CUY-IR 271-06.13
CUY County · est $6.4M
Bid dateThursday, September 28—
CUY County · est $6.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 52 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Kokosing Construction Company INC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 12,548 CY | $245 | $272 | $230 | 54% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 327,256 SY | $1.65 | $1.50 | $2.00 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $371,134 | $441,670 | $640,535 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $330,000 | $200,000 | $200,000 | 6% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 3,658.2 SY | $76.00 | $84.00 | $125 | 5% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,136 CY | $240 | $287 | $235 | 5% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, |
| Item | Quantity | R1Karvo Companies INC | R2Kokosing Construction Company INC | R3Shelly Company |
|---|---|---|---|---|
| 209E60201 LINEAR GRADING, AS PER PLAN | 520 STA | $15.00 | $90.00 | $40.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 2 EACH | $4,400 | $4,400 | $1,800 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 11 EACH | $2,500 | $2,500 | $1,300 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $2,800 | $2,800 | $1,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 20.48 MILE |
| $4,500 |
| $4,500 |
| $4,900 |
| 2% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 422 SY | $200 | $350 | $195 | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 10,433 CY | $8.00 | $0.50 | $15.00 | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,200 | $2,200 | $2,250 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 27,821 GAL | $2.90 | $3.00 | $2.50 | 1% |
| 621E00100 RPM | 2,027 EACH | $32.65 | $32.65 | $33.50 | 1% |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 21,138 FT | $3.00 | $3.00 | $3.00 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 22 EACH | $2,650 | $2,650 | $1,600 | 1% |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 19.05 MILE | $2,750 | $2,750 | $3,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $17,500 | $35,000 | 1% |
| 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A | 244 FT | $165 | $190 | $185 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 45 SNMT | $850 | $650 | $650 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 162 CY | $209 | $200 | $175 | 1% |
| 896E00012 PORTABLE NON-INTRUSIVE TRAFFIC SENSOR, CLASS II | 24 SNMT | $1,400 | $1,500 | $1,500 | 1% |
| 5,000 LB |
| $2.50 |
| $2.50 |
| $2.25 |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN C | 28 SY | $75.00 | $625 | $615 |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 14.89 MILE | $915 | $905 | $905 |
| 850E10030 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $4,800 | $4,800 | $12,500 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $5,000 | $5,000 | $5,800 |
| 850E20130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $3.50 | $3.50 | $4.50 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 8,852 FT | $2.35 | $2.30 | $2.35 |
| 896E00021 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,200 | $1,500 | $1,500 |
| 451E32000 SPECIAL - PRESSURE RELIEF JOINT, TYPE C | 57 FT | $125 | $190 | $220 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 237 EACH | $75.00 | $75.00 | $79.00 |
| 620E11000 DELINEATOR, BRACKET MOUNTED | 9 EACH | $150 | $150 | $185 |
| 620E31200 REMOVAL OF DELINEATOR | 166 EACH | $20.00 | $20.00 | $14.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,350 EACH | $1.00 | $2.50 | $6.00 |
| 646E10400 STOP LINE | 265 FT | $12.30 | $12.30 | $15.00 |
| 646E10510 CROSSWALK LINE, 12" | 1,256 FT | $6.25 | $6.25 | $10.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 312 FT | $11.65 | $11.65 | $15.00 |
| 646E10620 CHEVRON MARKING | 586 FT | $11.65 | $11.65 | $15.00 |
| 646E20300 LANE ARROW | 44 EACH | $180 | $180 | $200 |
| 646E20320 WRONG WAY ARROW | 1 EACH | $500 | $500 | $350 |
| 646E20350 LANE REDUCTION ARROW | 4 EACH | $350 | $350 | $450 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 13,201 FT | $2.00 | $2.00 | $2.50 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 9 EACH | $1,400 | $1,400 | $1,400 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $85.00 | $110 | $100 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 18 EACH | $250 | $175 | $175 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 100 CY | $270 | $200 | $115 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 27 SNMT | $1,050 | $900 | $900 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 19.02 MILE | $550 | $550 | $800 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 19.02 MILE | $450 | $450 | $800 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 20.47 MILE | $670 | $670 | $1,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 20.47 MILE | $570 | $570 | $1,000 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 21,138 FT | $0.85 | $0.85 | $0.85 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 21,138 FT | $0.80 | $0.80 | $0.85 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 13,201 FT | $0.60 | $0.60 | $0.60 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 13,201 FT | $0.55 | $0.55 | $0.60 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 312 FT | $2.50 | $2.50 | $2.75 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 312 FT | $2.45 | $2.45 | $2.75 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 265 FT | $3.00 | $3.00 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 265 FT | $2.95 | $2.95 | $3.50 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 1,256 FT | $2.50 | $2.50 | $2.35 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 1,256 FT | $2.45 | $2.45 | $2.35 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 44 EACH | $65.00 | $65.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 44 EACH | $60.00 | $60.00 | $50.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $30.00 | $17.50 | $17.50 |
| 519E12200 PATCHING CONCRETE BRIDGE DECK - TYPE A | 28 SY | $1,000 | $1,000 | $1,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $2,500 | $1,000 | $10,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $3,500 | $2,750 | $3,500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $8,500 | $7,500 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 12,548 CY | $245 | $3.07M | 49% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 327,256 SY | $1.65 | $540k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $371,134 | $371k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $330,000 | $330k | 5% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 3,658.2 SY | $76 | $278k | 4% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,136 CY | $240 | $273k | 4% |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 20.48 MILE | $4,500 | $92k | 1% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 422 SY | $200 | $84k | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 10,433 CY | $8 | $83k | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,200 | $83k | 1% |