ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 65 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Buds INC | R3George J Igel & CO INC | R4R C Construction Company And Son INC | R5Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 515E10070 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 6 EACH | $24,200 | $30,000 | $32,000 | $28,000 | $26,000 | 21% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 109 CY | $1,038 | $825 | $930 | $750 | $1,050 | 16% |
| 203E20000 EMBANKMENT | 1,708 CY | $29.00 | $38.00 | $30.00 | $25.00 | $20.00 | 7% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 107 SY | $435 | $390 | $375 | $225 | $450 | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 120 CY | $300 | $300 | $315 | $425 | $300 | 5% |
| Item | Quantity | R1Shelly & Sands INC | R2Buds INC | R3George J Igel & CO INC | R4R C Construction Company And Son INC | R5Complete General Construction Company |
|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $1,300 | $6,500 | $20,000 | $22,500 | $20,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 23 FT | $18.00 | $65.00 | $18.00 | $100 | $50.00 |
| 202E75000 FENCE REMOVED | 533 FT | $3.00 | $8.00 | $4.00 | $20.00 | $5.00 |
| 202E75250 GATE REMOVED | 1 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 165 FT |
| $212 |
| $212 |
| $243 |
| $235 |
| $265 |
| 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $30,000 | $7,000 | $100 | $19,500 | $235,000 | 4% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 61 FT | $490 | $450 | $380 | $400 | $530 | 4% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 38 CF | $725 | $450 | $505 | $395 | $450 | 4% |
| 304E20000 AGGREGATE BASE | 223 CY | $100 | $112 | $110 | $125 | $104 | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $22,000 | $25,000 | $70,000 | $15,000 | $65,000 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $22,000 | $6,000 | $32,000 | $12,500 | $60,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $18,000 | $20,000 | $45,000 | $40,000 | 3% |
| 203E10000 EXCAVATION | 855 CY | $21.00 | $27.00 | $25.00 | $25.00 | $15.00 | 3% |
| 524E94704 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK | 56 FT | $300 | $485 | $370 | $400 | $670 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 9,468 LB | $1.63 | $1.32 | $2.00 | $3.50 | $2.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $6,500 | $11,000 | $12,500 | $4,000 | 2% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 35 CY | $425 | $425 | $450 | $495 | $425 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 34 CY | $425 | $425 | $450 | $495 | $425 | 2% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (47 CY | $300 | $300 | $315 | $495 | $300 | 2% |
| $75.00 |
| $150 |
| $130 |
| $1,000 |
| $220 |
| 204E10000 SUBGRADE COMPACTION | 1,253 SY | $4.00 | $6.25 | $5.00 | $2.00 | $9.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 50 CY | $12.00 | $28.00 | $15.00 | $25.00 | $20.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 50 CY | $90.00 | $95.00 | $69.00 | $65.00 | $75.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $207 | $100 | $112 | $100 | $350 |
| 204E50000 GEOTEXTILE FABRIC | 50 SY | $6.00 | $2.50 | $3.00 | $10.00 | $5.00 |
| 204E51000 GEOGRID | 50 SY | $7.00 | $5.00 | $5.00 | $25.00 | $15.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 351 FT | $20.50 | $20.50 | $25.12 | $30.00 | $25.12 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 3 EACH | $1,550 | $1,550 | $1,350 | $1,400 | $1,350 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,250 | $1,250 | $1,050 | $1,100 | $1,050 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,450 | $2,450 | $1,890 | $1,950 | $1,890 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 5 CY | $160 | $132 | $130 | $125 | $195 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 144 CY | $92.00 | $112 | $110 | $125 | $195 |
| 659E00300 TOPSOIL | 28 CY | $53.00 | $45.00 | $23.00 | $25.00 | $15.00 |
| 659E10000 SEEDING AND MULCHING | 1,598 SY | $1.98 | $2.00 | $3.40 | $4.00 | $1.65 |
| 659E14000 REPAIR SEEDING AND MULCHING | 80 SY | $1.79 | $0.01 | $2.65 | $0.20 | $2.65 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $899 | $800 | $1,400 | $1,950 | $1,400 |
| 659E31000 LIME | 0.33 ACRE | $158 | $600 | $100 | $1,250 | $100 |
| 659E35000 WATER | 9 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00730 DITCH EROSION PROTECTION MAT, TYPE C | 82 SY | $3.73 | $4.50 | $4.00 | $25.00 | $4.00 |
