POR-/STA Culverts FY2023
POR County · est $0.8M
Bid dateThursday, May 25—
POR County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 79 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Rudzik Excavating INC | R3Matt Winters Excavation LLC | R4Shelly & Sands INC | R5Digioia-suburban Excavating LLC | R6S E T INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 235 CY | $360 | $396 | $500 | $385 | $685 | $470 | 18% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 213 CY | $270 | $297 | $250 | $535 | $605 | $420 | 12% |
| 624E10000 MOBILIZATION | 1 LS | $32,535 | $96,544 | $54,500 | $20,000 |
| Item | Quantity | R1Eclipse CO LLC | R2Rudzik Excavating INC | R3Matt Winters Excavation LLC | R4Shelly & Sands INC | R5Digioia-suburban Excavating LLC | R6S E T INC |
|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $1,500 | $2,750 | $1,800 | $2,000 | $3,500 | $20,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $2,000 | $2,250 | $2,500 | $2,000 | $3,500 | $20,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $1,750 | $3,000 | $1,800 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $35,400 |
| $100,000 |
| 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $22,552 | $22,177 | $19,920 | $25,000 | $100,000 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 2,645 SY | $8.00 | $10.80 | $15.00 | $20.00 | $15.00 | $10.50 | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $20,000 | $32,868 | $5,000 | $6,000 | $55,000 | $20,000 | 4% |
| 611E16600 36" CONDUIT, TYPE C | 126 FT | $146 | $345 | $290 | $286 | $165 | $300 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (POR-44-2349) | 1 LS | $18,000 | $2,250 | $3,500 | $4,500 | $2,000 | $30,000 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (POR-14-2848) | 1 LS | $16,000 | $9,200 | $4,500 | $4,500 | $2,000 | $50,000 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (POR-44-1533) | 1 LS | $16,000 | $2,000 | $3,000 | $4,500 | $8,000 | $20,000 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (POR-700-0400) | 1 LS | $16,000 | $2,000 | $2,500 | $4,500 | $2,000 | $30,000 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (STA-172-0025) | 1 LS | $16,000 | $750 | $2,500 | $4,500 | $3,000 | $30,000 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (STA-241-1177) | 1 LS | $16,000 | $2,000 | $3,500 | $4,500 | $3,000 | $50,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $16,000 | $15,460 | $7,370 | $17,000 | $15,000 | $15,000 | 3% |
| 611E19200 42" CONDUIT, TYPE A, 706.02, (707.01 OR 707.02) AL | 87 FT | $172 | $385 | $325 | $341 | $365 | $440 | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 589 FT | $25.00 | $27.00 | $33.50 | $27.00 | $30.00 | $28.00 | 3% |
| 611E10400 24" CONDUIT, TYPE B | 84 FT | $172 | $365 | $195 | $315 | $200 | $260 | 3% |
| 203E10000 EXCAVATION | 304 CY | $43.00 | $40.00 | $30.00 | $72.00 | $25.00 | $35.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,000 | $9,200 | $35,000 | $4,500 | $7,500 | $12,000 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $774 | $450 | $1,273 | $1,100 | $1,050 | $1,000 | 3% |
| $2,000 |
| $3,500 |
| $20,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $1,500 | $1,750 | $3,500 | $2,000 | $3,500 | $20,000 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $3,000 | $2,000 | $1,800 | $2,000 | $3,500 | $20,000 |
| 202E23000 PAVEMENT REMOVED | 617 SY | $12.00 | $9.00 | $15.00 | $32.00 | $10.00 | $18.00 |
| 202E32000 CURB REMOVED | 40 FT | $20.00 | $5.00 | $14.50 | $22.00 | $8.00 | $12.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 187 FT | $15.00 | $15.00 | $50.00 | $9.00 | $16.00 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 275 FT | $17.00 | $15.00 | $60.00 | $24.00 | $120 | $75.00 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $510 | $800 | $2,500 | $984 | $500 | $1,400 |
