MOT-BH-FY24
MOT County · est $2.1M
Bid dateThursday, September 14—
MOT County · est $2.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 104 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Complete General Construction Company | R3Sunesis Construction CO | R4Brumbaugh Construction INC | R5Eagle Bridge CO | R6Catts Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $155,610 | $100,000 | $123,493 | $96,319 | $100,000 | $246,000 | 9% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 113 FT | $1,266 | $675 | $1,071 | $900 | $850 | $900 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $123,882 | $140,000 | $36,270 |
| Item | Quantity | R1Bcc Ohio INC | R2Complete General Construction Company | R3Sunesis Construction CO | R4Brumbaugh Construction INC | R5Eagle Bridge CO | R6Catts Construction INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $11,145 | $20,000 | $6,848 | $20,000 | $12,000 | $24,840 |
| 202E32000 CURB REMOVED | 80 FT | $11.55 | $25.00 | $8.00 | $5.00 | $30.00 | $23.00 |
| 202E38000 GUARDRAIL REMOVED | 791 FT | $2.10 | $8.00 | $10.00 | $7.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $100,000 |
| $135,000 |
| $221,000 |
| 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,680 FT | $21.00 | $17.00 | $20.00 | $20.00 | $23.00 | $25.00 | 7% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 213 CY | $551 | $950 | $529 | $750 | $525 | $1,168 | 7% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,225 SY | $85.25 | $115 | $114 | $100 | $165 | $70.00 | 6% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,225 SY | $76.46 | $65.00 | $86.00 | $125 | $95.00 | $90.00 | 5% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 997 SY | $88.15 | $70.00 | $81.00 | $125 | $90.00 | $100 | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 2,078 SF | $42.00 | $40.00 | $41.00 | $40.00 | $40.00 | $50.00 | 5% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 978 SY | $80.95 | $140 | $79.00 | $100 | $150 | $81.00 | 5% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 152 FT | $509 | $655 | $531 | $650 | $485 | $648 | 5% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 152 FT | $509 | $655 | $531 | $650 | $485 | $648 | 5% |
| 530E00600 SPECIAL - STRUCTURES, MISC.: ABUTMENT REFACING WIT | 995 SF | $73.47 | $80.00 | $97.00 | $95.00 | $120 | $227 | 4% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 564 SY | $117 | $100 | $132 | $125 | $170 | $129 | 4% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 533 SY | $124 | $105 | $138 | $125 | $175 | $126 | 4% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 520 SY | $93.33 | $165 | $82.00 | $100 | $120 | $102 | 3% |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 103 FT | $467 | $24.50 | $11.00 | $16.00 | $25.00 | $29.00 | 3% |
| 202E23500 WEARING COURSE REMOVED | 6,077 SY | $7.69 | $13.00 | $10.00 | $25.00 | $15.00 | $18.50 | 3% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 489 SY | $94.84 | $165 | $83.00 | $100 | $125 | $119 | 3% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 22 CY | $2,082 | $2,200 | $4,677 | $3,000 | $2,500 | $2,974 | 3% |
| $12.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 50 FT | $2.52 | $130 | $10.00 | $115 | $2.40 | $12.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $158 | $175 | $252 | $975 | $150 | $308 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 6 EACH | $99.75 | $150 | $252 | $745 | $95.00 | $308 |
| 203E10000 EXCAVATION | 15 CY | $46.20 | $65.00 | $92.00 | $75.00 | $150 | $55.00 |
| 203E20000 EMBANKMENT | 5 CY | $149 | $95.00 | $255 | $25.00 | $450 | $213 |
| 204E10000 SUBGRADE COMPACTION | 35 SY | $11.57 | $15.00 | $18.00 | $2.00 | $16.00 | $9.50 |
| 606E15050 GUARDRAIL, TYPE MGS | 726 FT | $19.95 | $29.00 | $31.00 | $30.00 | $19.00 | $38.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,331 | $2,300 | $2,895 | $2,400 | $2,220 | $3,540 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,762 | $2,650 | $2,669 | $2,700 | $2,630 | $3,260 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $1,386 | $1,325 | $1,636 | $1,350 | $1,320 | $2,000 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 8 EACH | $2,494 | $2,950 | $2,946 | $3,000 | $2,375 | $3,600 |
| 607E98000 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO | 105 FT | $13.09 | $14.50 | $6.00 | $20.00 | $15.00 | $12.00 |
| 659E10000 SEEDING AND MULCHING | 1,086 SY | $4.15 | $7.00 | $8.00 | $10.00 | $7.00 | $2.00 |
| 659E10100 SEEDING AND MULCHING FOR WILDLIFE | 78 SY | $7.09 | $10.00 | $10.00 | $12.00 | $50.00 | $4.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 60 SY | $1.31 | $20.00 | $20.00 | $2.00 | $4.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.16 TON | $872 | $1,000 | $1,007 | $600 | $1,500 | $860 |
