MED-/WAY-SR 83/SR 585-00.91/11.98
MED County · est $1.4M
Bid dateThursday, January 11—
MED County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Melway Paving CO INC | R3Karvo Companies INC | R4Shelly Company | R5Cole Burton Contractors, LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,286 CY | $215 | $205 | $224 | $200 | $235 | 23% |
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1030 CY | $250 | $250 | $287 | $250 | $280 | 21% |
| 442E20101 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 849 CY | $207 | $205 | $239 | $225 | $235 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $113,970 | $145,000 | $100,000 | $191,500 | $125,000 | 9% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 400 CY | $265 | $350 | $325 | $290 | $380 | 9% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Melway Paving CO INC | R3Karvo Companies INC | R4Shelly Company | R5Cole Burton Contractors, LLC |
|---|---|---|---|---|---|---|
| 209E80000 GRADING MAILBOX APPROACHES | 8 EACH | $50.00 | $150 | $25.00 | $225 | $750 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $850 | $900 | $1,000 | $1,200 | $750 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 3 EACH | $1,350 | $2,200 | $1,575 | $1,800 | $1,500 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $40,000 |
| $30,000 |
| $85,000 |
| $40,000 |
| $40,000 |
| 3% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (1") | 36,566 SY | $0.85 | $2.35 | $1.50 | $1.95 | $2.00 | 3% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 57 CF | $439 | $450 | $439 | $600 | $465 | 2% |
| 617E10100 COMPACTED AGGREGATE | 637 CY | $30.00 | $65.00 | $110 | $80.00 | $120 | 2% |
| 407E10000 TACK COAT | 6,940 GAL | $2.75 | $2.80 | $3.00 | $3.00 | $4.00 | 2% |
| 209E60500 LINEAR GRADING | 7.14 MILE | $2,600 | $1,900 | $2,525 | $2,100 | $2,800 | 2% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 3.04 MILE | $6,000 | $10,500 | $5,735 | $16,500 | $5,500 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.75") | 28,819 SY | $0.60 | $1.65 | $1.00 | $1.95 | $1.50 | 1% |
| 621E00100 RPM | 398 EACH | $43.00 | $43.00 | $37.56 | $44.30 | $39.00 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 3,368 GAL | $4.75 | $3.70 | $5.50 | $5.00 | $5.00 | 1% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 43 CY | $290 | $550 | $625 | $900 | $840 | 1% |
| 253E02000 PAVEMENT REPAIR (LONGITUDINAL) | 39 CY | $275 | $350 | $325 | $550 | $890 | 1% |
| 619E16020 FIELD OFFICE, TYPE C | 4 MNTH | $2,600 | $5,000 | $2,200 | $3,000 | $2,000 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 9.7 MILE | $800 | $800 | $860 | $800 | $860 | 1% |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 1,021 FT | $7.50 | $7.50 | $6.25 | $7.50 | $6.25 | 1% |
| 1 LS |
| $4,500 |
| $4,100 |
| $1,000 |
| $2,563 |
| $6,400 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 253E02000 PAVEMENT REPAIR (TRANSVERSE) | 5 CY | $320 | $550 | $700 | $800 | $2,825 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 357 SY | $5.00 | $2.50 | $3.50 | $3.50 | $7.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (TAPER 1.75" TO | 1,686 SY | $0.60 | $3.50 | $12.00 | $9.50 | $6.25 |
| 254E01600 PATCHING PLANED SURFACE | 157 SY | $1.25 | $22.00 | $1.00 | $1.00 | $20.00 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 0.86 MILE | $3,250 | $1,750 | $4,660 | $1,750 | $1,750 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 3.04 MILE | $1,750 | $1,750 | $1,750 | $1,750 | $1,750 |
| 897E02000 PATCHING PLANED SURFACE | 189 SY | $1.25 | $20.00 | $1.00 | $1.00 | $20.00 |
| 620E70010 DELINEATOR, MISC.: REMOVED AND REERECTED | 300 FT | $20.00 | $29.00 | $15.25 | $33.00 | $15.25 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 381 EACH | $3.00 | $20.00 | $2.29 | $5.00 | $3.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 7.14 MILE | $1,000 | $1,000 | $1,155 | $1,000 | $1,200 |
| 642E00300 CENTER LINE, TYPE 1 | 3.92 MILE | $1,200 | $1,200 | $1,285 | $1,200 | $1,300 |
| 644E00400 CHANNELIZING LINE, 8" | 976 FT | $3.50 | $3.50 | $2.25 | $3.50 | $2.25 |
| 644E00500 STOP LINE | 269 FT | $7.50 | $7.50 | $6.50 | $7.50 | $6.75 |
| 644E01000 RAILROAD SYMBOL MARKING | 4 EACH | $500 | $500 | $445 | $500 | $445 |
| 644E01300 LANE ARROW | 16 EACH | $75.00 | $75.00 | $135 | $75.00 | $135 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $100 | $80.00 | $85.00 | $100 | $85.00 |
| 614E12460 WORK ZONE MARKING SIGN | 38 EACH | $50.00 | $60.00 | $100 | $50.00 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 15 CY | $100 | $400 | $200 | $115 | $650 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,952 FT | $2.50 | $2.50 | $0.85 | $2.50 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 674 FT | $1.50 | $3.50 | $4.00 | $3.50 | $4.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 32 EACH | $20.00 | $45.00 | $75.00 | $45.00 | $75.00 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 97 FT | $15.00 | $55.00 | $53.50 | $53.50 | $75.00 |
| 202E98200 REMOVAL MISC.: POLYMER MODIFIED ASPHALT EXPANSION | 88 FT | $64.77 | $65.00 | $64.77 | $50.00 | $200 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $7,500 | $10,000 | $7,500 | $5,000 | $9,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $6,500 | $7,500 | $4,000 | $20,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $5,000 | $5,000 | $5,000 | $11,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,286 CY | $215 | $276k | 21% |
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1030 CY | $250 | $258k | 20% |
| 442E20101 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 849 CY | $207 | $176k | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $113,970 | $114k | 9% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 400 CY | $265 | $106k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (1") | 36,566 SY | $0.85 | $31k | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 57 CF | $439 | $25k | 2% |
| 617E10100 COMPACTED AGGREGATE | 637 CY | $30 | $19k | 1% |
| 407E10000 TACK COAT | 6,940 GAL | $2.75 | $19k | 1% |