ADA-SR 770-03.41
ADA County · est $1.4M
Bid dateThursday, April 13—
ADA County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 86 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2D G M INC | R3Axis Civil Construction LLC | R4George J Igel & CO INC | % of bid |
|---|---|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $20,000 | $21,000 | $18,200 | $22,500 | 15% |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 215 SY | $422 | $380 | $420 | $485 | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 318 CY | $250 | $265 | $275 | $240 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $76,500 | $40,000 | $40,000 | $40,000 | 7% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 154 CY | $462 | $675 | $700 | $627 | 7% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 65 CY | $1,080 | $675 | $1,200 |
| Item | Quantity | R1Allard Excavation LLC | R2D G M INC | R3Axis Civil Construction LLC | R4George J Igel & CO INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,700 | $17,000 | $6,500 | $5,000 |
| 202E20010 HEADWALL REMOVED | 3 EACH | $313 | $500 | $225 | $315 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 214 FT | $12.00 | $30.00 | $35.00 | $22.50 |
| 202E35200 PIPE REMOVED, OVER 24" | 61 FT | $21.00 | $40.00 | $75.00 | $29.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,125 |
| 7% |
| 517E70101 RAILING (THREE STEEL TUBE BRIDGE RAILING), AS PER | 140 FT | $473 | $485 | $473 | $473 | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 29,951 LB | $2.00 | $1.85 | $1.80 | $2.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $58,700 | $50,000 | $35,000 | $55,000 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 182 CY | $283 | $295 | $320 | $309 | 5% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 77 CY | $572 | $650 | $550 | $715 | 4% |
| 611E52900 34" X 53" CONDUIT, TYPE A, 706.04 | 90 FT | $436 | $430 | $530 | $475 | 4% |
| 524E94804 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK | 100 FT | $358 | $660 | $860 | $600 | 3% |
| 203E35110 GRANULAR MATERIAL, TYPE B | 556 CY | $61.00 | $60.00 | $80.00 | $67.00 | 3% |
| 304E20000 AGGREGATE BASE | 361 CY | $68.00 | $70.00 | $95.00 | $73.00 | 2% |
| 611E10600 24" CONDUIT, TYPE C, 706.01, 706.02, 707.01 (0.064 | 269 FT | $88.00 | $95.00 | $110 | $105 | 2% |
| 203E10000 EXCAVATION | 1,763 CY | $13.00 | $17.00 | $23.00 | $24.00 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 60 CY | $283 | $275 | $240 | $400 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 562.5 FT | $25.25 | $27.00 | $25.25 | $25.25 | 1% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 178 CY | $79.00 | $75.00 | $90.00 | $74.50 | 1% |
| 147 FT |
| $3.00 |
| $1.00 |
| $6.00 |
| $5.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT 18" | 38 FT | $59.00 | $85.00 | $40.00 | $30.00 |
| 202E75000 FENCE REMOVED | 220 FT | $2.40 | $4.00 | $4.00 | $2.25 |
| 202E75250 GATE REMOVED | 1 EACH | $219 | $250 | $145 | $122 |
| 202E98100 REMOVAL MISC.: POST REMOVED | 12 EACH | $43.00 | $25.00 | $60.00 | $41.00 |
| 202E98200 REMOVAL MISC.: WALL REMOVED | 11 FT | $37.00 | $500 | $40.00 | $38.00 |
| 203E20000 EMBANKMENT | 831 CY | $14.00 | $17.00 | $23.00 | $20.50 |
| 204E10000 SUBGRADE COMPACTION | 3,212 SY | $3.50 | $3.00 | $3.00 | $1.40 |
| 204E13000 EXCAVATION OF SUBGRADE | 556 CY | $20.00 | $17.00 | $20.00 | $39.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $175 | $75.00 | $200 | $123 |
| 204E50000 GEOTEXTILE FABRIC | 2,961 SY | $1.60 | $2.00 | $1.00 | $0.90 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (MASH) | 3 EACH | $2,400 | $2,500 | $2,400 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,150 | $1,200 | $1,150 | $1,150 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,150 | $2,200 | $2,150 | $2,150 |
| 623E38500 MONUMENT ASSEMBLY | 1 EACH | $520 | $800 | $2,000 | $2,800 |
| 623E40500 REFERENCE MONUMENT | 6 EACH | $200 | $400 | $850 | $1,700 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 4 EACH | $25.00 | $225 | $400 | $250 |
| 659E00300 TOPSOIL | 305 CY | $20.00 | $15.00 | $50.00 | $20.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 2,669 SY | $1.50 | $2.50 | $1.70 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 138 SY | $0.05 | $0.05 | $1.70 | $2.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.62 TON | $1,200 | $1,000 | $1,400 | $1,400 |
| 659E31000 LIME | 0.57 ACRE | $1,200 | $100 | $100 | $450 |
| 659E35000 WATER | 23 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 206 SY | $4.00 | $3.00 | $3.00 | $2.50 |
| 670E00730 DITCH EROSION PROTECTION MAT, TYPE C | 79 SY | $4.50 | $3.00 | $5.00 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,800 | $2,000 | $1,455 | $1,455 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $12,500 | $6,000 | $4,560 | $3,800 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,000 | $6,000 | $7,500 | $6,000 |
| 832E30000 EROSION CONTROL | 13,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 24 SY | $14.00 | $5.00 | $18.00 | $2.50 |
| 601E11000 RIPRAP, TYPE D | 3.5 SY | $645 | $350 | $525 | $850 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 32 SY | $47.00 | $100 | $60.00 | $85.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 7.33 CY | $103 | $120 | $135 | $171 |
