SEN-/HAN-US 23/SR 12-11.88/27.92
SEN County · est $1.4M
Bid dateThursday, May 25—
SEN County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Gerken Paving INC | R2Shelly Company | % of bid |
|---|---|---|---|---|
| 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 1,585 CY | $202 | $350 | 23% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,189 CY | $230 | $370 | 20% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,320 SY | $205 | $285 | 20% |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (3.5") | 28,521 SY | $3.55 | $5.50 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $79,000 | $200,000 | 6% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 31 EACH | $1,725 | $1,500 | 4% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 43 EACH | $1,100 | $1,500 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $180,000 | 3% |
| 608E52000 CURB RAMP | 2,192 SF | $17.00 | $30.00 | 3% |
| 608E10000 4" CONCRETE WALK | 1,576 SF | $17.00 | $30.00 | 2% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 5,940 FT | $4.25 | $5.00 | 2% |
| 609E26000 CURB, TYPE 6 | 487 FT | $40.00 | $45.00 | 1% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 323 FT | $55.00 | $45.00 | 1% |
| 202E30000 WALK REMOVED | 3,681 SF | $4.00 | $3.00 | 1% |
| 644E00630 CROSSWALK LINE, 24" | 1,408 FT | $8.00 | $6.00 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 3,037 LB | $3.35 | $1.00 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $20,000 | 1% |
| 632E26500 DETECTOR LOOP | 3 EACH | $2,580 | $2,580 | 1% |
| 407E10000 TACK COAT | 2,424 GAL | $2.50 | $3.00 | 0% |
| Item | Quantity | R1Gerken Paving INC | R2Shelly Company |
|---|---|---|---|
| 202E30001 WALK REMOVED, AS PER PLAN | 87 SF | $9.00 | $3.00 |
| 202E32000 CURB REMOVED | 487 FT | $12.00 | $12.00 |
| 202E32500 CURB AND GUTTER REMOVED | 323 FT | $14.00 | $12.00 |
| 659E00300 TOPSOIL | 91 CY | $65.00 | $75.00 |
| 659E10000 SEEDING AND MULCHING | 818 SY | $3.16 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 41 SY | $3.16 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $680 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 659E31000 LIME | 0.17 ACRE | $30.00 | $100 |
| 659E35000 WATER | 4 MGAL | $1.00 | $100 |
| 407E20000 NON-TRACKING TACK COAT | 1,569 GAL | $2.50 | $3.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $710 | $800 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 121 FT | $20.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 102 SF | $20.00 | $21.00 |
| 630E81100 SIGN ERECTED, FLAT SHEET | 102 SF | $7.50 | $9.00 |
| 644E00104 EDGE LINE, 6", YELLOW | 0.07 MILE | $8,000 | $25,000 |
| 644E00204 LANE LINE, 6" | 1.27 MILE | $3,500 | $2,500 |
| 644E00300 CENTER LINE, DOUBLE SOLID | 0.38 MILE | $10,000 | $12,000 |
| 644E00400 CHANNELIZING LINE, 8" | 1,514 FT | $2.00 | $2.00 |
| 644E00500 STOP LINE | 175 FT | $8.00 | $8.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 359 FT | $8.00 | $8.00 |
| 644E00720 CHEVRON MARKING | 86 FT | $8.00 | $8.00 |
| 644E01300 LANE ARROW | 28 EACH | $100 | $100 |
| 644E01510 DOTTED LINE, 6", WHITE | 136 FT | $3.00 | $2.00 |
| 644E01510 DOTTED LINE, 6", YELLOW | 59 FT | $3.00 | $2.00 |
| 614E12460 WORK ZONE MARKING SIGN | 15 EACH | $115 | $100 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $120 | $192 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $55.00 | $56.00 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 1.27 MILE | $1,000 | $1,250 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.27 MILE | $1,000 | $1,250 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.38 MILE | $1,000 | $2,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.38 MILE | $1,000 | $2,500 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.07 MILE | $900 | $1,800 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.07 MILE | $900 | $1,800 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 1,514 FT | $1.00 | $1.00 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,514 FT | $1.00 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 175 FT | $4.00 | $4.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 28 EACH | $60.00 | $40.00 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $5,000 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,510 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 1,585 CY | $202 | $320k | 22% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,189 CY | $230 | $273k | 19% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,320 SY | $205 | $271k | 19% |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (3.5") | 28,521 SY | $3.55 | $101k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $79,000 | $79k | 5% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 31 EACH | $1,725 | $53k | 4% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 43 EACH | $1,100 | $47k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40k | 3% |
| 608E52000 CURB RAMP | 2,192 SF | $17 | $37k | 3% |
| 608E10000 4" CONCRETE WALK | 1,576 SF | $17 | $27k | 2% |