ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 48 more items below.
| Item | Quantity | R1D G M INC | R2Axis Civil Construction LLC | R3Eclipse CO LLC | R4John R Jurgensen Company | R5Heavy Highway Construction Company | R6LLC Coopers Excavating LLC | R7Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E95200 10' X 6' CONDUIT, TYPE A, 706.05 | 66 FT | $1,985 | $1,650 | $1,600 | $1,114 | $1,300 | $1,400 | $1,396 | 32% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 98 CY | $345 | $400 | $330 | $800 | $825 | $445 | $354 | 8% |
| 253E02000 |
| Item | Quantity | R1D G M INC | R2Axis Civil Construction LLC | R3Eclipse CO LLC | R4John R Jurgensen Company | R5Heavy Highway Construction Company | R6LLC Coopers Excavating LLC | R7Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 31 FT | $20.00 | $30.00 | $14.00 | $30.75 | $25.00 | $5.00 | $25.53 |
| 202E38000 GUARDRAIL REMOVED | 423 FT | $1.00 | $4.00 | $5.00 | $5.00 | $2.00 | $10.00 | $5.26 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 100 CY |
| $260 |
| $130 |
| $447 |
| $425 |
| $425 |
| $450 |
| $386 |
| 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 70 CY | $335 | $350 | $320 | $700 | $725 | $425 | $343 | 6% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $20,000 | $16,000 | $12,000 | $10,212 | $20,000 | $25,000 | $17,201 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $32,997 | $10,000 | $30,000 | $40,000 | $48,379 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $5,000 | $5,000 | $2,589 | $7,500 | $15,000 | $7,487 | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 30 CY | $500 | $500 | $1,200 | $900 | $600 | $750 | $654 | 4% |
| 203E20000 EMBANKMENT | 969 CY | $15.00 | $24.00 | $17.00 | $40.18 | $18.00 | $30.00 | $32.17 | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 19 CY | $700 | $800 | $1,900 | $1,248 | $700 | $1,500 | $1,512 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,500 | $10,000 | $6,000 | $5,176 | $10,000 | $15,000 | $4,540 | 3% |
| 203E10000 EXCAVATION | 814 CY | $15.00 | $24.00 | $15.00 | $36.36 | $18.00 | $30.00 | $28.52 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $4,500 | $11,000 | $3,289 | $25,000 | $35,000 | $0.01 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,704 LB | $2.00 | $2.00 | $5.00 | $2.89 | $2.50 | $2.25 | $3.22 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2") | 515 SY | $15.75 | $18.00 | $16.00 | $30.00 | $30.00 | $16.00 | $21.99 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $160 | $130 | $285 | $350 | $350 | $440 | $563 | 2% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 116 CY | $65.00 | $78.00 | $79.00 | $84.16 | $85.00 | $75.00 | $84.96 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $7,480 | $12,000 | $7,480 | $12,500 | $7,480 | $6,255 | 2% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (22 CY | $335 | $400 | $320 | $700 | $775 | $440 | $343 | 2% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 55 CY | $100 | $80.00 | $106 | $101 | $75.00 | $125 | $120 | 1% |
| 3 EACH |
| $300 |
| $250 |
| $175 |
| $145 |
| $500 |
| $500 |
| $556 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $200 | $250 | $125 | $115 | $500 | $500 | $556 |
| 202E75000 FENCE REMOVED | 225 FT | $5.00 | $4.00 | $3.00 | $10.50 | $3.00 | $5.00 | $4.56 |
| 204E10000 SUBGRADE COMPACTION | 435 SY | $5.00 | $3.00 | $1.00 | $3.84 | $2.50 | $1.00 | $2.64 |
| 204E10001 SUBGRADE COMPACTION, AS PER PLAN | 46 SY | $35.00 | $20.00 | $5.00 | $7.26 | $5.00 | $25.00 | $94.65 |
| 204E13000 EXCAVATION OF SUBGRADE | 116 CY | $15.00 | $25.00 | $60.00 | $51.96 | $30.00 | $25.00 | $63.48 |
| 204E45000 PROOF ROLLING | 1 HOUR | $70.00 | $220 | $286 | $208 | $500 | $100 | $417 |
| 204E50000 GEOTEXTILE FABRIC | 233 SY | $1.00 | $3.00 | $1.00 | $8.71 | $4.30 | $1.25 | $1.76 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 4 EACH | $400 | $1,200 | $901 | $554 | $1,500 | $1,000 | $700 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 3 EACH | $200 | $700 | $712 | $536 | $1,000 | $500 | $700 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $2,000 | $10,000 | $3,534 | $7,560 | $20,000 | $5,000 | $9,494 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 10 CY | $50.00 | $80.00 | $106 | $245 | $200 | $100 | $180 |
