ATB-SR 84/SR 531-11.99/07.52
ATB County · est $2.4M
Bid dateFriday, March 1—
ATB County · est $2.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Ronyak Paving INC | % of bid |
|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (3062 CY | $205 | $225 | 30% |
| 424E14100 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (1838 CY | $275 | $300 | 24% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $173,623 | $115,000 | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 88,161 SY | $1.52 | $2.50 | 6% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 67 EACH | $2,000 | $1,495 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $120,225 | $110,000 | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,000 SY | $32.00 | $44.00 | 3% |
| 608E52000 CURB RAMP | 3,296 SF | $15.50 | $30.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 13,227 GAL | $2.70 | $2.00 | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 23 EACH | $1,300 | $1,065 | 1% |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 13 EACH | $2,200 | $2,650 | 1% |
| 202E30000 WALK REMOVED | 4,337 SF | $6.25 | $5.00 | 1% |
| 253E01000 PAVEMENT REPAIR | 350 SY | $70.00 | $220 | 1% |
| 609E26000 CURB, TYPE 6 | 586 FT | $40.00 | $35.00 | 1% |
| 646E10200 CENTER LINE | 4.15 MILE | $5,040 | $4,200 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,000 | $16,250 | 1% |
| 202E32000 CURB REMOVED | 571 FT | $28.00 | $8.00 | 1% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 10 EACH | $1,500 | $1,300 | 1% |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 9 EACH | $1,500 | $1,600 | 1% |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $2,175 | $1,275 | 1% |
| Item | Quantity | R1Karvo Companies INC | R2Ronyak Paving INC |
|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 1 SY | $15.00 | $500 |
| 203E10000 EXCAVATION | 59 CY | $25.00 | $45.00 |
| 209E60200 LINEAR GRADING | 27 STA | $20.00 | $45.00 |
| 608E10000 4" CONCRETE WALK | 1,009 SF | $10.00 | $15.00 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $1,000 | $2,500 |
| 654E11000 COMMERCIAL FERTILIZER | 0.1 TON | $1,000 | $950 |
| 659E10000 SEEDING AND MULCHING | 751 SY | $1.00 | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 659E31000 LIME | 0.16 ACRE | $150 | $450 |
| 659E35000 WATER | 4.05 MGAL | $1.00 | $10.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,600 LB | $1.00 | $6.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,575 FT | $4.00 | $4.00 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 59 CY | $25.00 | $60.00 |
| 408E10001 PRIME COAT, AS PER PLAN @ 0.40 GAL/SY | 240 GAL | $6.00 | $9.00 |
| 441E70501 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $400 | $1,000 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T = 2") | 32 CY | $125 | $165 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 3 EACH | $250 | $1,300 |
| 646E10010 EDGE LINE, 6" | 0.45 MILE | $4,800 | $4,000 |
| 646E10110 LANE LINE, 6" | 0.96 MILE | $3,300 | $2,750 |
| 646E10300 CHANNELIZING LINE, 8" | 804 FT | $1.85 | $1.55 |
| 646E10310 CHANNELIZING LINE, 12" | 310 FT | $2.00 | $1.60 |
| 646E10400 STOP LINE | 257 FT | $14.50 | $12.00 |
| 646E10520 CROSSWALK LINE, 24" | 540 FT | $12.00 | $10.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 324 FT | $14.50 | $12.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 1 EACH | $600 | $500 |
| 646E20300 LANE ARROW | 26 EACH | $180 | $150 |
| 646E20650 SHARED LANE MARKING | 4 EACH | $210 | $175 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 4 EACH | $1,400 | $1,400 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $100 | $120 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $60.00 | $50.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $250 | $300 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $900 | $750 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 1.92 MILE | $1,020 | $850 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.96 MILE | $1,020 | $850 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 8.3 MILE | $1,450 | $1,200 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.15 MILE | $1,450 | $1,200 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.45 MILE | $1,150 | $950 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,608 FT | $0.80 | $0.65 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 620 FT | $0.90 | $0.75 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 804 FT | $0.80 | $0.65 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 310 FT | $0.90 | $0.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 514 FT | $4.20 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 257 FT | $4.20 | $3.50 |
| 900E00100 RAILROAD FLAGGING SERVICES | 6,750 EACH | $1.00 | $1.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $7,500 | $5,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $1,750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $7,780 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (3062 CY | $205 | $628k | 28% |
| 424E14100 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (1838 CY | $275 | $505k | 23% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $173,623 | $174k | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T | 88,161 SY | $1.52 | $134k | 6% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 67 EACH | $2,000 | $134k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $120,225 | $120k | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,000 SY | $32 | $64k | 3% |
| 608E52000 CURB RAMP | 3,296 SF | $15.5 | $51k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 13,227 GAL | $2.7 | $36k | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 23 EACH | $1,300 | $30k | 1% |