950,000 | $1,824,240 |
| 503E31500 STRUCTURAL EXCAVATION, MISC.: RECEIVING PIT | 1 LS | $85,000 | $350,000 | $250,000 | $150,000 | $766,857 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $35,000 | $15,000 | $12,000 | $105,000 | $300,000 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,855 FT | $18.00 | $22.00 | $24.00 | $110 | $85.00 |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 2,120 FT | $75.00 | $80.00 | $62.00 | $100 | $100 |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 3,450 FT | $18.00 | $22.00 | $24.00 | $120 | $69.60 |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 3,680 FT | $140 | $140 | $109 | $110 | $180 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 53,366 FT | $1.75 | $1.80 | $1.50 | $2.44 | $1.60 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 612 EACH | $22.00 | $20.00 | $32.00 | $51.14 | $35.00 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 506 CY | $850 | $1,200 | $750 | $1,400 | $1,118 |
| 511E42512 CLASS QC1 CONCRETE WITH QC/QA, PIER CAP | 91 CY | $900 | $1,700 | $1,950 | $1,700 | $2,260 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 526 CY | $950 | $1,200 | $1,080 | $1,500 | $2,195 |
| 511E45602 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA | 2,071 CY | $425 | $500 | $900 | $800 | $628 |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 406 CY | $750 | $900 | $950 | $1,400 | $1,834 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 624 CY | $300 | $500 | $910 | $700 | $528 |
| 511E53010 CLASS QC1 CONCRETE, MISC.: FOOTING APRON | 250 CY | $550 | $900 | $570 | $670 | $1,297 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN | 1,957 SY | $17.00 | $17.00 | $17.00 | $18.39 | $33.50 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 1,872 SY | $14.00 | $14.00 | $14.00 | $15.14 | $14.70 |
| 512E10051 SEALING OF CONCRETE SURFACES (NON-EPOXY), AS PER P | 7,666 SY | $140 | $74.00 | $93.57 | $80.04 | $77.40 |
| 512E33000 TYPE 2 WATERPROOFING | 156 SY | $35.00 | $29.75 | $45.00 | $104 | $62.80 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 23,248 EACH | $6.00 | $6.00 | $6.50 | $6.40 | $10.00 |
| 513E95020 STRUCTURAL STEEL, MISC.: STRUCTURAL STEEL ERECTION | 1 LS | $800,000 | $4,000,000 | $5,800,000 | $4,500,000 | $4,000,000 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 39,028 SF | $10.00 | $18.00 | $10.00 | $11.51 | $10.40 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 39,028 SF | $5.00 | $6.00 | $5.00 | $5.75 | $5.20 |
| 516E12400 SPECIAL - MODULAR EXPANSION JOINT | 157 FT | $5,500 | $7,800 | $5,700 | $7,000 | $10,000 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 344 SF | $10.00 | $7.00 | $12.00 | $47.60 | $45.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 102 SF | $12.00 | $12.00 | $13.00 | $55.38 | $45.00 |
| 517E75000 RAILING, ALUMINUM | 109 FT | $235 | $250 | $295 | $237 | $240 |
| 517E76300 RAILING, MISC.: DECORATIVE RAILINGS WITH MESH FABR | 3,155 FT | $333 | $335 | $485 | $323 | $340 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1,096 CY | $115 | $110 | $85.00 | $120 | $58.00 |
| 518E42000 8" PERFORATED CORRUGATED PLASTIC PIPE | 319 FT | $30.00 | $8.00 | $30.00 | $26.55 | $12.00 |
| 518E42010 8" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 317 FT | $35.00 | $8.00 | $20.00 | $47.99 | $12.00 |
| 518E62200 STRUCTURE DRAINAGE, MISC.: PIER DRAINAGE AND VENTI | 3 EACH | $1,000 | $575 | $8,000 | $12,168 | $1,250 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,500 | $5,000 | $4,000 | $2,655 | $2,708 |
| 524E94904 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK | 328 FT | $425 | $1,200 | $1,075 | $1,500 | $806 |