| 659E35000 WATER | 6 MGAL | $1.05 | $20.00 | $20.00 | $5.00 | $15.00 | $33.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 6 CY | $6,381 | $2,325 | $667 | $750 | $600 | $2,860 |
| 304E20000 AGGREGATE BASE | 6 CY | $248 | $200 | $154 | $100 | $300 | $173 |
| 407E20000 NON-TRACKING TACK COAT | 428 GAL | $1.05 | $10.00 | $1.00 | $10.00 | $1.00 | $12.00 |
| 609E24510 CURB, TYPE 4-C | 80 FT | $18.75 | $80.00 | $61.00 | $50.00 | $75.00 | $101 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $30.00 | $100 | $1.00 | $50.00 | $60.00 | $124 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 21 EACH | $14.70 | $14.00 | $10.00 | $15.00 | $11.00 | $13.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 6 SF | $105 | $100 | $101 | $100 | $100 | $123 |
| 646E10010 EDGE LINE, 6" | 1.58 MILE | $13,634 | $12,985 | $13,076 | $13,250 | $12,985 | $15,975 |
| 646E10110 LANE LINE, 6" | 1.92 MILE | $4,878 | $4,645 | $4,678 | $4,700 | $4,645 | $5,715 |
| 646E10200 CENTER LINE | 0.37 MILE | $19,336 | $18,415 | $18,545 | $18,800 | $18,415 | $22,655 |
| 646E10300 CHANNELIZING LINE, 8" | 95 FT | $7.88 | $7.50 | $8.00 | $7.50 | $7.50 | $10.00 |
| 646E20300 LANE ARROW | 4 EACH | $788 | $750 | $755 | $800 | $750 | $925 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $89.25 | $85.00 | $81.00 | $90.00 | $135 | $80.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,415 | $2,300 | $2,316 | $1,700 | $2,500 | $2,830 |
| 614E12420 DETOUR SIGNING | 1 LS | $17,094 | $16,280 | $23,635 | $16,000 | $24,000 | $20,030 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 121 EACH | $14.70 | $14.00 | $14.00 | $14.00 | $12.00 | $17.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 121 EACH | $19.95 | $19.00 | $19.00 | $20.00 | $18.00 | $23.50 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.27 MILE | $3,071 | $2,925 | $2,946 | $3,000 | $2,925 | $3,600 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.28 MILE | $13,440 | $12,800 | $12,890 | $13,000 | $14,000 | $15,750 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.18 MILE | $9,896 | $9,425 | $9,491 | $9,600 | $9,425 | $11,594 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 5.41 MILE | $7,245 | $6,900 | $6,949 | $7,000 | $7,000 | $8,488 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.56 MILE | $7,796 | $7,425 | $7,477 | $7,500 | $7,425 | $9,134 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 45 FT | $2.63 | $2.50 | $3.00 | $2.50 | $2.50 | $3.00 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 4,791 FT | $2.63 | $2.50 | $3.00 | $2.50 | $1.75 | $3.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 1 EACH | $263 | $250 | $252 | $250 | $250 | $308 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $31,542 | $70,000 | $96,389 | $60,000 | $55,000 | $63,772 |
| 202E38500 BRIDGE RAILING REMOVED | 134 FT | $5.25 | $12.00 | $14.00 | $25.00 | $5.00 | $6.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $73.30 | $150 | $481 | $350 | $70.00 | $86.00 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $2.38 | $7.50 | $6.00 | $5.00 | $1.65 | $5.50 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 5,252 LB | $3.61 | $1.75 | $2.00 | $2.00 | $1.65 | $3.65 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 157 EACH | $29.20 | $20.00 | $17.00 | $20.00 | $40.00 | $39.50 |
| 511E81300 CONCRETE, MISC.: EMBEDDED GALVANIC ANODE (EGA) | 66 EACH | $52.64 | $65.00 | $54.00 | $80.00 | $45.00 | $80.00 |
| 514E27700 FIELD PAINTING, MISC.: ZINC RICH PRIMER | 67 SF | $104 | $75.00 | $66.00 | $75.00 | $50.00 | $185 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 101 SF | $7.58 | $15.00 | $4.00 | $6.00 | $10.00 | $15.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 5 SF | $20.18 | $35.00 | $8.00 | $8.00 | $14.00 | $15.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 167 FT | $26.09 | $24.50 | $9.00 | $16.00 | $25.00 | $23.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 161 FT | $28.78 | $15.33 | $29.00 | $16.00 | $16.00 | $43.00 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 14 CY | $465 | $216 | $744 | $500 | $335 | $475 |
| 848E50000 HAND CHIPPING | 52 SY | $159 | $125 | $211 | $100 | $100 | $189 |
| 848E50100 TEST SLAB | 1 LS | $1,994 | $5,000 | $5,910 | $1,500 | $2,000 | $3,009 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $2,319 | $1,000 | $6,029 | $2,500 | $1,500 | $500 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $31,542 | $70,000 | $93,872 | $60,000 | $55,000 | $41,820 |
| 202E38500 BRIDGE RAILING REMOVED | 134 FT | $5.25 | $12.00 | $14.00 | $25.00 | $5.00 | $6.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH | $73.50 | $150 | $481 | $350 | $70.00 | $86.00 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $2.38 | $7.50 | $6.00 | $5.00 | $1.75 | $4.75 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 3,572 LB | $3.61 | $1.75 | $2.00 | $2.00 | $1.75 | $4.00 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 22 CY | $2,082 | $2,200 | $4,656 | $3,000 | $2,500 | $2,777 |
