D07-BP/BH FY24
D07 County · est $7.5M
Bid dateThursday, February 8—
D07 County · est $7.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 71 more items below.
| Item | Quantity | R1Euro Paint LLC | R2360 Construction Company INC | R3Kmx Painting INC | R4Elite Contractors INC | R5Apbn INC | R6Corrosion Resistance LTD | R7Panther Industrial Painting LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 88,800 SF | $8.85 | $9.00 | $9.00 | $8.50 | $10.00 | $10.90 | $12.66 | 19% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 52,600 SF | $7.33 | $10.00 | $10.00 | $9.00 | $10.00 | $9.95 | $12.66 | 9% |
| 514E00050 |
| Item | Quantity | R1Euro Paint LLC | R2360 Construction Company INC | R3Kmx Painting INC | R4Elite Contractors INC | R5Apbn INC | R6Corrosion Resistance LTD | R7Panther Industrial Painting LLC |
|---|---|---|---|---|---|---|---|---|
| 607E35000 FENCE REMOVED AND REBUILT | 56 FT | $113 | $113 | $120 | $113 | $113 | $113 | $2,000 |
| 659E10000 SEEDING AND MULCHING | 1,600 SY | $4.95 | $4.95 | $5.00 | $4.95 | $4.95 | $4.95 | $1.00 |
| 659E14000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 54,100 SF |
| $6.61 |
| $10.00 |
| $10.00 |
| $10.00 |
| $10.00 |
| $13.25 |
| $12.66 |
| 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $356,640 | $200,000 | $220,000 | $300,000 | $300,000 | $310,000 | $275,000 | 8% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 33,800 SF | $8.23 | $9.00 | $10.00 | $9.00 | $10.00 | $10.20 | $12.66 | 7% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 24,450 SF | $10.36 | $9.00 | $12.00 | $9.00 | $10.00 | $8.25 | $12.66 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 31,200 SF | $7.56 | $9.00 | $10.00 | $9.00 | $10.00 | $10.45 | $12.66 | 6% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 88,800 SF | $2.00 | $3.00 | $2.00 | $1.90 | $3.00 | $2.00 | $2.00 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 88,800 SF | $2.00 | $2.00 | $2.00 | $1.90 | $2.00 | $2.30 | $2.00 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 88,800 SF | $2.00 | $1.00 | $2.00 | $1.90 | $2.00 | $2.40 | $2.00 | 4% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 8,525 SF | $14.22 | $18.00 | $14.00 | $14.00 | $10.00 | $17.80 | $15.66 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $115,685 | $125,000 | $280,000 | $400,000 | $246,700 | $100,000 | $350,000 | 3% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 54,100 SF | $2.00 | $3.00 | $2.00 | $2.00 | $3.00 | $2.95 | $2.00 | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 54,100 SF | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $3.50 | $2.00 | 3% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 54,100 SF | $2.00 | $1.00 | $1.00 | $2.00 | $2.00 | $3.00 | $2.00 | 3% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 52,600 SF | $2.00 | $3.00 | $2.00 | $2.00 | $2.00 | $2.22 | $2.00 | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 52,600 SF | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.45 | $2.00 | 2% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 52,600 SF | $2.00 | $1.00 | $1.00 | $2.00 | $2.00 | $2.55 | $2.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $82,000 | $75,000 | $100,000 | $100,000 | $50,000 | $50,000 | $150,000 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,925 SY | $40.00 | $30.00 | $40.00 | $32.00 | $40.00 | $28.00 | $45.00 | 2% |
| 80 SY |
| $2.90 |
| $2.90 |
| $3.00 |
| $2.90 |
| $2.90 |
| $3.40 |
| $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.21 TON | $320 | $320 | $1.71 | $320 | $320 | $320 | $200 |
| 659E35000 WATER | 8.64 MGAL | $1.25 | $1.25 | $1.00 | $1.25 | $1.25 | $1.25 | $20.00 |
| 832E30000 EROSION CONTROL | 9,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $19,725 | $19,725 | $20,000 | $19,725 | $19,725 | $19,725 | $19,725 |
