RIC-SR 61/SR 598-12.74/00.71
RIC County · est $0.3M
Bid dateThursday, January 11—
RIC County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1Adena Corporation | R2Kelstin INC | R3Stanley Miller Construction Company | R4Bcc Ohio INC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 833E12000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 51 FT | $1,070 | $1,000 | $1,000 | $951 | $884 | 19% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.02 (0.168) W/CONC | 93 FT | $499 | $330 | $369 | $654 | $600 | 16% |
| 301E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN, PG64-22 | 81 CY | $346 | $300 | $444 | $420 | $400 | 10% |
| 602E20000 CONCRETE MASONRY | 16.3 CY | $1,422 | $370 | $875 | $1,564 | $392 | 8% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,842 | $10,000 | $3,500 | $11,172 | $35,000 | 6% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 |
| Item | Quantity | R1Adena Corporation | R2Kelstin INC | R3Stanley Miller Construction Company | R4Bcc Ohio INC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 18 FT | $8.01 | $20.00 | $37.00 | $17.33 | $31.00 |
| 203E10000 EXCAVATION | 80 CY | $8.61 | $100 | $32.00 | $23.10 | $33.00 |
| 204E10000 SUBGRADE COMPACTION | 371 SY | $1.85 | $10.00 | $1.00 | $2.31 | $1.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $2,328 | $1,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 42 CY |
| $377 |
| $400 |
| $889 |
| $840 |
| $800 |
| 6% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $14,157 | $2,500 | $8,622 | $24,990 | $9,500 | 5% |
| 203E20000 EMBANKMENT | 434 CY | $25.62 | $80.00 | $105 | $34.36 | $41.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,867 | $25,000 | $18,000 | $5,079 | $30,895 | 4% |
| 304E20000 AGGREGATE BASE | 127 CY | $82.62 | $50.00 | $150 | $117 | $118 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,177 | $5,000 | $5,667 | $6,930 | $7,500 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $8,258 | $5,600 | $7,000 | $10,495 | $10,375 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,867 | $4,500 | $7,500 | $4,851 | $8,000 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 300 FT | $22.70 | $25.00 | $22.00 | $20.48 | $23.60 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,863 | $2,500 | $13,000 | $3,045 | $9,000 | 2% |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $4,824 | $5,000 | $3,200 | $4,857 | $6,398 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $4,424 | $3,000 | $4,223 | $3,990 | $2,920 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,958 | $7,000 | $5,100 | $4,830 | $9,500 | 1% |
| 202E23000 PAVEMENT REMOVED | 354 SY | $10.97 | $20.00 | $13.33 | $23.09 | $17.00 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3 INCH) | 142 SY | $24.49 | $25.00 | $13.33 | $42.00 | $40.00 | 1% |
| $2,223 |
| $2,100 |
| $1,360 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 2 EACH | $1,329 | $2,000 | $1,250 | $2,874 | $2,624 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,187 | $2,000 | $2,023 | $1,260 | $4,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,187 | $2,000 | $2,023 | $1,890 | $4,000 |
| 601E11000 RIPRAP, TYPE D | 1.9 SY | $1,289 | $2,000 | $3,000 | $1,872 | $1,534 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 6 CY | $185 | $1,000 | $250 | $208 | $178 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $125 | $200 | $150 | $94.50 | $132 |
| 659E00300 TOPSOIL | 146 CY | $17.41 | $50.00 | $45.00 | $37.80 | $88.00 |
| 659E10000 SEEDING AND MULCHING | 1,317 SY | $1.61 | $5.00 | $3.00 | $3.36 | $2.99 |
| 659E14000 REPAIR SEEDING AND MULCHING | 66 SY | $1.00 | $10.00 | $2.00 | $1.37 | $1.79 |
| 659E15000 INTER-SEEDING | 66 SY | $1.00 | $10.00 | $2.00 | $0.11 | $1.79 |
| 659E20000 COMMERCIAL FERTILIZER | 0.19 TON | $1,225 | $1,000 | $800 | $618 | $858 |
| 659E31000 LIME | 0.28 ACRE | $333 | $500 | $150 | $21.00 | $154 |
| 659E35000 WATER | 7.29 MGAL | $1.00 | $5.00 | $1.00 | $1.05 | $1.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 332 SY | $1.73 | $5.00 | $1.75 | $2.57 | $1.56 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 51 FT | $40.53 | $250 | $55.00 | $90.59 | $114 |
| 605E31100 AGGREGATE DRAINS | 40 FT | $8.67 | $35.00 | $15.00 | $30.53 | $26.00 |
| 611E07600 18" CONDUIT, TYPE C | 18 FT | $40.16 | $70.00 | $65.00 | $139 | $95.00 |
| 611E97300 CONDUIT, MISC.: VIDEO LOG | 1 LS | $689 | $5,000 | $4,000 | $1,285 | $1,290 |
| 407E10000 TACK COAT | 67 GAL | $17.46 | $20.00 | $3.34 | $3.15 | $3.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 117 GAL | $17.77 | $20.00 | $6.67 | $6.30 | $6.00 |
| 617E10100 COMPACTED AGGREGATE | 8 CY | $159 | $20.00 | $100 | $117 | $154 |
| 621E00100 RPM | 3 EACH | $521 | $750 | $500 | $971 | $1,505 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $28.71 | $500 | $50.00 | $18.48 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 8 EACH | $12.80 | $12.50 | $12.23 | $13.13 | $13.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $25,941 | $21,050 | $23,389 | $14,700 | $24,475 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $35,543 | $28,065 | $31,833 | $14,700 | $32,630 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $250 | $1,000 | $400 | $2,612 | $685 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 833E12000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 51 FT | $1,070 | $55k | 17% |
| 611E23600 60" CONDUIT, TYPE A, 706.02, 707.02 (0.168) W/CONC | 93 FT | $498.69 | $46k | 14% |
| 301E56001 ASPHALT CONCRETE BASE, (449), AS PER PLAN, PG64-22 | 81 CY | $345.54 | $28k | 9% |
| 602E20000 CONCRETE MASONRY | 16.3 CY | $1,422 | $23k | 7% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,842 | $16k | 5% |
| 442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 42 CY | $376.62 | $16k | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $14,157 | $14k | 4% |
| 203E20000 EMBANKMENT | 434 CY | $25.62 | $11k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,867 | $11k | 3% |
| 304E20000 AGGREGATE BASE | 127 CY | $82.62 | $10k | 3% |