| 511E81300 CONCRETE, MISC.:EMBEDDED GALVANIC ANODE (EGA) | 66 EACH | $52.64 | $65.00 | $54.00 | $80.00 | $45.00 | $80.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 147 FT | $26.09 | $24.50 | $10.00 | $16.00 | $25.00 | $24.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 161 FT | $28.78 | $15.33 | $29.00 | $16.00 | $16.00 | $43.00 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 80 SF | $135 | $450 | $288 | $225 | $335 | $228 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 14 CY | $465 | $216 | $744 | $500 | $335 | $475 |
| 848E50000 HAND CHIPPING | 49 SY | $159 | $100 | $242 | $100 | $100 | $164 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $2.38 | $7.50 | $6.00 | $5.00 | $1.75 | $12.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 3 SF | $7.58 | $30.00 | $9.00 | $6.00 | $15.00 | $15.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 17 SF | $125 | $550 | $314 | $300 | $650 | $308 |
| 607E40000 SPECIAL - VANDAL PROTECTION FENCE, AS PER PLAN | 398 FT | $30.98 | $42.50 | $54.00 | $50.00 | $29.50 | $42.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $1,218 | $2,000 | $530 | $2,500 | $1,000 | $3,020 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 42 CY | $465 | $216 | $735 | $500 | $335 | $467 |
| 848E50000 HAND CHIPPING | 75 SY | $159 | $100 | $257 | $100 | $100 | $160 |
| 848E50200 FULL-DEPTH REPAIR | 2 CY | $1,622 | $1,000 | $6,029 | $2,500 | $1,500 | $500 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $44,772 | $70,000 | $42,086 | $40,000 | $100,000 | $88,500 |
| 202E75266 VANDAL PROTECTION FENCE REMOVED AND RESET | 36 FT | $103 | $130 | $193 | $130 | $98.50 | $122 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 1,100 LB | $3.41 | $2.50 | $3.00 | $2.75 | $2.50 | $4.00 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 100 LB | $3.41 | $4.00 | $5.00 | $5.00 | $2.50 | $13.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 142 EACH | $29.19 | $25.00 | $17.00 | $15.00 | $25.00 | $34.00 |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 15 CY | $2,559 | $4,500 | $8,658 | $2,000 | $5,250 | $5,560 |
| 513E21599 STRUCTURAL STEEL FOR REHABILITATION | 3,472 LB | $10.70 | $9.00 | $13.00 | $15.00 | $12.00 | $11.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 2,078 SF | $10.50 | $10.00 | $10.00 | $10.00 | $10.00 | $12.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 2,078 SF | $10.50 | $10.00 | $10.00 | $10.00 | $10.00 | $12.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 2,078 SF | $5.25 | $5.00 | $5.00 | $5.00 | $5.00 | $6.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 107 FT | $26.09 | $24.50 | $10.00 | $16.00 | $25.00 | $23.00 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 1 CY | $690 | $1,000 | $703 | $2,500 | $2,000 | $1,060 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 31 SF | $135 | $550 | $413 | $225 | $350 | $307 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 33 CY | $465 | $216 | $735 | $500 | $335 | $475 |
| 848E50000 HAND CHIPPING | 60 SY | $159 | $100 | $233 | $100 | $100 | $200 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $2,685 | $1,000 | $6,029 | $2,500 | $1,500 | $500 |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 121 SY | $243 | $230 | $268 | $125 | $400 | $286 |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 121 SY | $165 | $330 | $92.00 | $100 | $275 | $170 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 5 CY | $465 | $216 | $735 | $500 | $335 | $475 |
| 848E50000 HAND CHIPPING | 8 SY | $159 | $100 | $275 | $100 | $100 | $300 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $31,902 | $30,000 | $0.01 | $40,000 | $30,000 | $34,900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,455 | $12,000 | $5,035 | $40,000 | $18,000 | $4,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $155,610 | $156k | 6% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 113 FT | $1,266 | $143k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $123,882 | $124k | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,680 FT | $21 | $119k | 5% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 213 CY | $551.25 | $117k | 5% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,225 SY | $85.25 | $104k | 4% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,225 SY | $76.46 | $94k | 4% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 997 SY | $88.15 | $88k | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 2,078 SF | $42 | $87k | 3% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 978 SY | $80.95 | $79k | 3% |