HIG-SR 247-00.04
HIG County · est $0.8M
Bid dateThursday, February 8—
HIG County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Coopers Excavating LLC | R2Sunesis Construction CO | R3Axis Civil Construction LLC | R4John R Jurgensen Company | R5R C Construction Company And Son | R6INC Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E72501 TYPE A, PRECAST REINFORCED CONCRETE ROUND SECTIONS | 32 FT | $5,600 | $8,686 | $9,000 | $7,540 | $11,500 | $6,500 | 32% |
| 624E10000 MOBILIZATION | 1 LS | $50,000 | $38,492 | $40,000 | $20,000 | $25,000 | $62,000 | 9% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 155 CY | $260 |
| Item | Quantity | R1Coopers Excavating LLC | R2Sunesis Construction CO | R3Axis Civil Construction LLC | R4John R Jurgensen Company | R5R C Construction Company And Son | R6INC Complete General Construction Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $4,800 | $20,000 | $33,207 | $5,500 | $25,000 |
| 202E32600 GUTTER REMOVED | 260 FT | $3.00 | $10.09 | $10.00 | $7.57 | $25.00 | $50.00 |
| 202E38000 GUARDRAIL REMOVED | 568 FT | $4.00 | $7.50 | $7.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $300 |
| $300 |
| $264 |
| $425 |
| $300 |
| 7% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $40,000 | $5,349 | $6,500 | $5,971 | $40,000 | $13,000 | 7% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 24,525 LB | $1.50 | $1.84 | $2.20 | $1.55 | $3.00 | $2.00 | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 76 CY | $375 | $422 | $850 | $656 | $750 | $800 | 5% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 30 CY | $750 | $2,337 | $1,650 | $2,606 | $800 | $1,800 | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $20,000 | $23,537 | $25,000 | $50,583 | $15,000 | $77,000 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 63 CY | $250 | $515 | $250 | $253 | $425 | $515 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 26 CY | $550 | $1,516 | $1,650 | $1,505 | $750 | $2,700 | 3% |
| 601E38000 PAVED GUTTER, TYPE 1-4 | 319 FT | $43.00 | $55.26 | $95.00 | $114 | $75.00 | $75.00 | 2% |
| 503E31100 ROCK EXCAVATION | 159 CY | $85.00 | $90.81 | $100 | $152 | $100 | $1,200 | 2% |
| 606E98000 GUARDRAIL, MISC.: GUARDRAIL, TYPE MGS WITH SOCKETE | 100 FT | $125 | $115 | $115 | $115 | $110 | $145 | 2% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $250 | $750 | $200 | $601 | $275 | $750 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 500 FT | $23.00 | $23.00 | $23.00 | $23.00 | $21.00 | $26.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $5,034 | $10,000 | $29,639 | $27,000 | $13,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $5,600 | $10,000 | $7,454 | $15,000 | $5,000 | 2% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E, (MASH 2016) | 3 EACH | $2,450 | $2,450 | $2,450 | $2,450 | $2,650 | $3,000 | 1% |
| 203E20000 EMBANKMENT | 280 CY | $25.00 | $10.25 | $25.00 | $55.16 | $25.00 | $35.00 | 1% |
| 202E23000 PAVEMENT REMOVED | 444 SY | $15.00 | $13.53 | $15.00 | $18.86 | $25.00 | $20.00 | 1% |
| $7.50 |
| $5.00 |
| $6.00 |
| 203E10000 EXCAVATION | 153 CY | $25.00 | $25.34 | $30.00 | $35.56 | $25.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 405 SY | $1.00 | $3.34 | $3.00 | $4.14 | $2.00 | $15.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $130 | $214 | $220 | $210 | $100 | $355 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $1,300 | $1,300 | $1,300 | $1,300 | $1,850 | $1,475 |
| 659E10000 SEEDING AND MULCHING | 1,370 SY | $2.40 | $2.18 | $3.00 | $1.75 | $10.00 | $2.40 |
| 659E14000 REPAIR SEEDING AND MULCHING | 69 SY | $2.40 | $2.25 | $2.00 | $1.00 | $0.10 | $2.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.19 TON | $1,400 | $1,400 | $870 | $1,500 | $1,200 | $1,400 |
| 659E31000 LIME | 0.28 ACRE | $150 | $450 | $160 | $200 | $800 | $150 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 100 FT | $12.00 | $9.90 | $20.00 | $49.04 | $50.00 | $14.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE THICK | 250 SY | $15.00 | $36.95 | $25.00 | $16.21 | $30.00 | $25.00 |
| 304E20000 AGGREGATE BASE | 78 CY | $85.00 | $78.38 | $100 | $136 | $100 | $85.00 |
| 407E10000 TACK COAT | 278 GAL | $5.00 | $10.00 | $5.00 | $10.00 | $20.00 | $10.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 38 CY | $85.00 | $150 | $110 | $146 | $125 | $85.00 |
| 621E00100 RPM | 4 EACH | $467 | $467 | $467 | $467 | $850 | $467 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $5.00 | $16.74 | $50.00 | $14.86 | $50.00 | $75.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2. BIDIRECTIONAL | 14 EACH | $11.00 | $15.00 | $11.00 | $15.00 | $25.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $13,355 | $13,355 | $13,355 | $13,355 | $13,000 | $13,355 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $19,900 | $19,900 | $19,900 | $19,900 | $18,000 | $19,900 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $50.00 | $68.65 | $65.00 | $86.80 | $40.00 | $85.00 |
| 616E10000 WATER | 0.4 MGAL | $500 | $12.07 | $1.00 | $137 | $1.00 | $200 |
| 202E22900 APPROACH SLAB REMOVED | 67 SY | $55.00 | $47.50 | $45.00 | $50.59 | $100 | $80.00 |
| 202E23500 WEARING COURSE REMOVED | 204 SY | $15.00 | $8.84 | $7.00 | $7.23 | $30.00 | $60.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $17,359 | $20,000 | $25,325 | $15,000 | $30,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 213 CY | $20.00 | $27.05 | $35.00 | $86.21 | $30.00 | $300 |
| 511E71100 CONCRETE, MISC.: 6" CONCRETE SLAB | 2 CY | $600 | $3,479 | $3,000 | $2,183 | $250 | $10,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 128 SY | $40.00 | $35.34 | $34.00 | $35.00 | $50.00 | $35.00 |
| 512E33000 TYPE 2 WATERPROOFING | 215 SY | $20.00 | $28.06 | $26.00 | $25.00 | $45.00 | $25.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 125 SF | $1.00 | $3.75 | $5.00 | $13.15 | $30.00 | $15.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 14 CY | $100 | $133 | $140 | $174 | $125 | $295 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 30 CY | $100 | $129 | $120 | $199 | $125 | $200 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $100 | $2,669 | $4,000 | $1,982 | $500 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E72501 TYPE A, PRECAST REINFORCED CONCRETE ROUND SECTIONS | 32 FT | $5,600 | $179k | 29% |
| 624E10000 MOBILIZATION | 1 LS | $50,000 | $50k | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 155 CY | $260 | $40k | 6% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $40,000 | $40k | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 24,525 LB | $1.5 | $37k | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 76 CY | $375 | $29k | 5% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 30 CY | $750 | $23k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $20,000 | $20k | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 63 CY | $250 | $16k | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 26 CY | $550 | $14k | 2% |