VAN-SR 81-02.55
VAN County · est $1.6M
Bid dateThursday, January 11—
VAN County · est $1.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Miller Contracting Group INC | R2Eclipse CO LLC | R3Vernon Nagel INC | % of bid |
|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,119 CY | $200 | $195 | $222 | 18% |
| 611E30000 96" CONDUIT, TYPE A, 707.02 WITH CFP, 706.02, 707. | 199 FT | $785 | $783 | $1,500 | 12% |
| 203E20000 EMBANKMENT | 10,392 CY | $12.75 | $16.00 | $14.00 | 11% |
| 304E20000 AGGREGATE BASE | 1,704 CY | $68.00 | $65.00 | $70.00 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $111,000 | $78,332 | $40,000 | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 284 CY | $265 | $258 | $245 | 6% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (272 CY | $265 | $258 |
| Item | Quantity | R1Miller Contracting Group INC | R2Eclipse CO LLC | R3Vernon Nagel INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,000 | $5,787 | $15,000 |
| 202E20010 HEADWALL REMOVED | 4 EACH | $625 | $529 | $1,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 221 FT | $8.00 | $16.00 | $8.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 122 FT | $9.00 | $40.00 | $100 |
| 202E38000 GUARDRAIL REMOVED | 350 FT | $2.55 | $3.00 | $3.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $245 |
| 6% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 322 CY | $170 | $166 | $250 | 4% |
| 203E10000 EXCAVATION | 5,086 CY | $10.25 | $11.00 | $14.00 | 4% |
| 202E23000 PAVEMENT REMOVED | 6,750 SY | $6.25 | $3.00 | $5.00 | 3% |
| 602E20000 CONCRETE MASONRY | 21.2 CY | $1,360 | $1,237 | $1,800 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $28,000 | $14,091 | $10,000 | 2% |
| 605E31100 AGGREGATE DRAINS | 1,500 FT | $17.50 | $17.00 | $15.00 | 2% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 450 CY | $52.00 | $55.00 | $62.00 | 2% |
| 659E10000 SEEDING AND MULCHING | 15,122 SY | $1.45 | $1.00 | $2.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,143 | $15,173 | $20,000 | 1% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 164 CY | $102 | $107 | $130 | 1% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $13,800 | $28,508 | $20,000 | 1% |
| 611E04900 12" CONDUIT, TYPE D | 293 FT | $46.00 | $60.00 | $100 | 1% |
| 8 EACH |
| $385 |
| $395 |
| $450 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $235 | $529 | $300 |
| 202E75000 FENCE REMOVED | 480 FT | $4.25 | $5.00 | $4.00 |
| 202E75250 GATE REMOVED | 2 EACH | $250 | $263 | $235 |
| 202E98100 REMOVAL MISC.: CLOTHESLINE POST | 1 EACH | $125 | $162 | $125 |
| 202E98100 REMOVAL MISC.: LIGHT POST | 1 EACH | $330 | $162 | $200 |
| 202E98100 REMOVAL MISC.: YARD DECORATION | 1 EACH | $600 | $162 | $250 |
| 204E10000 SUBGRADE COMPACTION | 8,212 SY | $1.25 | $1.00 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 450 CY | $22.00 | $25.00 | $15.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $200 | $276 | $225 |
| 204E50000 GEOTEXTILE FABRIC | 1,349 SY | $1.95 | $1.00 | $1.00 |
| 209E10000 DITCH CLEANOUT | 48 FT | $9.00 | $32.00 | $50.00 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 4 EACH | $1,110 | $1,750 | $700 |
| 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET | 5 EACH | $900 | $1,345 | $700 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 7 EACH | $250 | $626 | $400 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $3,800 | $2,865 | $3,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $3,800 | $2,865 | $3,000 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 2 EACH | $465 | $247 | $425 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 2 EACH | $355 | $247 | $330 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $130 | $26.00 | $25.00 |
| 659E00300 TOPSOIL | 420 CY | $20.00 | $78.00 | $25.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 756 SY | $1.45 | $0.32 | $0.30 |
| 659E20000 COMMERCIAL FERTILIZER | 2.1 TON | $850 | $631 | $600 |
| 659E31000 LIME | 3.2 ACRE | $40.00 | $5.00 | $5.00 |
| 659E35000 WATER | 82 MGAL | $2.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 3,780 SY | $2.00 | $2.00 | $2.20 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 112 SY | $2.00 | $2.00 | $2.20 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,800 | $1,736 | $800 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,775 | $4,629 | $3,600 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,800 | $10,407 | $10,000 |
| 611E01100 6" CONDUIT, TYPE C | 37 FT | $32.00 | $34.00 | $45.00 |
| 611E01500 6" CONDUIT, TYPE F | 30 FT | $32.00 | $29.00 | $45.00 |
| 611E03300 10" CONDUIT, TYPE C | 10 FT | $77.00 | $55.00 | $52.00 |
| 611E04400 12" CONDUIT, TYPE B | 45 FT | $63.00 | $74.00 | $100 |
| 611E07900 18" CONDUIT, TYPE D | 72 FT | $60.00 | $69.00 | $100 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,900 | $3,682 | $3,000 |
| 407E20000 NON-TRACKING TACK COAT | 729 GAL | $3.25 | $3.00 | $3.00 |
| 621E00100 RPM | 31 EACH | $160 | $232 | $125 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 31 EACH | $20.00 | $11.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $325 | $179 | $100 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.92 MILE | $2,175 | $2,809 | $2,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.46 MILE | $4,350 | $3,745 | $4,000 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $600 | $658 | $645 |
| 407E20000 NON-TRACKING TACK COAT | 20 GAL | $3.25 | $3.00 | $3.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 10 CY | $450 | $479 | $455 |
| 616E10000 WATER | 31 MGAL | $10.00 | $21.00 | $10.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $73.00 | $117 | $70.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,000 | $11,532 | $7,500 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $1,000 | $684 | $1,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,119 CY | $200 | $224k | 16% |
| 611E30000 96" CONDUIT, TYPE A, 707.02 WITH CFP, 706.02, 707. | 199 FT | $785 | $156k | 11% |
| 203E20000 EMBANKMENT | 10,392 CY | $12.75 | $132k | 9% |
| 304E20000 AGGREGATE BASE | 1,704 CY | $68 | $116k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $111,000 | $111k | 8% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 284 CY | $265 | $75k | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (272 CY | $265 | $72k | 5% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 322 CY | $170 | $55k | 4% |
| 203E10000 EXCAVATION | 5,086 CY | $10.25 | $52k | 4% |
| 202E23000 PAVEMENT REMOVED | 6,750 SY | $6.25 | $42k | 3% |