| 202E58100 CATCH BASIN REMOVED | 5 EACH | $510 | $500 | $500 | $550 | $400 | $900 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 6 EACH | $185 | $50.00 | $775 | $485 | $125 | $250 |
| 202E98200 REMOVAL MISC.: CONDUIT | 60 FT | $18.00 | $10.00 | $40.00 | $20.00 | $10.00 | $40.00 |
| 203E20000 EMBANKMENT | 341 CY | $31.00 | $50.00 | $53.00 | $40.00 | $28.00 | $55.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 18 CY | $79.00 | $40.00 | $80.00 | $43.00 | $12.00 | $100 |
| 204E10000 SUBGRADE COMPACTION | 617 SY | $1.00 | $5.00 | $13.00 | $8.00 | $6.00 | $4.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B (MASH 2016) | 2 EACH | $2,325 | $2,750 | $3,116 | $2,415 | $2,600 | $2,500 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,875 | $3,300 | $3,853 | $3,000 | $3,150 | $3,000 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,395 | $1,524 | $1,870 | $1,500 | $1,600 | $1,500 |
| 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $1,784 | $6,580 | $3,015 | $1,300 | $8,500 | $12,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION (POR-14-284 | 1 LS | $1,000 | $1,005 | $1,005 | $2,200 | $1,200 | $2,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION (POR-44-153 | 1 LS | $1,000 | $1,005 | $1,005 | $2,200 | $1,200 | $2,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION (POR-44-234 | 1 LS | $1,000 | $1,005 | $1,005 | $2,200 | $1,200 | $2,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION (POR-700-04 | 1 LS | $1,000 | $1,005 | $1,005 | $2,200 | $1,200 | $2,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION (STA-172-00 | 1 LS | $1,000 | $1,005 | $1,005 | $2,200 | $1,200 | $2,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION (STA-241-11 | 1 LS | $1,000 | $1,005 | $1,005 | $2,200 | $1,200 | $2,000 |
| 601E11000 RIPRAP, TYPE D | 5 SY | $857 | $450 | $228 | $1,000 | $200 | $400 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 15 CY | $150 | $240 | $315 | $300 | $145 | $350 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 6 CY | $846 | $300 | $290 | $251 | $125 | $400 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 10 CY | $170 | $250 | $210 | $330 | $155 | $400 |
| 659E00300 TOPSOIL | 135 CY | $62.00 | $30.00 | $70.00 | $110 | $65.00 | $90.00 |
| 659E10000 SEEDING AND MULCHING | 1,209 SY | $4.50 | $5.00 | $6.00 | $5.00 | $10.00 | $4.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $760 | $400 | $1,020 | $1,300 | $1,500 | $2,200 |
| 659E31000 LIME | 0.24 ACRE | $25.00 | $50.00 | $35.00 | $54.00 | $200 | $1,400 |
| 659E35000 WATER | 4.3 MGAL | $1.00 | $0.01 | $1.00 | $54.00 | $150 | $100 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 6 CY | $1,196 | $2,210 | $2,850 | $1,700 | $1,500 | $2,500 |
| 611E04400 12" CONDUIT, TYPE B | 60 FT | $71.00 | $115 | $130 | $100 | $60.00 | $200 |
| 611E04600 12" CONDUIT, TYPE C | 78 FT | $81.00 | $165 | $150 | $171 | $65.00 | $180 |
| 611E05100 12" CONDUIT, TYPE E | 60 FT | $61.00 | $73.00 | $155 | $100 | $40.00 | $160 |
| 611E05200 12" CONDUIT, TYPE F | 60 FT | $61.00 | $60.00 | $160 | $98.00 | $40.00 | $160 |
| 611E05900 15" CONDUIT, TYPE B | 42 FT | $89.00 | $305 | $180 | $184 | $195 | $190 |
| 611E13400 30" CONDUIT, TYPE B | 66 FT | $144 | $375 | $225 | $276 | $205 | $315 |
| 611E13600 30" CONDUIT, TYPE C | 12 FT | $175 | $400 | $360 | $365 | $140 | $305 |
| 611E16200 36" CONDUIT, TYPE A, 706.02, 707.04, 707.33 | 63 FT | $172 | $407 | $275 | $316 | $310 | $340 |
| 611E16400 36" CONDUIT, TYPE B | 67 FT | $163 | $470 | $280 | $372 | $410 | $350 |
