Figure 0.1 · BRIEFING BID #240086 · ODOT RESULT · awarded Feb 8 DEF-US 127/SR 18/SR 66/SR 281 VAR. DEF County · est $2.5M
Bid date Thursday, February 8 —
Project scope Bid form · ODOT
36 ITEMS Pavement Marking 33% Maintaining Traffic 19% Structures / Bridge 11% Asphalt Paving 8% Removal & Demolition 6% Mobilization & General 6% Item Quantity R1 Gerken Paving INC % of bid 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( 4,002 CY $224 33% 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG 2,017 CY $208 16% 253E02000 PAVEMENT REPAIR 800 CY $340 10% 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" THICKNESS 127,371 SY $1.90 9% 614E11000 MAINTAINING TRAFFIC 1 LS $185,000 7% 624E10000 MOBILIZATION 1 LS $154,000 6% 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( 278 CY $450 5% 202E23500 WEARING COURSE REMOVED 9,602 SY $8.15 3% 617E10100 COMPACTED AGGREGATE 511 CY $142 3% 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG 114 CY $475 2% 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" THICKNES 20,376 SY $2.10 2% 407E20000 NON-TRACKING TACK COAT 13,376 GAL $2.50 1% 254E01600 PATCHING PLANED SURFACE 2,955 SY $10.00 1% 621E00100 RPM 425 EACH $37.00 1% 875E10000 LONGITUDINAL JOINT ADHESIVE 9,746 LB $1.50 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $14,250 1% 644E00404 CHANNELIZING LINE, 12" 5,855 FT $2.00 0% 644E01300 LANE ARROW 117 EACH $95.00 0% 632E26500 DETECTOR LOOP 4 EACH $2,500 0% 644E00500 STOP LINE 1,323 FT $6.00 0%
Show all 36 line items Item Quantity R1 Gerken Paving INC 832E30000 EROSION CONTROL 1,000 EACH $1.00 621E54000 RAISED PAVEMENT MARKER REMOVED 425 EACH $7.00 642E00104 EDGE LINE, 6", TYPE 1 8.26 MILE $900 642E00204 LANE LINE, 6", TYPE 1 5.42 MILE $750 642E00300 CENTER LINE, TYPE 1 6.26 MILE $1,000 644E00620 CROSSWALK LINE, 12" 2,707 FT $2.00 644E00630 CROSSWALK LINE, 24" 568 FT $6.00 644E00700 TRANSVERSE/DIAGONAL LINE 967 FT $6.00 644E00900 ISLAND MARKING 72 SF $6.00
Project details
Description DEF-US 127/SR 18/SR 66/SR 281 VAR.
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →