CLE-US 52/SR 232-12.89/01.54
CLE County · est $0.4M
Bid dateThursday, April 13—
CLE County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Bcc Ohio INC | R3Sunesis Construction CO | R4John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|
| 601E11001 RIPRAP, TYPE D, AS PER PLAN | 614 SY | $175 | $217 | $322 | $226 | 27% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $26,735 | $46,603 | $20,000 | 10% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 122 FT | $300 | $71.93 | $565 | $732 | 9% |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $35,000 | $37,745 | $3,016 | $12,233 | 9% |
| 511E34418 CLASS QC SCC CONCRETE WITH QC/QA, SUPERSTRUCTURE | 7 CY | $3,600 | $2,232 | $3,590 | $5,171 | 6% |
| 503E21302 UNCLASSIFIED EXCAVATION, INCLUDING SHALE | 1 LS | $25,000 | $39,075 | $18,399 | $958 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Bcc Ohio INC | R3Sunesis Construction CO | R4John R Jurgensen Company |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 200 FT | $10.00 | $7.88 | $5.00 | $2.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 2 EACH | $600 | $341 | $748 | $325 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $500 | $99.75 | $250 | $95.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 10 CY | $150 | $140 | $65.00 | $85.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 101 CY | $200 | $147 | $368 | $225 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $6,016 | $12,575 | $29,086 | 5% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $10,000 | $10,080 | $1,725 | $4,125 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $33,803 | $56,011 | $27,385 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $47,160 | $6,468 | $48,321 | 2% |
| 519E11100 PATCHING CONCRETE STRUCTURE | 36 SF | $260 | $141 | $260 | $260 | 2% |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 1,205 LB | $7.00 | $5.63 | $6.44 | $7.69 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,700 | $2,814 | $2,700 | $2,680 | 2% |
| 659E10000 SEEDING AND MULCHING | 3,900 SY | $2.00 | $2.36 | $2.36 | $1.75 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $6,517 | $4,371 | $4,145 | 2% |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 254 EACH | $25.00 | $27.27 | $24.11 | $28.49 | 2% |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 50 FT | $120 | $106 | $169 | $160 | 1% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,400 | $1,465 | $1,600 | $1,395 | 1% |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 40 CY | $140 | $252 | $307 | $209 | 1% |
| 1 LS |
| $5,000 |
| $33,803 |
| $23,797 |
| $22,880 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $4,000 | $15,000 | $41,810 | $103,840 |
| 606E15050 GUARDRAIL, TYPE MGS | 62.5 FT | $24.00 | $27.72 | $28.00 | $26.40 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 150 FT | $28.00 | $30.24 | $31.00 | $28.80 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 2 EACH | $225 | $194 | $138 | $695 |
| 659E20000 COMMERCIAL FERTILIZER | 0.53 TON | $1,400 | $557 | $1,500 | $1,500 |
| 659E31000 LIME | 0.8 ACRE | $100 | $23.62 | $200 | $200 |
| 659E35000 WATER | 21.1 MGAL | $1.00 | $1.05 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E10400 24" CONDUIT, TYPE B | 1 FT | $2,000 | $2,940 | $608 | $718 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BI-DIRECTIONAL | 6 EACH | $10.00 | $13.13 | $10.00 | $12.50 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 125 LB | $10.00 | $15.68 | $11.31 | $10.88 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 222 EACH | $25.00 | $27.58 | $25.63 | $28.73 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 21 SF | $28.00 | $4.80 | $6.45 | $66.25 |
| 516E31000 JOINT SEALER | 42 FT | $75.00 | $15.60 | $10.01 | $13.16 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $10.00 | $5.07 | $8.94 | $51.77 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 130 SY | $35.00 | $43.01 | $41.00 | $41.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 130 SY | $15.00 | $18.60 | $35.00 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 5.5 SF | $34.00 | $31.77 | $7.72 | $83.09 |
| 516E31000 JOINT SEALER | 11 FT | $160 | $45.71 | $32.24 | $24.04 |
| 690E98000 SPECIAL - DOWEL HOLES WITH BOLT AND MECHANICAL ANC | 49 EACH | $25.00 | $58.50 | $32.88 | $37.43 |
| 690E99400 SPECIAL - FIELD INJECTION OF EXISTING JOINTS WITH | 10 LB | $95.00 | $390 | $497 | $8.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E11001 RIPRAP, TYPE D, AS PER PLAN | 614 SY | $175 | $107k | 24% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 9% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 122 FT | $300 | $37k | 8% |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $35,000 | $35k | 8% |
| 511E34418 CLASS QC SCC CONCRETE WITH QC/QA, SUPERSTRUCTURE | 7 CY | $3,600 | $25k | 6% |
| 503E21302 UNCLASSIFIED EXCAVATION, INCLUDING SHALE | 1 LS | $25,000 | $25k | 6% |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 101 CY | $200 | $20k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $20k | 4% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $10,000 | $10k | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $10k | 2% |