| 524E94906 DRILLED SHAFTS, 54" DIAMETER, ABOVE BEDROCK | 516 FT | $1,200 | $1,200 | $660 | $1,500 | $806 |
| 524E95200 DRILLED SHAFTS, MISC. SHAFT INSPECTION DEVICE | 1 LS | $52,000 | $50,000 | $85,000 | $75,000 | $108,834 |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 530 SY | $350 | $400 | $417 | $450 | $490 |
| 526E90010 TYPE A INSTALLATION | 159 FT | $150 | $250 | $240 | $375 | $301 |
| 530E00200 SPECIAL - STRUCTURES LADDER SAFETY DEVICE - PIERS | 1 LS | $35,000 | $45,000 | $147,000 | $17,000 | $18,000 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: ACCESS DOORS - PIERS | 1 LS | $25,000 | $40,000 | $20,000 | $38,665 | $52,000 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: AESTHETIC LIGHTING - | 1 LS | $313,000 | $417,000 | $190,000 | $314,138 | $320,375 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: BRIDGE CONSTRUCTION M | 1 LS | $175,000 | $350,000 | $115,000 | $125,000 | $200,000 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: INTERIOR LIGHTING - P | 1 LS | $60,000 | $80,000 | $125,000 | $45,164 | $46,060 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: LADDERS AND PLATFORMS | 1 LS | $115,000 | $170,000 | $145,000 | $135,000 | $225,000 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: STRUCTURAL SURVEY AND | 1 LS | $40,000 | $22,440 | $20,000 | $37,065 | $58,800 |
| 530E13000 SPECIAL - FORM LINER | 25,456 SF | $4.75 | $15.00 | $36.00 | $17.06 | $28.00 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 300 CY | $165 | $150 | $145 | $215 | $340 |
| 867E00100 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH | 1 LS | $45,000 | $1.00 | $50,000 | $0.01 | $17,000 |
| 869E00101 HIGH LOAD MULTI-ROTATIONAL (HLMR) BEARINGS, AS PER | 42 EACH | $20,000 | $25,000 | $23,000 | $31,416 | $30,000 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 32 EACH | $3,500 | $2,200 | $4,700 | $4,000 | $3,400 |
| 514E27700 FIELD PAINTING, MISC.: MONUMENT DECRATIVE STEEL | 3,727 SF | $65.00 | $30.00 | $65.00 | $6.90 | $10.60 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $210,000 | $75,000 | $125,000 | $155,887 | $100,000 |
| 100E51100 DEPARTMENT'S SHARE OF THE DISPUTE RESOLUTION BOARD | 175,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $410,000 | $1,200,000 | $1,700,000 | $1,500,000 | $2,541,050 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $10,000 | $30,000 | $25,000 | $100,000 | $300,000 |
| 111E10100 SPECIAL - DEPARTMENTS SHARE FACILITATED PARTNERING | 9,250 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 60 MNTH | $6,500 | $7,000 | $3,000 | $7,305 | $30,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $840,000 | $611,000 | $1,400,000 | $1,300,000 | $1,583,890 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10401 STRUCTURAL STEEL MEMBERS, HYBRID GIRDER, LEVEL SIX | 8,253,152 LB | $2.8 | $23.1M | 15% |
| 513E10401 STRUCTURAL STEEL MEMBERS, HYBRID GIRDER, LEVEL SIX | 7,779,001 LB | $2.6 | $20.2M | 13% |
| 513E95020 STRUCTURAL STEEL, MISC.: STRUCTURAL STEEL ERECTION | 1 LS | $7,000,000 | $7.00M | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,016,127 LB | $2.15 | $6.48M | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,006,458 LB | $2.15 | $6.46M | 4% |
| 511E45603 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA, | 4,999 CY | $935 | $4.67M | 3% |
| 511E45603 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE WITH QC/QA, | 4,854 CY | $900 | $4.37M | 3% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 4,432 CY | $905 | $4.01M | 3% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $4,000,000 | $4.00M | 3% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 4,368 CY | $900 | $3.93M | 2% |