RIC-SR 96-16.58
RIC County · est $2.8M
Bid dateThursday, September 28—
RIC County · est $2.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 74 more items below.
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Mosser Construction INC | R3Shelly & Sands INC | R4Great Lakes Demolition Company | R5J D Williamson Construction CO INC | R6Complete General Construction Company | R7R & I Construction INC | R8Ruhlin Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 319,636 LB | $2.45 | $2.53 | $2.45 | $2.60 | $2.36 | $2.15 | $2.72 | $2.87 | 41% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 289 CY | $700 | $750 | $920 |
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Mosser Construction INC | R3Shelly & Sands INC | R4Great Lakes Demolition Company | R5J D Williamson Construction CO INC | R6Complete General Construction Company | R7R & I Construction INC | R8Ruhlin Company |
|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 213 SY | $25.00 | $26.00 | $18.60 | $30.00 | $23.50 | $25.00 | $10.00 | $43.00 |
| 202E38000 GUARDRAIL REMOVED | 660 FT | $2.00 | $5.00 | $2.00 | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,380 |
| $705 |
| $980 |
| $1,300 |
| $890 |
| 10% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $122,500 | $182,000 | $110,000 | $53,000 | $320,000 | $125,000 | $250,000 | $270,000 | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 76,825 LB | $1.50 | $1.50 | $1.63 | $1.50 | $1.45 | $1.50 | $2.00 | $1.77 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $132,000 | $100,000 | $100,000 | $68,000 | $100,000 | 5% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 250 SY | $340 | $260 | $300 | $275 | $315 | $350 | $260 | $450 | 4% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 685 CY | $117 | $170 | $90.00 | $105 | $150 | $190 | $100 | $165 | 4% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 569 FT | $95.00 | $80.00 | $77.00 | $150 | $146 | $85.00 | $114 | $110 | 3% |
| 203E20000 EMBANKMENT | 2,874 CY | $18.00 | $39.00 | $18.50 | $25.00 | $20.30 | $10.00 | $30.00 | $18.00 | 3% |
| 507E00301 STEEL PILES HP14X73, FURNISHED, AS PER PLAN | 840 FT | $60.00 | $75.00 | $48.19 | $50.00 | $52.20 | $50.00 | $60.00 | $83.00 | 3% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 46 CY | $900 | $1,600 | $925 | $780 | $768 | $980 | $1,000 | $770 | 2% |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 65 CY | $585 | $605 | $1,150 | $650 | $785 | $1,300 | $1,000 | $1,100 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 123 CY | $260 | $287 | $260 | $350 | $275 | $260 | $287 | $287 | 2% |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $3,000 | $3,000 | $4,600 | $3,500 | $2,715 | $2,500 | $4,000 | $3,950 | 2% |
| 203E10000 EXCAVATION | 2,350 CY | $12.00 | $19.00 | $21.00 | $12.00 | $16.30 | $10.00 | $20.00 | $20.00 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $5,200 | $13,000 | $5,000 | $45,000 | $25,000 | $40,000 | $30,000 | 1% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $24,600 | $9,800 | $85,000 | $18,500 | $42,000 | $75,000 | $22,000 | $105,000 | 1% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 70 CY | $340 | $336 | $340 | $350 | $358 | $340 | $336 | $336 | 1% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 51 CY | $465 | $550 | $778 | $600 | $497 | $850 | $1,000 | $920 | 1% |
| 442E22301 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 77 CY | $290 | $277 | $290 | $300 | $305 | $290 | $277 | $277 | 1% |
| $2.50 |
| $2.00 |
| $2.00 |
| $2.00 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 4 EACH | $95.00 | $150 | $95.00 | $250 | $1,000 | $95.00 | $100 | $95.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $55.00 | $150 | $55.00 | $250 | $58.00 | $55.00 | $100 | $55.00 |
| 204E10000 SUBGRADE COMPACTION | 1,161 SY | $6.00 | $5.00 | $5.50 | $2.00 | $7.20 | $8.00 | $2.00 | $5.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 173 CY | $40.00 | $27.00 | $30.00 | $25.00 | $98.10 | $40.00 | $10.00 | $55.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $200 | $110 | $220 | $150 | $320 | $350 | $25.00 | $1,000 |
| 204E50000 GEOTEXTILE FABRIC | 500 SY | $2.00 | $4.00 | $1.26 | $2.00 | $3.00 | $5.00 | $5.00 | $3.50 |