| 601E32304 ROCK CHANNEL PROTECTION, TYPE D WITH GEOTEXTILE FA | 10 CY | $94.00 | $120 | $120 | $115 |
| 602E20000 CONCRETE MASONRY | 3.2 CY | $2,615 | $1,600 | $2,700 | $1,300 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 791 FT | $11.00 | $17.50 | $20.00 | $18.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 69 FT | $14.60 | $17.50 | $20.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 90 FT | $19.00 | $15.00 | $20.00 | $25.50 |
| 611E05700 15" CONDUIT, TYPE A, 706.01, 706.02, 707.01 (0.064 | 73 FT | $89.00 | $65.00 | $100 | $90.00 |
| 611E98230 CATCH BASIN, NO. 4 | 1 EACH | $5,065 | $4,500 | $6,500 | $7,800 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,535 | $1,500 | $3,800 | $1,900 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,154 | $3,000 | $6,000 | $2,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $290 | $200 | $300 | $550 |
| 407E10000 TACK COAT | 163 GAL | $5.00 | $5.00 | $5.00 | $6.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 139 CY | $77.00 | $85.00 | $95.00 | $80.00 |
| 621E00100 RPM CENTERLINE | 16 EACH | $175 | $129 | $175 | $175 |
| 621E00100 RPM EDGE LINE | 2 EACH | $175 | $129 | $175 | $175 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 16 EACH | $8.00 | $1.00 | $30.00 | $12.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 7 EACH | $56.00 | $100 | $50.00 | $35.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.3 MILE | $4,200 | $4,500 | $4,200 | $4,200 |
| 642E00300 CENTER LINE, TYPE 1 | 0.12 MILE | $9,400 | $9,000 | $9,400 | $9,400 |
| 642E00500 STOP LINE, TYPE 1 | 37 FT | $14.00 | $25.00 | $14.00 | $14.00 |
| 253E02000 PAVEMENT REPAIR | 30 CY | $283 | $185 | $86.00 | $400 |
| 407E10000 TACK COAT | 60 GAL | $5.00 | $5.00 | $5.00 | $27.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $77.00 | $60.00 | $75.00 | $69.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 10 CY | $77.00 | $60.00 | $75.00 | $74.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 30 CY | $283 | $185 | $320 | $335 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $85.00 | $40.00 | $65.00 | $65.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $12,250 | $15,000 | $6,110 | $14,700 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 5 EACH | $12.50 | $25.00 | $9.00 | $17.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 5 EACH | $12.50 | $25.00 | $13.00 | $26.50 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.17 MILE | $20,750 | $15,000 | $20,750 | $20,750 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.4 MILE | $9,250 | $10,000 | $9,250 | $9,250 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 21 FT | $14.00 | $41.00 | $14.00 | $14.00 |
| 616E10000 WATER | 15 MGAL | $1.00 | $1.00 | $1.00 | $40.00 |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $10,000 | $37,500 | $24,000 | $61,500 |
| 202E23500 WEARING COURSE REMOVED | 109 SY | $2.50 | $10.00 | $26.00 | $25.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 279 CY | $21.00 | $30.00 | $55.00 | $250 |
| 503E31120 SHALE EXCAVATION | 86 CY | $25.00 | $40.00 | $55.00 | $38.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 248 SY | $23.00 | $30.00 | $23.00 | $28.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 37 SF | $6.50 | $20.00 | $15.00 | $15.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 81 FT | $48.00 | $37.50 | $40.00 | $31.90 |
| 516E41100 1/8" PREFORMED BEARING PAD | 16 EACH | $47.00 | $25.00 | $75.00 | $50.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 32 EACH | $189 | $150 | $170 | $200 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 128 CY | $88.00 | $80.00 | $105 | $140 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 131 FT | $18.00 | $20.00 | $20.00 | $20.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 143 FT | $3.50 | $20.00 | $8.00 | $10.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 105 FT | $3.60 | $20.00 | $8.00 | $20.00 |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 75 FT | $115 | $200 | $290 | $160 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,297 | $35,000 | $9,500 | $8,500 |
| 619E16000 FIELD OFFICE, TYPE A | 5 MNTH | $1,500 | $750 | $2,600 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,700 | $20,000 | $20,000 | $9,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $20,000 | $160k | 12% |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 215 SY | $422 | $91k | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 318 CY | $250 | $80k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $76,500 | $77k | 6% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 154 CY | $462 | $71k | 5% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 65 CY | $1,080 | $70k | 5% |
| 517E70101 RAILING (THREE STEEL TUBE BRIDGE RAILING), AS PER | 140 FT | $472.5 | $66k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 29,951 LB | $2 | $60k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $58,700 | $59k | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 182 CY | $283 | $52k | 4% |