| 832E30000 EROSION CONTROL | 7,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 121 SY | $4.32 | $5.55 | $7.00 | $35.00 | $7.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $2,400 | $2,000 | $2,600 | $3,000 | $5,000 |
| 605E31100 AGGREGATE DRAINS | 76 FT | $19.00 | $35.00 | $53.00 | $40.00 | $15.00 |
| 611E00200 4" CONDUIT, TYPE C | 12 FT | $28.00 | $25.00 | $78.00 | $25.00 | $20.00 |
| 611E01800 8" CONDUIT, TYPE B | 25 FT | $27.00 | $15.00 | $35.00 | $35.00 | $20.00 |
| 611E02500 8" CONDUIT, TYPE E | 25 FT | $18.00 | $12.00 | $25.00 | $35.00 | $20.00 |
| 611E02600 8" CONDUIT, TYPE F | 25 FT | $18.00 | $12.00 | $25.00 | $35.00 | $20.00 |
| 611E10600 24" CONDUIT, TYPE C | 40 FT | $125 | $195 | $86.00 | $200 | $150 |
| 611E10900 24" CONDUIT, TYPE D | 60 FT | $105 | $185 | $83.00 | $200 | $150 |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $7,000 | $4,500 | $5,800 | $4,500 | $8,000 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3" DEPTH) | 91 SY | $35.00 | $35.00 | $60.00 | $65.00 | $125 |
| 407E20000 NON-TRACKING TACK COAT | 119 GAL | $3.25 | $3.25 | $3.25 | $25.00 | $3.25 |
| 617E10100 COMPACTED AGGREGATE | 32 CY | $130 | $130 | $110 | $125 | $95.00 |
| 617E20000 SHOULDER PREPARATION | 190 SY | $22.00 | $15.00 | $4.00 | $50.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 10 EACH | $10.00 | $10.00 | $11.00 | $25.00 | $11.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 44 FT | $12.50 | $12.50 | $15.00 | $30.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 44 FT | $15.00 | $15.00 | $16.00 | $45.00 | $16.00 |
| 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST | 12 FT | $15.00 | $15.00 | $30.00 | $50.00 | $30.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $45.00 | $45.00 | $35.00 | $150 | $35.00 |
| 630E80100 SIGN, FLAT SHEET | 35 SF | $22.00 | $25.00 | $30.00 | $35.00 | $30.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 1 EACH | $200 | $200 | $185 | $200 | $185 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $21.44 | $25.00 | $20.00 | $100 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $20.00 | $25.00 | $20.00 | $100 | $20.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.11 MILE | $10,250 | $11,000 | $10,250 | $15,000 | $10,250 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,500 | $6,000 | $10,000 | $12,500 | $4,500 |
| 616E10000 WATER | 6 MGAL | $50.00 | $1.00 | $38.00 | $1.00 | $75.00 |
| 202E23500 WEARING COURSE REMOVED | 89 SY | $8.00 | $28.00 | $25.00 | $65.00 | $95.00 |
| 407E13900 TACK COAT, 702.13 | 38 GAL | $3.25 | $5.00 | $3.25 | $30.00 | $10.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 117 SY | $48.00 | $25.00 | $48.00 | $75.00 | $48.00 |
| 512E33010 TYPE 3 WATERPROOFING | 215 SY | $36.50 | $35.00 | $38.00 | $45.00 | $36.50 |
| 512E44400 TYPE B WATERPROOFING | 14 SY | $42.00 | $155 | $124 | $100 | $25.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 143 SF | $7.00 | $12.00 | $9.00 | $25.00 | $15.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 24 EACH | $39.00 | $35.00 | $78.00 | $200 | $138 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 24 EACH | $213 | $225 | $270 | $200 | $188 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 53 CY | $110 | $165 | $145 | $125 | $200 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 91 FT | $14.75 | $15.00 | $15.00 | $25.00 | $14.75 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 111 FT | $10.00 | $15.00 | $12.00 | $25.00 | $20.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 44 FT | $10.00 | $25.00 | $20.00 | $25.00 | $15.00 |
| 526E90010 TYPE A INSTALLATION | 56 FT | $230 | $155 | $250 | $250 | $300 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,800 | $10,000 | $5,000 | $45,000 | $10,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,700 | $5,000 | $7,500 | $30,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E10070 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 6 EACH | $24,200 | $145k | 17% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 109 CY | $1,038 | $113k | 13% |
| 203E20000 EMBANKMENT | 1,708 CY | $29 | $50k | 6% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 107 SY | $435 | $47k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 120 CY | $300 | $36k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 165 FT | $212 | $35k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $30,000 | $30k | 3% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 61 FT | $490 | $30k | 3% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 38 CF | $725 | $28k | 3% |
| 304E20000 AGGREGATE BASE | 223 CY | $100 | $22k | 3% |