ALL-/HAN-US 30-19.02/00.00
ALL County · est $3.6M
Bid dateThursday, December 14—
ALL County · est $3.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 1 more items below.
| Item | Quantity | R1Smith Paving & Excavating INC | R2D L Smith Concrete LLC | R3Shelly & Sands INC | R4Perk Company INC | % of bid |
|---|---|---|---|---|---|---|
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 11,078 SY | $149 | $162 | $190 | $194 | 50% |
| 255E10200 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 6,397 SY | $164 | $154 | $208 | $212 | 32% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 58,054 FT | $3.60 | $3.25 | $3.50 | $5.00 | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $133,000 | $177,000 | $150,000 | $210,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $55,000 | $116,500 | $100,000 | $100,000 | 2% |
| 690E98000 SPECIAL - MISC.: INSTALLATION OF DEFORMED BAR | 800 EACH | $65.00 | $80.00 | $48.00 |
| Item | Quantity | R1Smith Paving & Excavating INC | R2D L Smith Concrete LLC | R3Shelly & Sands INC | R4Perk Company INC |
|---|---|---|---|---|---|
| 643E00300 CENTER LINE | 0.08 MILE | $8,876 | $62,870 | $10,000 | $62,870 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $225 |
| 2% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 56 SNMT | $800 | $800 | $857 | $1,910 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $34,000 | $45,000 | $22,500 | $60,000 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $100 | $95.00 | $91.00 | $100 | 1% |
| 643E00104 EDGE LINE, 6" | 2.62 MILE | $6,350 | $13,970 | $6,800 | $13,970 | 1% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 16 SNMT | $1,000 | $1,000 | $1,075 | $1,210 | 0% |
| 423E00150 CRACK SEALING, TYPE IV | 787 LB | $11.00 | $14.00 | $10.00 | $21.15 | 0% |
| 643E00204 LANE LINE, 6" | 1.37 MILE | $4,945 | $9,780 | $8,035 | $9,780 | 0% |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 18 EACH | $250 | $250 | $267 | $295 | 0% |
| 618E40200 RUMBLE STRIPS, SHOULDER (CONCRETE) | 76 FT | $50.00 | $66.00 | $83.00 | $66.00 | 0% |
| 643E00404 CHANNELIZING LINE, 12" | 1,783 FT | $1.95 | $9.80 | $2.00 | $9.80 | 0% |
| 614E12600 REPLACEMENT DRUM | 50 EACH | $64.00 | $64.00 | $68.00 | $60.00 | 0% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 0% |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $192 | $192 | $205 | $150 | 0% |
| 617E10100 COMPACTED AGGREGATE | 4 CY | $200 | $150 | $245 | $980 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 11,078 SY | $149 | $1.65M | 50% |
| 255E10200 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 6,397 SY | $164 | $1.05M | 32% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 58,054 FT | $3.6 | $209k | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $133,000 | $133k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $55,000 | $55k | 2% |
| 690E98000 SPECIAL - MISC.: INSTALLATION OF DEFORMED BAR | 800 EACH | $65 | $52k | 2% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 56 SNMT | $800 | $45k | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $34,000 | $34k | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $100 | $20k | 1% |
| 643E00104 EDGE LINE, 6" | 2.62 MILE | $6,350 | $17k | 1% |