| 642E00300 CENTER LINE, TYPE 1 | 0.09 MILE | $17,565 | $17,565 | $18,000 | $17,565 | $17,565 | $17,565 | $17,565 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $75.00 | $80.00 | $50.00 | $50.00 | $100 | $85.00 | $100 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,360 | $2,136 | $2,200 | $2,136 | $2,135 | $2,136 | $2,136 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,360 | $2,358 | $2,200 | $2,358 | $2,135 | $2,358 | $2,358 |
| 614E12420 DETOUR SIGNING | 1 LS | $12,807 | $12,807 | $15,000 | $12,807 | $12,807 | $12,807 | $12,807 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 3 EACH | $6,500 | $1,000 | $1,500 | $1,000 | $500 | $8,400 | $1,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 7 EACH | $15.44 | $15.44 | $16.00 | $15.44 | $15.44 | $15.44 | $15.44 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 32 EACH | $14.28 | $14.28 | $15.00 | $14.28 | $14.28 | $14.28 | $14.28 |
| 614E13350 OBJECT MARKER, ONE WAY | 32 EACH | $19.94 | $19.94 | $20.00 | $19.94 | $19.94 | $19.94 | $19.94 |
| 614E13360 OBJECT MARKER, TWO WAY | 7 EACH | $20.64 | $20.64 | $22.00 | $20.64 | $20.64 | $20.64 | $20.64 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 1 SNMT | $1,189 | $1,189 | $2,200 | $1,189 | $2,000 | $1,189 | $1,189 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.39 MILE | $15,012 | $15,012 | $15,100 | $15,012 | $15,012 | $15,012 | $15,012 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 20 FT | $7.92 | $7.92 | $8.00 | $7.92 | $7.92 | $7.92 | $7.92 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,600 FT | $35.77 | $36.00 | $37.00 | $35.77 | $35.77 | $35.77 | $35.77 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 31,200 SF | $2.00 | $3.00 | $2.00 | $2.00 | $2.00 | $2.25 | $2.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 31,200 SF | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.35 | $2.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 31,200 SF | $2.00 | $1.00 | $1.00 | $2.00 | $2.00 | $2.50 | $2.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 48 MNHR | $100 | $150 | $200 | $150 | $100 | $95.00 | $225 |
| 514E10000 FINAL INSPECTION REPAIR | 14 EACH | $100 | $150 | $200 | $200 | $100 | $300 | $300 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 33,800 SF | $2.00 | $3.00 | $2.00 | $2.00 | $3.00 | $2.15 | $2.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 33,800 SF | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.20 | $2.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 33,800 SF | $2.00 | $1.00 | $1.00 | $2.00 | $2.00 | $2.35 | $2.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 48 MNHR | $100 | $150 | $200 | $150 | $100 | $95.00 | $225 |
| 514E10000 FINAL INSPECTION REPAIR | 14 EACH | $100 | $150 | $200 | $200 | $100 | $300 | $300 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 8,525 SF | $3.88 | $5.00 | $3.00 | $3.00 | $4.00 | $4.40 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 8,525 SF | $3.88 | $3.00 | $2.00 | $3.00 | $4.00 | $4.80 | $3.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 8,525 SF | $3.88 | $2.00 | $2.00 | $3.00 | $3.00 | $5.00 | $3.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 13 MNHR | $100 | $150 | $200 | $150 | $100 | $95.00 | $225 |
| 514E10000 FINAL INSPECTION REPAIR | 4 EACH | $100 | $150 | $200 | $200 | $100 | $300 | $300 |
| 513E21600 STRUCTURAL STEEL FOR REHABILITATION, AS PER PLAN | 778 LB | $50.25 | $40.00 | $50.00 | $40.25 | $45.63 | $45.63 | $40.25 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 195 SF | $107 | $100 | $70.00 | $450 | $150 | $285 | $100 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 195 SF | $107 | $30.00 | $70.00 | $450 | $150 | $79.00 | $100 |
| 513E21600 STRUCTURAL STEEL FOR REHABILITATION, AS PER PLAN | 549 LB | $51.00 | $52.00 | $50.00 | $41.00 | $47.20 | $47.20 | $41.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 151 SF | $138 | $100 | $80.00 | $450 | $150 | $320 | $20.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 151 SF | $138 | $30.00 | $80.00 | $450 | $150 | $100 | $20.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 24,450 SF | $2.00 | $3.00 | $2.00 | $2.00 | $2.00 | $2.05 | $2.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 24,450 SF | $2.00 | $2.00 | $1.00 | $2.00 | $2.00 | $2.35 | $2.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 24,450 SF | $2.00 | $1.00 | $1.00 | $2.00 | $2.00 | $2.45 | $2.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 40 MNHR | $100 | $150 | $200 | $150 | $100 | $95.00 | $225 |