| 606E15050 GUARDRAIL, TYPE MGS | 701 FT | $19.00 | $19.00 | $19.00 | $20.00 | $20.00 | $19.00 | $19.75 | $19.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $2,580 | $2,580 | $2,580 | $2,375 | $2,710 | $2,580 | $2,375 | $2,580 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,340 | $1,340 | $1,340 | $1,450 | $1,410 | $1,340 | $1,450 | $1,340 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,360 | $2,360 | $2,360 | $2,300 | $2,480 | $2,360 | $2,300 | $2,360 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $525 | $525 | $525 | $700 | $552 | $525 | $700 | $525 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $98.00 | $98.00 | $200 | $160 | $150 | $25.00 | $150 |
| 659E00300 TOPSOIL | 328 CY | $40.00 | $38.00 | $28.00 | $65.00 | $74.00 | $20.00 | $30.00 | $35.00 |
| 659E10000 SEEDING AND MULCHING | 2,821 SY | $2.15 | $1.37 | $1.37 | $2.50 | $0.70 | $1.56 | $2.50 | $1.55 |
| 659E14000 REPAIR SEEDING AND MULCHING | 142 SY | $0.80 | $0.80 | $0.80 | $1.00 | $0.60 | $1.56 | $1.00 | $1.55 |
| 659E15000 INTER-SEEDING | 142 SY | $0.10 | $0.80 | $0.80 | $1.00 | $0.30 | $1.56 | $1.00 | $1.55 |
| 659E20000 COMMERCIAL FERTILIZER | 0.5 TON | $596 | $896 | $896 | $800 | $475 | $1,400 | $1,000 | $1,400 |
| 659E31000 LIME | 0.58 ACRE | $45.00 | $154 | $154 | $100 | $32.00 | $100 | $20.00 | $100 |
| 659E35000 WATER | 18.7 MGAL | $0.50 | $1.00 | $1.00 | $1.00 | $5.00 | $1.00 | $1.00 | $1.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 128 SY | $2.45 | $2.60 | $2.60 | $5.00 | $10.00 | $2.50 | $2.45 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $1,685 | $1,700 | $1,000 | $4,750 | $2,000 | $2,500 | $1,685 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,000 | $4,200 | $5,600 | $6,500 | $1,300 | $12,800 | $4,000 | $6,400 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,000 | $9,800 | $10,100 | $14,000 | $9,050 | $12,000 | $10,092 | $10,000 |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 5 SY | $140 | $96.00 | $145 | $120 | $150 | $200 | $150 | $385 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 7 SY | $160 | $91.00 | $120 | $150 | $110 | $200 | $150 | $310 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 50 FT | $30.00 | $23.00 | $20.00 | $15.00 | $16.50 | $25.00 | $15.00 | $31.25 |
| 605E31100 AGGREGATE DRAINS | 240 FT | $22.00 | $12.00 | $10.00 | $10.00 | $13.70 | $50.00 | $10.00 | $16.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $17.00 | $14.00 | $18.00 | $15.00 | $21.20 | $25.00 | $15.00 | $16.50 |
| 611E04900 12" CONDUIT, TYPE D | 24 FT | $70.00 | $54.00 | $80.00 | $45.00 | $56.70 | $250 | $40.00 | $190 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 5 EACH | $350 | $375 | $300 | $200 | $400 | $500 | $200 | $825 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 960 FT | $4.50 | $2.25 | $3.25 | $3.00 | $1.60 | $4.00 | $5.00 | $2.10 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2.5" | 1,360 SY | $11.00 | $3.00 | $11.00 | $12.00 | $2.40 | $11.00 | $7.25 | $7.25 |
| 304E20000 AGGREGATE BASE | 164 CY | $110 | $105 | $95.00 | $75.00 | $99.00 | $125 | $80.00 | $130 |
| 407E10000 TACK COAT | 129 GAL | $3.00 | $3.90 | $3.00 | $4.00 | $3.20 | $3.00 | $3.90 | $4.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 115 CY | $115 | $85.00 | $80.00 | $75.00 | $111 | $80.00 | $100 | $85.00 |
| 609E24000 CURB, TYPE 4-A | 302 FT | $5.00 | $35.00 | $49.00 | $30.00 | $56.40 | $75.00 | $24.00 | $26.50 |
| 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO | 504 SY | $38.80 | $38.80 | $28.00 | $40.00 | $20.00 | $45.00 | $15.00 | $315 |
| 621E00100 RPM | 7 EACH | $420 | $420 | $478 | $500 | $442 | $628 | $700 | $475 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, (BI-DIRECTIONAL) | 7 EACH | $11.00 | $11.00 | $11.00 | $10.00 | $11.60 | $11.00 | $10.00 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 4 EACH | $13.50 | $13.50 | $13.50 | $10.00 | $14.20 | $13.50 | $10.00 | $13.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 28 FT | $18.00 | $18.00 | $18.00 | $14.00 | $19.00 | $18.00 | $13.95 | $18.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 31 FT | $19.00 | $19.00 | $19.00 | $12.00 | $20.00 | $19.00 | $11.20 | $19.00 |
