ATB-US 6/SR 7-20.28/VAR
ATB County · est $1.6M
Bid dateThursday, April 13—
ATB County · est $1.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Koski Construction CO | % of bid |
|---|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1920 CY | $235 | $280 | $296 | 37% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1236 CY | $165 | $240 | $250 | 17% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $79,225 | $120,000 | $125,000 | 6% |
| 424E14101 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (202 CY | $255 | $280 | $300 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,200 SY | $40.00 | $55.00 | $65.00 | 4% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T = 1 | 46,453 SY | $1.00 | $1.10 | $2.75 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $45,000 |
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Koski Construction CO |
|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 19 SY | $40.00 | $125 | $1,100 |
| 202E32000 CURB REMOVED | 198 FT | $20.00 | $30.00 | $17.50 |
| 209E60200 LINEAR GRADING | 421 STA | $25.00 | $25.00 | $55.00 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 126 STA | $25.00 | $65.00 | $40.00 |
| 608E10000 4" CONCRETE WALK | 640 SF | $12.00 | $10.00 | $18.00 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $87,906 |
| $85,000 |
| 4% |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (202 CY | $220 | $220 | $275 | 4% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,050 | $9,050 | $11,500 | 3% |
| 608E52000 CURB RAMP | 1,197 SF | $24.00 | $20.00 | $25.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 8,133 GAL | $3.00 | $3.00 | $4.25 | 2% |
| 646E10010 EDGE LINE, 6" | 8 MILE | $2,999 | $2,999 | $3,200 | 2% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 24 SNMT | $975 | $975 | $950 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3) | 22,247 SY | $1.00 | $2.25 | $4.25 | 2% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 12 EACH | $1,850 | $1,600 | $1,800 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 155 CY | $125 | $142 | $180 | 2% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $8,750 | $8,750 | $11,500 | 1% |
| 646E10200 CENTER LINE | 4.92 MILE | $3,139 | $3,139 | $5,000 | 1% |
| 202E30000 WALK REMOVED | 1,837 SF | $7.00 | $6.00 | $26.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,660 | $15,000 | $25,000 | 1% |
| 2 EACH |
| $1,420 |
| $1,500 |
| $2,000 |
| 690E21000 SPECIAL - AS-BUILT CONSTRUCTION RECORD DRAWINGS | 1 LS | $1,500 | $2,500 | $20,000 |
| 659E10000 SEEDING AND MULCHING | 11,695 SY | $0.65 | $0.75 | $1.80 |
| 659E20000 COMMERCIAL FERTILIZER | 1.58 TON | $600 | $1,200 | $1,200 |
| 659E31000 LIME | 2.41 ACRE | $1.00 | $0.50 | $0.01 |
| 659E35000 WATER | 63.15 MGAL | $1.00 | $0.05 | $0.01 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 8 EACH | $1,200 | $1,800 | $2,000 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 3 EACH | $1,840 | $2,500 | $2,500 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 3 EACH | $1,850 | $2,200 | $2,500 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 1 EACH | $550 | $2,000 | $2,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 700 LB | $4.00 | $3.50 | $5.00 |
| 254E01600 PATCHING PLANED SURFACE | 1,000 SY | $1.00 | $0.25 | $12.50 |
| 407E13900 TACK COAT, 702.13 | 592 GAL | $3.00 | $3.00 | $4.25 |
| 408E10001 PRIME COAT, AS PER PLAN | 1,113 GAL | $3.00 | $6.60 | $6.00 |
| 609E26000 CURB, TYPE 6 | 198 FT | $30.00 | $85.00 | $45.00 |
| 897E01011 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, AS PE | 6,721 SY | $1.00 | $2.00 | $4.50 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 1 EACH | $3,525 | $2,895 | $6,000 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $1,325 | $1,500 | $2,000 |
| 621E00100 RPM | 280 EACH | $41.00 | $36.60 | $47.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 224 EACH | $1.00 | $1.00 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 44 FT | $19.00 | $18.84 | $28.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $34.00 | $33.68 | $55.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $78.00 | $77.81 | $35.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $15.00 | $14.94 | $55.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $20.00 | $19.92 | $55.00 |
| 646E10400 STOP LINE | 27 FT | $12.00 | $12.00 | $15.00 |
| 646E10510 CROSSWALK LINE, 12" | 288 FT | $5.50 | $5.50 | $12.00 |
| 646E10520 CROSSWALK LINE, 24" | 44 FT | $12.00 | $12.00 | $15.00 |
| 646E20100 SCHOOL SYMBOL MARKING, 72" | 2 EACH | $575 | $575 | $725 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $85.00 | $85.00 | $100 |
| 614E12460 WORK ZONE MARKING SIGN, (ALL PHASES) | 17 EACH | $125 | $125 | $90.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $150 | $275 | $400 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 7.75 MILE | $1,275 | $1,275 | $1,200 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.92 MILE | $1,100 | $1,100 | $1,200 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 20.74 MILE | $555 | $555 | $600 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 54 FT | $3.00 | $3.00 | $5.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 27 FT | $3.00 | $3.00 | $4.00 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $1,500 | $1,000 | $1,500 |
| 601E25000 DUMPED ROCK FILL, TYPE A (36" Depth) | 15 CY | $450 | $350 | $500 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $2,000 | $2,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,650 | $5,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1920 CY | $235 | $451k | 32% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1236 CY | $165 | $204k | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $79,225 | $79k | 6% |
| 424E14101 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (202 CY | $255 | $52k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,200 SY | $40 | $48k | 3% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T = 1 | 46,453 SY | $1 | $46k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $45,000 | $45k | 3% |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (202 CY | $220 | $44k | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,050 | $36k | 3% |