| 514E10000 FINAL INSPECTION REPAIR | 11 EACH | $100 | $150 | $200 | $200 | $100 | $300 | $300 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 46 MNHR | $100 | $150 | $180 | $150 | $100 | $95.00 | $225 |
| 514E10000 FINAL INSPECTION REPAIR | 14 EACH | $100 | $150 | $200 | $200 | $100 | $300 | $300 |
| 516E46701 RESET BEARING, AS PER PLAN | 16 EACH | $825 | $1,940 | $1,000 | $825 | $825 | $1,020 | $825 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $37,200 | $10,000 | $40,000 | $37,200 | $37,200 | $46,000 | $37,200 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $4,675 | $5,000 | $5,500 | $4,675 | $4,675 | $4,675 | $4,675 |
| 513E21599 STRUCTURAL STEEL FOR REHABILITATION | 415 LB | $8.45 | $65.00 | $15.00 | $8.45 | $12.33 | $14.28 | $8.45 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 98 MNHR | $100 | $150 | $180 | $150 | $100 | $95.00 | $225 |
| 514E10000 FINAL INSPECTION REPAIR | 29 EACH | $100 | $150 | $200 | $200 | $100 | $300 | $300 |
| 516E31000 JOINT SEALER | 129 FT | $21.81 | $25.00 | $80.00 | $70.00 | $77.00 | $65.00 | $70.00 |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 14 EACH | $895 | $1,940 | $1,000 | $895 | $1,090 | $1,090 | $895 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $17,200 | $10,000 | $18,000 | $17,200 | $17,200 | $24,000 | $17,200 |
| 517E75501 BRIDGE RAILING REBUILT, AS PER PLAN | 17 FT | $145 | $145 | $160 | $145 | $145 | $160 | $250 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 63 SF | $174 | $225 | $250 | $250 | $275 | $250 | $250 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 26 SY | $879 | $950 | $1,000 | $1,250 | $1,375 | $1,200 | $1,250 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF ABUTMENT | 2 EACH | $10,000 | $1,000 | $4,000 | $1,000 | $1,000 | $3,500 | $1,000 |
| 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI | 5,020 LB | $6.00 | $5.00 | $7.50 | $4.75 | $4.75 | $4.75 | $6.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,650 SY | $40.00 | $28.00 | $38.00 | $32.00 | $30.00 | $28.00 | $45.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,650 SY | $40.00 | $20.00 | $40.00 | $26.50 | $21.50 | $25.00 | $45.00 |
| 513E95020 STRUCTURAL STEEL, MISC.: END FRAME WELD REPAIR | 1 LS | $550 | $4,400 | $1,000 | $550 | $550 | $550 | $550 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 47 MNHR | $100 | $150 | $200 | $150 | $100 | $95.00 | $225 |
| 514E10000 FINAL INSPECTION REPAIR | 14 EACH | $100 | $150 | $200 | $200 | $100 | $300 | $300 |
| 516E46701 RESET BEARING, AS PER PLAN | 6 EACH | $825 | $1,940 | $1,000 | $825 | $825 | $1,020 | $825 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $15,150 | $10,000 | $17,000 | $15,150 | $15,150 | $22,000 | $15,150 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $5,000 | $10,000 | $20,000 | $10,000 | $10,000 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 88,800 SF | $8.85 | $786k | 14% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 52,600 SF | $7.33 | $386k | 7% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 54,100 SF | $6.61 | $358k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $356,640 | $357k | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 33,800 SF | $8.23 | $278k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 24,450 SF | $10.36 | $253k | 5% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 31,200 SF | $7.56 | $236k | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 88,800 SF | $2 | $178k | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 88,800 SF | $2 | $178k | 3% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 88,800 SF | $2 | $178k | 3% |