Figure 0.1 · BRIEFING BID #230218 · ODOT RESULT · awarded Apr 13 HEN-SR 110-06.72 Resurfacing HEN County · est $1.7M
Bid date Thursday, April 13 —
Project scope Bid form · ODOT
51 ITEMS Guardrail & Barrier 20% Maintaining Traffic 14% Earthwork 10% Asphalt Paving 10% Structures / Bridge 10% Pavement Marking 10% Other Item Quantity R1 Shelly Company R2 Gerken Paving INC % of bid 253E02000 PAVEMENT REPAIR 3,123 CY $200 $211 36% 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS 2,644 CY $208 $193 32% 617E10100 COMPACTED AGGREGATE 1,887 CY $63.00 $60.00 7% 614E11000 MAINTAINING TRAFFIC 1 LS $100,000 $95,000 6% 624E10000 MOBILIZATION 1 LS $75,000 $40,000 4% 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" 61,281 SY $1.06 $1.50 4% 623E39600 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE 33 EACH $1,000 $2,150 2% 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS 1,300 FT $20.40 $20.40 2% 203E20000 EMBANKMENT 300 CY $67.50 $67.50 1% 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG 95 CY $208 $375 1% 518E22300 SPECIAL - STEEL DRIP STRIP 384 FT $40.00 $11.00 1% 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING 7.12 MILE $2,000 $1,400 1% 407E10000 TACK COAT 5,345 GAL $2.50 $2.40 1% 621E00100 RPM 260 EACH $42.40 $42.40 1% 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH2016 4 EACH $2,540 $2,540 1% 832E30000 EROSION CONTROL 10,000 EACH $1.00 $1.00 1% 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION 100 CY $87.00 $87.00 1% 642E00300 CENTER LINE, TYPE 1 9 MILE $850 $850 0% 209E60500 LINEAR GRADING 8 MILE $850 $1,250 0% 642E00104 EDGE LINE, 6", TYPE 1 7.9 MILE $850 $850 0%
Show all 51 line items Item Quantity R1 Shelly Company R2 Gerken Paving INC 202E38000 GUARDRAIL REMOVED 1,313 FT $2.00 $2.00 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E 4 EACH $125 $125 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T 4 EACH $95.00 $95.00 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED 4 EACH $65.00 $65.00 209E15000 RESHAPING UNDER GUARDRAIL 17 STA $40.00 $40.00 606E26550 ANCHOR ASSEMBLY, MGS TYPE T 4 EACH $1,380 $1,380 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4
Project details
Description HEN-SR 110-06.72 Resurfacing
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →