HOL-SR 39-06.72
HOL County · est $1.4M
Bid dateThursday, January 11—
HOL County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Melway Paving CO INC | R2Shelly & Sands INC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 2,805 CY | $205 | $192 | $211 | 41% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (2173 CY | $190 | $177 | $193 | 29% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $58,000 | $114,990 | $76,400 | 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 150 CY | $325 | $350 | $400 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 700 CY | $65.00 | $45.00 | $50.00 | 3% |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $350 | $425 | $350 | 3% |
| 646E10010 EDGE LINE, 6" | 9.72 MILE |
| Item | Quantity | R1Melway Paving CO INC | R2Shelly & Sands INC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 653 SY | $3.00 | $4.00 | $8.00 |
| 623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE | 5 EACH | $800 | $1,000 | $500 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 6 EACH | $200 | $500 | $225 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 6 EACH | $400 | $500 | $275 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3,200 |
| $3,200 |
| $3,500 |
| 2% |
| 407E10000 TACK COAT | 10,263 GAL | $2.80 | $2.25 | $2.75 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2.25" | 8,391 SY | $3.00 | $3.25 | $2.60 | 2% |
| 621E00100 RPM | 354 EACH | $65.00 | $38.00 | $42.00 | 2% |
| 646E10200 CENTER LINE | 4.95 MILE | $3,400 | $3,400 | $5,500 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 4,477 GAL | $3.70 | $4.00 | $4.75 | 1% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $325 | $425 | $410 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 27 CF | $530 | $522 | $522 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 10.03 MILE | $1,200 | $950 | $950 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $40,000 | $40,000 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 9.62 MILE | $1,050 | $350 | $1,400 | 1% |
| 632E26500 DETECTOR LOOP | 4 EACH | $1,800 | $1,800 | $1,800 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 354 EACH | $20.00 | $10.00 | $10.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,100 | $8,000 | $6,120 | 0% |
| 605E31100 AGGREGATE DRAINS |
| 50 FT |
| $18.00 |
| $30.00 |
| $10.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 159 SY | $3.00 | $10.00 | $8.00 |
| 617E20000 SHOULDER PREPARATION | 11,191 SY | $0.20 | $1.85 | $0.12 |
| 646E10300 CHANNELIZING LINE, 8" | 270 FT | $1.60 | $1.60 | $5.00 |
| 646E10400 STOP LINE | 110 FT | $13.00 | $13.00 | $20.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 130 FT | $10.00 | $10.00 | $20.00 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 1 EACH | $650 | $650 | $600 |
| 646E20300 LANE ARROW | 3 EACH | $175 | $175 | $175 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 40 FT | $1.00 | $1.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $70.00 | $85.00 | $80.00 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $60.00 | $50.00 | $50.00 |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 10.03 MILE | $500 | $525 | $175 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 810 FT | $0.75 | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 257 FT | $3.20 | $5.00 | $5.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 2,805 CY | $205 | $575k | 40% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (2173 CY | $190 | $413k | 29% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $58,000 | $58k | 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 150 CY | $325 | $49k | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 700 CY | $65 | $46k | 3% |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $350 | $42k | 3% |
| 646E10010 EDGE LINE, 6" | 9.72 MILE | $3,200 | $31k | 2% |
| 407E10000 TACK COAT | 10,263 GAL | $2.8 | $29k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2.25" | 8,391 SY | $3 | $25k | 2% |
| 621E00100 RPM | 354 EACH | $65 | $23k | 2% |