| 611E97400 CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE CONT | 60 FT | $58.00 | $29.00 | $50.00 | $70.00 | $25.00 | $200 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 60 FT | $48.00 | $20.00 | $50.00 | $70.00 | $16.00 | $175 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 60 FT | $38.00 | $23.00 | $55.00 | $70.00 | $15.00 | $160 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 60 FT | $38.00 | $19.00 | $60.00 | $70.00 | $15.00 | $160 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $4,750 | $4,090 | $3,560 | $3,430 | $3,500 | $5,000 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $4,000 | $2,385 | $3,450 | $2,000 | $2,200 | $4,000 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $4,500 | $3,945 | $3,800 | $2,520 | $2,600 | $4,500 |
| 611E98540 CATCH BASIN, NO. 2-4 | 2 EACH | $4,000 | $5,160 | $5,390 | $3,730 | $3,500 | $6,500 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $12,000 | $15,400 | $11,030 | $9,000 | $8,000 | $14,000 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $994 | $650 | $975 | $1,500 | $400 | $1,500 |
| 611E99720 INSPECTION WELL | 6 EACH | $604 | $300 | $1,175 | $715 | $225 | $1,500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 688 FT | $4.00 | $5.00 | $20.00 | $3.00 | $6.50 | $3.25 |
| 304E20000 AGGREGATE BASE | 116 CY | $95.00 | $105 | $100 | $205 | $75.00 | $150 |
| 407E20000 NON-TRACKING TACK COAT | 345 GAL | $9.00 | $10.00 | $4.00 | $3.05 | $3.00 | $2.25 |
| 408E10001 PRIME COAT, AS PER PLAN | 49 GAL | $20.00 | $22.00 | $25.00 | $3.50 | $8.00 | $5.50 |
| 609E26000 CURB, TYPE 6 | 40 FT | $26.00 | $50.00 | $50.00 | $184 | $95.00 | $50.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 8 CY | $382 | $165 | $225 | $706 | $380 | $240 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 75 FT | $7.45 | $32.00 | $40.00 | $32.00 | $55.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 10 SF | $34.00 | $50.00 | $60.00 | $50.00 | $85.00 | $85.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $23.00 | $10.00 | $20.00 | $11.00 | $40.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $25.00 | $20.00 | $27.00 | $22.00 | $20.00 | $40.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.23 MILE | $26,500 | $6,000 | $7,320 | $5,900 | $6,000 | $6,000 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.02 MILE | $26,000 | $10,450 | $1,215 | $10,200 | $10,500 | $10,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.13 MILE | $26,700 | $7,950 | $9,680 | $7,800 | $8,000 | $7,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $68.00 | $70.00 | $114 | $92.00 | $80.00 | $85.00 |
| 614E12420 DETOUR SIGNING (POR-14-2848) | 1 LS | $5,085 | $5,025 | $4,020 | $4,500 | $5,200 | $5,000 |
| 614E12420 DETOUR SIGNING (POR-44-1533) | 1 LS | $5,065 | $5,725 | $4,190 | $5,000 | $6,000 | $5,500 |
| 614E12420 DETOUR SIGNING (POR-44-2349) | 1 LS | $6,850 | $6,952 | $5,360 | $6,400 | $7,200 | $6,500 |
| 614E12420 DETOUR SIGNING (POR-700-0400) | 1 LS | $6,955 | $4,664 | $4,190 | $4,400 | $5,000 | $4,500 |
| 614E12420 DETOUR SIGNING (STA-172-0025) | 1 LS | $6,515 | $7,080 | $5,360 | $6,500 | $7,500 | $6,500 |
| 614E12420 DETOUR SIGNING (STA-241-1177) | 1 LS | $6,125 | $5,335 | $4,400 | $5,000 | $5,500 | $5,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $275 | $200 | $335 | $175 | $250 | $350 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $684 | $1,650 | $2,479 | $4,330 | $2,500 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 235 CY | $360 | $85k | 11% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 213 CY | $270 | $58k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $32,535 | $33k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 2,645 SY | $8 | $21k | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $20,000 | $20k | 3% |
| 611E16600 36" CONDUIT, TYPE C | 126 FT | $146 | $18k | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (POR-44-2349) | 1 LS | $18,000 | $18k | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (POR-14-2848) | 1 LS | $16,000 | $16k | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (POR-44-1533) | 1 LS | $16,000 | $16k | 2% |