| 630E80100 SIGN, FLAT SHEET | 26 SF | $22.00 | $22.00 | $22.00 | $34.00 | $23.20 | $22.00 | $33.95 | $22.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 15 EACH | $10.00 | $10.00 | $10.00 | $47.00 | $10.60 | $10.00 | $46.50 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $15.00 | $15.00 | $15.00 | $65.00 | $16.00 | $150 | $64.50 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.28 MILE | $6,925 | $5,750 | $6,925 | $6,925 | $6,040 | $5,105 | $5,750 | $5,105 |
| 642E00300 CENTER LINE, TYPE 1 | 0.14 MILE | $9,235 | $5,750 | $9,235 | $9,235 | $6,040 | $6,832 | $5,750 | $6,850 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 32 HOUR | $80.00 | $90.00 | $82.00 | $150 | $74.00 | $85.00 | $70.00 | $120 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $5,025 | $5,025 | $5,025 | $5,180 | $8,550 | $5,025 | $8,500 |
| 616E10000 WATER | 10 MGAL | $1.00 | $10.00 | $70.00 | $1.00 | $5.50 | $70.00 | $1.00 | $155 |
| 202E22900 APPROACH SLAB REMOVED | 245 SY | $70.00 | $75.00 | $22.00 | $30.00 | $39.20 | $75.00 | $25.00 | $53.50 |
| 202E23500 WEARING COURSE REMOVED | 988 SY | $5.00 | $9.00 | $6.50 | $15.00 | $5.80 | $15.00 | $5.00 | $10.50 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $17,500 | $8,900 | $40,000 | $20,000 | $25,000 | $80,000 | $30,000 | $110,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $7,500 | $8,000 | $6,000 | $20,000 | $8,200 | $25,000 | $20,000 | $18,500 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 4,826 FT | $2.25 | $2.50 | $2.31 | $2.50 | $2.40 | $2.00 | $3.00 | $2.47 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 480 SY | $30.00 | $24.00 | $28.50 | $45.00 | $23.50 | $28.50 | $35.00 | $32.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,169 EACH | $8.00 | $5.50 | $6.00 | $5.50 | $4.75 | $7.00 | $5.00 | $4.80 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 90 FT | $70.00 | $42.00 | $75.00 | $40.00 | $51.00 | $75.00 | $30.00 | $54.50 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 79 SF | $8.00 | $6.00 | $4.00 | $20.00 | $5.50 | $7.00 | $5.00 | $8.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 87 SF | $10.00 | $7.00 | $9.00 | $25.00 | $9.00 | $12.00 | $5.00 | $10.50 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 69 SF | $12.00 | $11.00 | $11.00 | $30.00 | $11.15 | $15.00 | $7.00 | $17.00 |
| 516E25000 NYLON REINFORCED NEOPRENE SHEETING | 396 SF | $23.00 | $16.00 | $10.50 | $15.00 | $11.00 | $10.00 | $10.00 | $15.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 126 CY | $165 | $105 | $95.00 | $80.00 | $96.20 | $95.00 | $75.00 | $125 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 151 FT | $10.00 | $20.00 | $6.00 | $12.00 | $15.00 | $10.00 | $10.00 | $25.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $20.00 | $20.00 | $20.00 | $12.00 | $14.25 | $15.00 | $10.00 | $25.00 |
| 526E90030 TYPE C INSTALLATION | 90 FT | $210 | $145 | $275 | $300 | $182 | $375 | $175 | $300 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 360 SY | $30.00 | $62.00 | $50.00 | $33.00 | $38.20 | $70.00 | $20.00 | $73.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $22,000 | $16,200 | $14,000 | $25,000 | $27,000 | $28,000 | $36,000 | $20,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $4,900 | $3,730 | $6,500 | $6,500 | $20,000 | $4,000 | $15,000 |
| 619E16010 FIELD OFFICE, TYPE B | 8 MNTH | $1,000 | $1,600 | $4,500 | $500 | $1,550 | $2,000 | $700 | $2,600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,000 | $15,000 | $27,000 | $12,000 | $16,000 | $9,000 | $10,340 | $45,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 319,636 LB | $2.45 | $783k | 33% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 289 CY | $700 | $202k | 9% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $122,500 | $123k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 76,825 LB | $1.5 | $115k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 250 SY | $340 | $85k | 4% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 685 CY | $117 | $80k | 3% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 569 FT | $95 | $54k | 2% |
| 203E20000 EMBANKMENT | 2,874 CY | $18 | $52k | 2% |
| 507E00301 STEEL PILES HP14X73, FURNISHED, AS PER PLAN | 840 FT | $60 | $50k | 2% |