HOC-SR 278-05.47
HOC County · est $0.4M
Bid dateThursday, January 25—
HOC County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Parker Corporation | R2D G M INC | R3R C Construction Company And Son | R4INC Axis Civil Construction LLC | R5Ohio-west Virginia Excavating CO | R6Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E96560 CONDUIT, FIELD PAVING OF PIPE, 112" x 75" CONDUIT, | 75 FT | $955 | $1,633 | $1,000 | $1,350 | $856 | $1,200 | 22% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 294 CY | $150 | $155 | $185 | $155 | $229 | $181 | 14% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 59 CY | $361 | $375 | $450 |
| Item | Quantity | R1Parker Corporation | R2D G M INC | R3R C Construction Company And Son | R4INC Axis Civil Construction LLC | R5Ohio-west Virginia Excavating CO | R6Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED, ASPHALT | 267 SY | $5.00 | $12.00 | $25.00 | $20.00 | $21.00 | $14.00 |
| 203E10000 EXCAVATION | 14 CY | $20.00 | $60.00 | $25.00 | $35.00 | $161 | $89.00 |
| 203E20000 EMBANKMENT | 53 CY | $20.00 | $35.00 | $25.00 | $35.00 | $87.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $380 |
| $460 |
| $360 |
| 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 34.2 CY | $550 | $600 | $750 | $725 | $795 | $780 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,250 | $28,000 | $20,000 | $35,000 | $28,700 | $26,000 | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 38 CY | $451 | $470 | $475 | $425 | $575 | $450 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,250 | $6,000 | $20,000 | $20,000 | $55,500 | $30,175 | 5% |
| 452E13040 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 125 SY | $115 | $150 | $200 | $130 | $135 | $185 | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $13,250 | $19,000 | $12,500 | $10,000 | $4,900 | $5,474 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $13,250 | $500 | $12,500 | $9,000 | $13,900 | $18,000 | 4% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 18.6 CY | $650 | $1,000 | $750 | $1,800 | $1,570 | $2,375 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,250 | $10,000 | $14,000 | $3,500 | $7,500 | $11,500 | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $9,250 | $11,000 | $6,500 | $5,000 | $3,000 | $3,500 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,250 | $4,500 | $10,000 | $8,500 | $1,900 | $8,000 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $8,250 | $7,000 | $6,500 | $8,500 | $4,800 | $35,000 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 5,431 LB | $1.25 | $2.50 | $3.00 | $3.00 | $3.25 | $6.00 | 2% |
| 304E20000 AGGREGATE BASE | 85 CY | $65.00 | $100 | $125 | $140 | $113 | $108 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 420 FT | $10.00 | $30.00 | $30.00 | $30.00 | $41.00 | $39.50 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,500 | $2,600 | $2,500 | $2,150 | $3,200 | $2,145 | 1% |
| $103 |
| 204E10000 SUBGRADE COMPACTION | 514 SY | $0.50 | $5.00 | $2.00 | $2.50 | $3.00 | $1.00 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $200 | $300 | $250 | $500 | $900 | $261 |
| 659E10000 SEEDING AND MULCHING | 490 SY | $1.00 | $6.00 | $10.00 | $6.00 | $6.00 | $6.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $2,500 | $1,500 | $1,200 | $1,400 | $1,700 | $1,400 |
| 659E31000 LIME | 0.2 ACRE | $1,250 | $300 | $800 | $100 | $130 | $100 |
| 659E35000 WATER | 3 MGAL | $0.05 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 42 FT | $10.00 | $35.00 | $40.00 | $20.00 | $141 | $27.00 |
| 407E20000 NON-TRACKING TACK COAT | 52 GAL | $4.00 | $3.75 | $25.00 | $5.00 | $5.00 | $3.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $20.00 | $1.00 | $50.00 | $35.00 | $130 | $11.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.07 MILE | $15,500 | $16,000 | $16,000 | $15,500 | $20,000 | $13,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $26,500 | $28,000 | $27,000 | $26,500 | $34,000 | $13,500 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $200 | $2,500 | $10,000 | $1,000 | $9,500 | $12,166 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 38.3 SY | $12.00 | $20.00 | $50.00 | $25.00 | $90.00 | $30.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $1,200 | $2,000 | $6,500 | $2,500 | $6,700 | $2,697 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96560 CONDUIT, FIELD PAVING OF PIPE, 112" x 75" CONDUIT, | 75 FT | $955 | $72k | 22% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 294 CY | $150 | $44k | 13% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 59 CY | $361 | $21k | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 34.2 CY | $550 | $19k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,250 | $17k | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 38 CY | $451 | $17k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,250 | $15k | 5% |
| 452E13040 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 125 SY | $115 | $14k | 4% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $13,250 | $13k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $13,250 | $13k | 4% |