| 659E10000 SEEDING AND MULCHING | 2,256 SY | $2.00 | $1.70 | $1.54 | $1.55 | $1.50 | $1.70 | $2.16 |
| 659E14000 REPAIR SEEDING AND MULCHING | 113 SY | $0.05 | $1.70 | $0.78 | $0.78 | $1.50 | $1.70 | $2.27 |
| 659E20000 COMMERCIAL FERTILIZER | 0.84 TON | $1,000 | $1,400 | $924 | $923 | $800 | $1,400 | $1,412 |
| 659E31000 LIME | 0.04 ACRE | $100 | $100 | $163 | $154 | $80.00 | $100 | $454 |
| 659E35000 WATER | 12 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.01 |
| 671E15010 EROSION CONTROL MAT, TYPE B | 137 SY | $4.00 | $5.00 | $1.87 | $1.88 | $3.75 | $5.00 | $2.52 |
| 832E30000 EROSION CONTROL | 3,552 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $1,500 | $5,000 | $3,762 | $8,705 | $2,000 | $6,000 | $10,757 |
| 605E31100 AGGREGATE DRAINS | 142 FT | $25.00 | $15.00 | $20.00 | $25.02 | $35.00 | $20.00 | $13.48 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $6.00 | $20.00 | $38.00 | $39.17 | $18.00 | $5.00 | $23.92 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $6.00 | $20.00 | $38.00 | $37.50 | $18.00 | $5.00 | $23.92 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $8.00 | $20.00 | $47.00 | $46.66 | $20.00 | $10.00 | $45.66 |
| 611E04900 12" CONDUIT, TYPE D | 25 FT | $70.00 | $40.00 | $65.00 | $92.40 | $20.00 | $50.00 | $95.99 |
| 304E20000 AGGREGATE BASE | 76 CY | $70.00 | $80.00 | $76.00 | $83.26 | $85.00 | $110 | $85.70 |
| 407E10000 TACK COAT | 165 GAL | $2.50 | $4.00 | $2.50 | $10.00 | $10.00 | $15.00 | $2.68 |
| 621E00100 RPM | 8 EACH | $240 | $241 | $257 | $241 | $450 | $241 | $243 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $1.00 | $23.00 | $21.00 | $27.92 | $100 | $5.00 | $6.57 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $100 | $200 | $263 | $345 | $100 | $25.00 | $71.60 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.12 MILE | $12,000 | $11,264 | $9,837 | $11,264 | $2,100 | $11,264 | $11,364 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $18,000 | $16,900 | $13,158 | $16,900 | $2,100 | $16,900 | $17,050 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $40.00 | $65.00 | $68.00 | $89.65 | $75.00 | $50.00 | $121 |
| 616E10000 WATER | 6 MGAL | $1.00 | $1.00 | $35.00 | $722 | $1.00 | $1.00 | $13.56 |
| 204E13000 EXCAVATION OF SUBGRADE | 62 CY | $15.00 | $30.00 | $68.00 | $90.50 | $30.00 | $75.00 | $52.38 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 62 CY | $65.00 | $80.00 | $77.00 | $122 | $75.00 | $100 | $72.99 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,000 | $9,500 | $19,000 | $3,527 | $20,000 | $1,000 | $13,764 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $2,000 | $12,000 | $8,301 | $7,511 | $10,000 | $35,000 | $92,853 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $1,500 | $1,200 | $2,500 | $2,127 | $1,000 | $1,750 | $2,762 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 58 SY | $40.00 | $60.00 | $25.00 | $60.00 | $20.00 | $55.00 | $60.53 |
| 512E33000 TYPE 2 WATERPROOFING | 210 SY | $15.00 | $18.00 | $19.00 | $55.00 | $22.00 | $40.00 | $55.49 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 46 SF | $15.00 | $8.00 | $8.00 | $13.78 | $10.00 | $1.00 | $3.94 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 9 CY | $120 | $150 | $104 | $241 | $100 | $100 | $131 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 60 CY | $80.00 | $110 | $89.00 | $245 | $150 | $90.00 | $112 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $750 | $2,000 | $684 | $1,748 | $1,200 | $500 | $1,660 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $6,500 | $8,500 | $3,012 | $10,000 | $5,000 | $5,852 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E95200 10' X 6' CONDUIT, TYPE A, 706.05 | 66 FT | $1,985 | $131k | 28% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 98 CY | $345 | $34k | 7% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $260 | $26k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 70 CY | $335 | $23k | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $20,000 | $20k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $18k | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 30 CY | $500 | $15k | 3% |
| 203E20000 EMBANKMENT | 969 CY | $15 | $15k | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 19 CY | $700 | $13k | 3% |