HUR-SR 99/SR 162-16.51/23.18
HUR County · est $0.6M
Bid dateThursday, December 14—
HUR County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2Bcc Ohio INC | R3Crawford Construction Company INC | R4Advanced Excavating & Demolition LLC | % of bid |
|---|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $85,000 | $13,243 | $38,000 | $30,000 | 19% |
| 611E30000 96" CONDUIT, TYPE A, 706.02, 707.85, 707.02 (0.168 | 84 FT | $685 | $1,334 | $1,450 | $1,500 | 13% |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 39 CY | $1,250 | $1,305 | $1,200 | $2,000 | 11% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 93 CY | $350 | $320 | $365 | $350 | 7% |
| 611E20700 48" CONDUIT, TYPE A, 706.02, 707.33, 707.02 (54" D | 130 FT | $250 | $620 | $508 | $950 | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 122 CY | $250 | $227 | $332 | $260 |
| Item | Quantity | R1Great Lakes Demolition Company | R2Bcc Ohio INC | R3Crawford Construction Company INC | R4Advanced Excavating & Demolition LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $1,848 | $4,300 | $10,000 |
| 202E20010 HEADWALL REMOVED | 4 EACH | $850 | $1,150 | $1,500 | $600 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 8 FT | $50.00 | $14.44 | $177 | $50.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 169 FT | $20.00 | $49.21 | $74.00 | $35.00 |
| 202E98100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 203E20000 EMBANKMENT | 681 CY | $25.00 | $35.32 | $27.00 | $45.00 | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $16,500 | $8,400 | $12,400 | $11,040 | 4% |
| 602E20000 CONCRETE MASONRY | 12 CY | $1,250 | $1,455 | $1,700 | $3,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $13,850 | $4,067 | $10,000 | $24,000 | 3% |
| 659E00300 TOPSOIL | 222 CY | $50.00 | $50.51 | $38.00 | $50.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,500 | $3,675 | $7,600 | $12,500 | 2% |
| 304E20000 AGGREGATE BASE | 149 CY | $70.00 | $151 | $150 | $95.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 541 SY | $17.00 | $7.36 | $13.00 | $27.00 | 2% |
| 602E20000 CONCRETE MASONRY | 4.4 CY | $2,000 | $1,589 | $2,000 | $3,000 | 2% |
| 601E11000 RIPRAP, TYPE D | 43 SY | $200 | $327 | $256 | $350 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $8,500 | $12,784 | $3,000 | $6,000 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $8,500 | $17,168 | $3,000 | $6,500 | 2% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 52 CY | $160 | $184 | $180 | $185 | 2% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 14 CY | $575 | $604 | $406 | $600 | 2% |
| 7 EACH |
| $450 |
| $57.75 |
| $50.00 |
| $100 |
| 202E98100 REMOVAL MISC.: WOOD POST | 8 EACH | $50.00 | $57.75 | $50.00 | $100 |
| 202E98200 REMOVAL MISC.: CONCRETE CLOTH | 67 FT | $20.00 | $38.12 | $22.00 | $10.00 |
| 203E10000 EXCAVATION | 34 CY | $25.00 | $17.33 | $83.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 623 SY | $2.00 | $1.16 | $4.00 | $2.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 2 EACH | $1,450 | $1,993 | $2,300 | $2,550 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 1 EACH | $850 | $431 | $1,500 | $1,000 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,200 | $2,048 | $1,200 | $2,265 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,200 | $2,048 | $1,200 | $2,265 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $600 | $625 | $640 | $750 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 16 CY | $125 | $225 | $150 | $170 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $80.00 | $116 | $140 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 2,004 SY | $3.00 | $2.73 | $7.00 | $2.90 |
| 659E14000 REPAIR SEEDING AND MULCHING | 100 SY | $1.00 | $1.05 | $5.00 | $1.00 |
| 659E15000 INTER-SEEDING | 100 SY | $1.00 | $0.11 | $1.00 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.28 TON | $800 | $441 | $400 | $600 |
| 659E31000 LIME | 0.41 ACRE | $1,000 | $22.05 | $1,229 | $25.00 |
| 659E35000 WATER | 11.09 MGAL | $1.00 | $1.05 | $5.00 | $1.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 387 SY | $6.00 | $3.05 | $14.00 | $5.50 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 104 FT | $15.00 | $13.98 | $16.00 | $15.00 |
| 611E04600 12" CONDUIT, TYPE C | 8 FT | $150 | $129 | $160 | $100 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 521 SY | $8.00 | $29.40 | $26.00 | $28.00 |
| 304E20000 AGGREGATE BASE (DRIVEWAYS) | 35 CY | $70.00 | $151 | $184 | $100 |
| 407E10000 TACK COAT | 142 GAL | $2.50 | $2.63 | $9.00 | $3.00 |
| 621E00100 RPM | 5 EACH | $600 | $509 | $1,200 | $485 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $75.00 | $18.48 | $50.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.18 MILE | $12,000 | $5,250 | $12,600 | $5,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.1 MILE | $15,000 | $5,250 | $16,900 | $5,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $950 | $831 | $1,100 | $1,425 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 13 SY | $40.00 | $52.58 | $120 | $95.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 30 SY | $40.00 | $52.58 | $120 | $40.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $5,000 | $3,717 | $1,600 | $20,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $7,079 | $6,200 | $18,000 |
| 619E16010 FIELD OFFICE, TYPE B | 2 MNTH | $850 | $3,068 | $1,000 | $1,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $85,000 | $85k | 17% |
| 611E30000 96" CONDUIT, TYPE A, 706.02, 707.85, 707.02 (0.168 | 84 FT | $685 | $58k | 11% |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 39 CY | $1,250 | $49k | 9% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 93 CY | $350 | $33k | 6% |
| 611E20700 48" CONDUIT, TYPE A, 706.02, 707.33, 707.02 (54" D | 130 FT | $250 | $33k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 122 CY | $250 | $31k | 6% |
| 203E20000 EMBANKMENT | 681 CY | $25 | $17k | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $16,500 | $17k | 3% |
| 602E20000 CONCRETE MASONRY | 12 CY | $1,250 | $15k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $13,850 | $14k | 3% |